- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
Posted on 2/13/18 at 10:14 pm to Walt OReilly
quote:
Is it really in that bad of shape?
An article I read in 2014 gave it a 3 or 7 (or something) rating out of 100.
I go over it, easily, 30 times a year, and when I do, I tighten my seat belt and pocket my phone. I take that back... my last two trips, I took the 210 Loop out of fear of Ol' Rusty!
Posted on 2/13/18 at 10:30 pm to JPinLondon
I detour. I don’t want to be on that bridge when it goes down like that one in Minneapolis.
Posted on 2/13/18 at 10:33 pm to biggsc
quote:
Would be great to see roadway/bridge projects not take a decade to complete
Cut out some of the corruption and bureaucratic red tape and this can happen.
The knowhow and labor is here...just have to bulldoze through the politics that gum up the works
Posted on 2/13/18 at 11:37 pm to JPinLondon
quote:
I go over it, easily, 30 times a year, and when I do, I tighten my seat belt and pocket my phone. I take that back... my last two trips, I took the 210 Loop out of fear of Ol' Rusty!
You will be pleased to learn that work will begin on the 210 bridge to re-deck the middle span of the bridge later this year. It will take 3 years, and reduce traffic to one lane in both directions. Only in Louisiana would local government chose to renovate a interstate bridge that was rated as in good condition before replacing one that should have already been closed due to its hazardous condition.
LINK
Posted on 2/14/18 at 12:22 am to member12
But will the new bridge still have guns on the railing?
Posted on 2/14/18 at 1:27 am to member12
Guess it’s not as frightening when you see it from afar but the first time I went over it I was like wtf
Posted on 2/14/18 at 3:19 am to member12
They will do 20+ studies before doing anything.
Posted on 2/14/18 at 5:45 am to LSUgusto
The state does not have the now 80% match......that match is ridiculous.
Posted on 2/14/18 at 6:21 am to LSUgusto
Go on...
I’ve always heard it will be an environmental nightmare if they ever try to do it. I also don’t feel the condition is as bad as the 3 year old radio station Facebook post that gets floated around from time to time.
I’ve always heard it will be an environmental nightmare if they ever try to do it. I also don’t feel the condition is as bad as the 3 year old radio station Facebook post that gets floated around from time to time.
Posted on 2/14/18 at 6:28 am to La Squared
Central crude is also north of the river bridge and there’s a small refinery right past Loggerheads. I don’t think the bridge needs to be that high, but there is still traffic that it will need to accommodate.
Posted on 2/14/18 at 6:36 am to NeverRains
quote:
I have to think if its as close to collapsing as everyone says, someone would have done something about it by now or it would have collapsed already
They did. They repainted the pistol guard rails a few years ago because looks is what's important, not structural integrity. The entire structure is being held together with paint and bubble gum.
Posted on 2/14/18 at 7:33 am to Stexas
Yep, it’s the EDC in the groundwater
Posted on 2/14/18 at 7:40 am to NeverRains
quote:
I have to think if its as close to collapsing as everyone says, someone would have done something about it by now or it would have collapsed already
That is dangerous thinking. I'm sure the people in Minnesota thought the same thing.

Posted on 2/14/18 at 7:46 am to Stexas
I recall the EDC leak. I was working at a nearby industry where EDC was used as a feedstock for Vinyl Chloride production. We were told that the loading line to the barge had over twenty clamps. Pretty sad.
Posted on 2/14/18 at 7:52 am to EA6B
quote:
Only in Louisiana would local government chose to renovate a interstate bridge that was rated as in good condition before replacing one that should have already been closed due to its hazardous condition.
Word was here the spans on 210 were found to be made out of the incorrect material spec and have got to be replaced.
My grandfather worked building that bridge and told my mother it was done incorrectly down to the footings. He never would drive over it and chose i10 instead.
Makes me wonder if now he was correct about the footings being shite too since the span is already being replaced due to faulty material.
I'd love to hear if that is correct or not.
This post was edited on 2/14/18 at 8:48 am
Posted on 2/14/18 at 8:07 am to SUB
quote:
BR needs a new bridge too
So we can split up more cozy African American middle class neighborhoods to benefit the white BR businessman? Not under SWB or JBE's watch!!!!
SARCASM ON [OFF]
This post was edited on 2/14/18 at 8:08 am
Posted on 2/14/18 at 8:12 am to member12
issues with this bridge project
1. i've heard, but never gotten confirmation, that there is one company with a dock or something past the bridge that may use boats that require a higher bridge design. this business is minority-owned and it's become a racial thing
2. the biggest real issue is disrupting the EDC that's in the soil under the bridge. this has always been the limiting factor on replacing the bridge and why progress is so slow
3. they have to build a bridge while leaving this one open, and 210 is already about to undergo years of work. the logistics are just a nightmare. it's not feasible to not have this bridge open, though, due to the plants right on the other side of the water
1. i've heard, but never gotten confirmation, that there is one company with a dock or something past the bridge that may use boats that require a higher bridge design. this business is minority-owned and it's become a racial thing
2. the biggest real issue is disrupting the EDC that's in the soil under the bridge. this has always been the limiting factor on replacing the bridge and why progress is so slow
3. they have to build a bridge while leaving this one open, and 210 is already about to undergo years of work. the logistics are just a nightmare. it's not feasible to not have this bridge open, though, due to the plants right on the other side of the water
Posted on 2/14/18 at 8:14 am to shawnlsu
quote:
They did. They repainted the pistol guard rails a few years ago because looks is what's important, not structural integrity. The entire structure is being held together with paint and bubble gum.
this is not true. DOTD is always inspecting that bridge
it has a bad rating b/c of how high it is and the angle of ascent/descent. an article with that ratings gets shared on social media every couple months as a scare tactic, but the bridge is not about to fall down
Popular
Back to top



2








