Started By
Message

How long will the loop take?

Posted on 9/10/26 at 1:04 pm
Posted by nicholastiger
Member since Jan 2004
57628 posts
Posted on 9/10/26 at 1:04 pm
State leaders and lawmakers met to discuss a possible Baton Rouge loop Wednesday as drivers were stuck in a traffic apocalypse that snarled traffic to a stop across the Capital City for more than nine hours.

According to State Rep. Dixon McMakin, the Governor’s Office, DOTD Secretary Glen Ledet, Senator Franklin Foil, Senator Rick Edmonds and McMakin were all part of the discussions.

Wednesday morning, a big rig overturned near Dalrymple, leading to a nearly ten-hour shutdown of Interstate 10 westbound.
Posted by BabyTac
Austin, TX
Member since Jun 2008
17304 posts
Posted on 9/10/26 at 1:06 pm to
However long it takes to figure out it makes sense considering the pockets that’ll have to get greased.
Posted by Traffic Circle
Down the Rabbit Hole
Member since Nov 2013
5175 posts
Posted on 9/10/26 at 1:06 pm to
350 more studies required
Posted by Lsuhoohoo
Member since Sep 2007
102552 posts
Posted on 9/10/26 at 1:08 pm to
Well its 2026....so the feasibility studies should be completed by 2056. Then the environmental impact studies can begin.
Posted by LegendInMyMind
Member since Apr 2019
76517 posts
Posted on 9/10/26 at 1:10 pm to
quote:

State Rep. Dixon McMakin

That name just sounds made up.
Posted by Sam Quint
Member since Sep 2022
9649 posts
Posted on 9/10/26 at 1:10 pm to
quote:

State leaders and lawmakers met to discuss a possible Baton Rouge loop Wednesday

lol it's funny that this is being reported as if it's the first time this idea dawned on someone
Posted by CoachChappy
Member since May 2013
34361 posts
Posted on 9/10/26 at 1:11 pm to
It will never happen. NIMBY
Posted by SparkyWilson
Member since May 2026
341 posts
Posted on 9/10/26 at 1:12 pm to
quote:

Well its 2026....so the feasibility studies should be completed by 2056. Then the environmental impact studies can begin.


You have to blame the Fed for this requirement. I doubt they'll wave it.

And it's a monumental undertaking just to line up and settle all the property acquisition that will be required.
Posted by WylieTiger
Member since Nov 2006
14851 posts
Posted on 9/10/26 at 1:12 pm to
They will need a study to line up a study. That will be at least 5 years and 5 million just for that.
Posted by Snipe
Member since Nov 2015
17319 posts
Posted on 9/10/26 at 1:16 pm to
quote:

How long will the loop take?


Let's see! I first heard the legislature talking about the need for a loop in Baton Rouge around 1998. So given that it's been studied and talked about and reviewed for the last 28 years I figure ground breaking should begin around the summer of 2061 with a scheduled completion date of 2096 which will be extended to 2246 because of delays and more studies to determine the economic impact of the delays.

By the time we have flying cars for everyone they'll have it done thought, don't you worry.
Posted by nicholastiger
Member since Jan 2004
57628 posts
Posted on 9/10/26 at 1:17 pm to
you would need a new bridge to replace the one they want to route the loop around
that bridge is a dump and not safe at all

so in essence you would need two new bridges

on top of that they built the Audubon bridge which no one uses

This post was edited on 9/10/26 at 1:18 pm
Posted by ragincajun03
Member since Nov 2007
30105 posts
Posted on 9/10/26 at 1:31 pm to
quote:

quote:

quote:
State Rep. Dixon McMakin


That name just sounds made up.


Useless pandering politician who authored a bill in last year’s legislative session to make NIL earnings free from state income taxes.

I think he also considered running for Julie Letlow’s Congressional seat.
This post was edited on 9/10/26 at 1:33 pm
Posted by CocomoLSU
Inside your dome.
Member since Feb 2004
157509 posts
Posted on 9/10/26 at 1:33 pm to
quote:

How long will the loop take?

Well, preliminary discussions for it have taken about 30+ years, so basing my estimation on that...100,000,000 years.
This post was edited on 9/10/26 at 1:34 pm
Posted by TigerBait2008
Boulder,CO
Member since Jun 2008
40812 posts
Posted on 9/10/26 at 1:34 pm to
As long as ut takes for you not to give up on baseball team.
Posted by Bard
Definitely NOT an admin
Member since Oct 2008
60456 posts
Posted on 9/10/26 at 1:36 pm to
Are they planning on building a bridge for it or using an existing one?

As we all know, it takes 47 years to build a needed bridge around here, but only 20 when it's in the middle of nowhere.
Posted by Butch Baum
Member since Oct 2007
3648 posts
Posted on 9/10/26 at 1:37 pm to
quote:

quote: State Rep. Dixon McMakin That name just sounds made up.


Would be better if his last name was Myazz
Posted by sta4ever
Member since Aug 2014
18071 posts
Posted on 9/10/26 at 1:38 pm to
Like anything to do with our infrastructure, they’re 20-30 years too late. A loop should have been done in 2005. At this point in time, we need 3 loops, and 3 new bridges. And Airline Hwy needs to become an elevated interstate, with the original highway being used as exits to get people to wherever they need to go. Of course it’d take 20 years for them to break ground on just one of these projects, so we might as well suck it up at this point.
Posted by Y.A. Tittle
Member since Sep 2003
111780 posts
Posted on 9/10/26 at 1:40 pm to
quote:

to discuss


They've been doing this for 50+ years.
Posted by Shexter
Prairieville
Member since Feb 2014
21983 posts
Posted on 9/10/26 at 1:54 pm to

Baton Rouge and it's loop have been abandoned.

New elevated interstate from New Orleans to SpaceX in the works.
Posted by Keith13
Member since Apr 2024
575 posts
Posted on 9/10/26 at 1:56 pm to
No one reading this thread today will be alive to drive on the BR loop
first pageprev pagePage 1 of 2Next pagelast page