Started By
Message

Space-X and Intel partner to build a 100M sq ft semiconductor fabrication plant in TX

Posted on 8/7/26 at 7:59 am
Posted by stout
Porte du Lafitte
Member since Sep 2006
184353 posts
Posted on 8/7/26 at 7:59 am




quote:

Terafab is a planned massive, vertically integrated semiconductor manufacturing complex in Grimes County, Texas, jointly developed by SpaceX and Tesla alongside partners like Intel. The first phase carries an initial investment of $16.8 billion, aiming to produce over one terawatt of AI computing capacity annually.

Location and Scale

Site: Planned for Grimes County, Texas (near the former Gibbons Creek Power Plant site outside College Station).

Size: Expected to span a colossal 100 million square feet across a roughly 2,300-acre footprint.

Jobs: Projected to create more than 3,000 direct high-tech and operations jobs.

Core Purpose and Products

Under One Roof: Consolidates chip design, advanced logic and memory fabrication, packaging, and testing into a single continuous pipeline.

Target Applications: Builds specialized high-performance processors to power Tesla’s Optimus humanoid robots and Cybercabs, as well as high-power compute requirements for space-based data centers.

Goal: Designed to bridge the massive gap between current global semiconductor manufacturing output and the multi-terawatt AI compute demands projected by Musk's companies.







Posted by ell_13
Member since Apr 2013
88320 posts
Posted on 8/7/26 at 8:01 am to
Can’t imagine the amount of power and water that’s gonna require
Posted by stout
Porte du Lafitte
Member since Sep 2006
184353 posts
Posted on 8/7/26 at 8:04 am to
quote:

Can’t imagine the amount of power



Elon recently bought his own power company. He bought APR Energy for a little over a billion


quote:

and water



Man, if only 71% of earth was covered in that stuff or something.

Posted by SuperSaint
Sorting Out OT BS Since '2007'
Member since Sep 2007
151420 posts
Posted on 8/7/26 at 8:04 am to
Posted by bluedragon
Birmingham
Member since May 2020
9960 posts
Posted on 8/7/26 at 8:05 am to
Now compare the water use with a golf course. Then STFU over some thing few people know about. Meanwhile Westinghouse and GE have filed with the government to produce small nuke plants on location. Give it time to catch up.
Posted by UptownJoeBrown
Baton Rouge
Member since Jul 2024
11516 posts
Posted on 8/7/26 at 8:05 am to
Don’t bet against Elon.
Posted by Mr Sausage
Cat Spring, Texas
Member since Oct 2011
15838 posts
Posted on 8/7/26 at 8:07 am to
quote:

Can’t imagine the amount of power and water that’s gonna require


The site is a decommissioned power plant with cooling lake. The lake is 2,770 surface acres in size and holds 26,171 acre-feet of water. Published plans call for use of this as the water source instead of groundwater.
Posted by RIPMachoMan
Member since Jun 2011
9365 posts
Posted on 8/7/26 at 8:10 am to
quote:

Man, if only 71% of earth was covered in that stuff or something.


Yeah… salt is great with metal
Posted by stout
Porte du Lafitte
Member since Sep 2006
184353 posts
Posted on 8/7/26 at 8:10 am to
quote:

Don’t bet against Elon.



Elon knows that eventually we will have to defend Taiwan from China and that will disrupt semiconductors worldwide. Surprised he's the first to bring manufacturing back to the USA at scale.


BTW, this will be a short drive for the new rare earth processing plant they are building in Vinton, LA.


quote:

Aclara Resources is investing $277 million to build the first heavy rare earth separation facility in the U.S. at the Port of Vinton in Calcasieu Parish, Louisiana. Set to begin construction in 2026 and target operations by 2028, the plant will process raw materials shipped from South America to supply critical tech and defense manufacturing.
Posted by stout
Porte du Lafitte
Member since Sep 2006
184353 posts
Posted on 8/7/26 at 8:12 am to
quote:

Yeah… salt is great with metal



The guy launching rockets into the moon has never heard of desalination. You should message him and make him aware, though I am not sure he can afford to build a desalination plant.

Besides, read the upper post about where the water will come from.
Posted by RIPMachoMan
Member since Jun 2011
9365 posts
Posted on 8/7/26 at 8:12 am to
quote:

Then STFU over some thing few people know about.


you think water supply is something few people know about?
Posted by RIPMachoMan
Member since Jun 2011
9365 posts
Posted on 8/7/26 at 8:14 am to
quote:

The guy launching rockets into the moon has never heard of desalination. You should message him and make him aware, though I am not sure he can afford to build a desalination plant.


Outside of a couple companies using underwater servers to control temperatures, I have yet to hear a plan to use desalination.

It’s not that it’s too expensive but why do it when there is land with fresh water to purchase
Posted by ell_13
Member since Apr 2013
88320 posts
Posted on 8/7/26 at 8:16 am to
I work for a nuclear power company. I know a little about it.
Posted by stout
Porte du Lafitte
Member since Sep 2006
184353 posts
Posted on 8/7/26 at 8:16 am to
I was just saying if it had to come to that

The water scare is such a forced concern for data centers and plants like this. It's a silly media scare tactic like the black mold scare, where now people think even a little mildew is black mold that will kill you.
Posted by BlackPot
Member since Oct 2016
2730 posts
Posted on 8/7/26 at 8:17 am to
quote:

power and water


I love how this is a factor now all of a sudden.

Building a new Target soon, "Gah that's going to be a lot of water"
Posted by ell_13
Member since Apr 2013
88320 posts
Posted on 8/7/26 at 8:19 am to
I don’t think you are understanding the scale of this place. I have no doubt there are plans to consume power and water from nearby sources. I’m not against the project at all. It just something that came to mind because of how large it is. Calm down.
This post was edited on 8/7/26 at 8:20 am
Posted by bluedragon
Birmingham
Member since May 2020
9960 posts
Posted on 8/7/26 at 8:20 am to
It’s coming.
Posted by notsince98
KC, MO
Member since Oct 2012
22294 posts
Posted on 8/7/26 at 8:20 am to
quote:

The water scare is such a forced concern for data centers and plants like this


I have been involved with data center projects that had to be scrapped mid design because of water issues. Have you?
Posted by Salmon
I helped draft the email
Member since Feb 2008
86620 posts
Posted on 8/7/26 at 8:21 am to
the font they used in that graphic is the same font that every futuristic video game where you have to fight monsters uses

feels like foreshadowing
Posted by ell_13
Member since Apr 2013
88320 posts
Posted on 8/7/26 at 8:21 am to
quote:

The water scare
Its been a topic since Michael Berry starting shorting it. Way before data centers.
first pageprev pagePage 1 of 3Next pagelast page

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on X, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookXInstagram