Started By
Message

re: Space-X and Intel partner to build a 100M sq ft semiconductor fabrication plant in TX

Posted on 8/7/26 at 10:08 am to
Posted by bluedragon
Birmingham
Member since May 2020
9962 posts
Posted on 8/7/26 at 10:08 am to
Ever been in a nuke plant?

The regulations are extreme with no logical purpose. No one is stealing a core in a lunchbox and walk out alive. Adjust the regulations to construct and operate…..reduce the upfront overall costs.
Posted by RIPMachoMan
Member since Jun 2011
9369 posts
Posted on 8/7/26 at 10:09 am to
BREC golf course uses 900k per day?!?

100k is a third of 300k which was said to be the average.

A lot of water regardless
Posted by lsu777
Lake Charles
Member since Jan 2004
38543 posts
Posted on 8/7/26 at 10:22 am to
quote:

BREC golf course uses 900k per day?!?


during peak the 5 do yea

quote:

100k is a third of 300k which was said to be the average.



300k is what the average golf course uses, I say pretty much every course no matter location uses 100k in water per day


quote:

A lot of water regardless



no its not, you just arent used to industrial scale. go look how much Exxon BR uses, I posted the numbers in a previous post
Posted by DVinBR
Member since Jan 2013
15911 posts
Posted on 8/7/26 at 10:44 am to
all-time bubble
Posted by stout
Porte du Lafitte
Member since Sep 2006
184359 posts
Posted on 8/7/26 at 10:44 am to
quote:

all-time bubble



Building chips is a bubble?
Posted by SUB
Silver Tier TD Premium
Member since Jan 2009
26220 posts
Posted on 8/7/26 at 10:53 am to
quote:

umm BREC courses in baton rouge uses up to ~900k per day. Depends on the time of the year but almost every golf courses uses 100k per day


Where do you get this info?
Posted by ell_13
Member since Apr 2013
88323 posts
Posted on 8/7/26 at 11:08 am to
quote:

Ever been in a nuke plant?
Yes. Many times.
quote:

The regulations are extreme with no logical purpose. No one is stealing a core in a lunchbox and walk out alive. Adjust the regulations to construct and operate…..reduce the upfront overall costs.
Great idea. How has no one thought of this?

The regulations are what they are. Trump implemented the Advance Act and now the NRC has restructured but regulations don’t just disappear overnight. Data centers are needed yesterday. SMRs are still nuclear reactors. They need protections, engineering, maintenance, security, cyber security, operations, procurement, EP. All of that exists at current nuclear facilities. GE and Westinghouse want to build them but they can’t just go anywhere.
first pageprev pagePage 5 of 5Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on X, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookXInstagram