Started By
Message

MSY Flyover Ramp to become first diverging diamond Interchange in Louisiana

Posted on 6/19/19 at 2:21 pm
Posted by Adam4848
LA
Member since Apr 2006
19014 posts
Posted on 6/19/19 at 2:21 pm
quote:

Gilchrist Construction Company’s proposal utilized a diverging diamond interchange to improve traffic flow at the intersection of Loyola Dr. and I-10, which would eliminate the need for a left turn signal at the interstate. This alternative would be one of the first diverging diamond interchanges constructed in Louisiana. The solution would also reconfigure the proposed elevated on and off ramps from New Orleans to a single structure in the median of Airport Access Road south of Veterans Blvd. The proposal also provided aesthetic enhancements that would be a first for the region that include color, creative lighting, and landscaping.


LINK

Pretty interesting

quote:

A design-build contract execution is scheduled for late August 2019, as well as a groundbreaking in the fall of 2019. This project will cost $125.6 million. Once the design phase is completed, construction is anticipated to begin in early 2020, with an estimated completion of mid to late 2023.


I can hold my breath but not that long.
This post was edited on 6/19/19 at 2:29 pm
Posted by OysterPoBoy
City of St. George
Member since Jul 2013
35480 posts
Posted on 6/19/19 at 2:22 pm to
Can a brotha get a pic or something?
Posted by Golfer
Member since Nov 2005
75052 posts
Posted on 6/19/19 at 2:22 pm to
I believe the i10/Pecue exit in BR will be a diverging diamond as well.
Posted by upgrayedd
Lifting at Tobin's house
Member since Mar 2013
134887 posts
Posted on 6/19/19 at 2:22 pm to
quote:

A design-build contract execution is scheduled for late August 2019, as well as a groundbreaking in the fall of 2019. This project will cost $125.6 million. Once the design phase is completed, construction is anticipated to begin in early 2020, with an estimated completion of mid to late 2023.
Posted by MorbidTheClown
Baton Rouge
Member since Jan 2015
66364 posts
Posted on 6/19/19 at 2:23 pm to
quote:

diverging diamond


i think i saw that movie.
Posted by OldManRiver
Prairieville, LA
Member since Jan 2005
6925 posts
Posted on 6/19/19 at 2:23 pm to
quote:

Can a brotha get a pic or something?


This post was edited on 6/19/19 at 2:24 pm
Posted by Pedro
Geaux Hawks
Member since Jul 2008
33692 posts
Posted on 6/19/19 at 2:23 pm to
Here OP

Posted by LNCHBOX
70448
Member since Jun 2009
84304 posts
Posted on 6/19/19 at 2:23 pm to
quote:

A design-build contract execution is scheduled for late August 2019, as well as a groundbreaking in the fall of 2019. This project will cost $125.6 million. Once the design phase is completed, construction is anticipated to begin in early 2020, with an estimated completion of mid to late 2023.


So what's the guess on actual completion? 2025 seems like the an appropriate spot to set the over under at
Posted by TigersSEC2010
Warren, Michigan
Member since Jan 2010
37372 posts
Posted on 6/19/19 at 2:23 pm to
I’m not in the construction industry, but how the hell does it take three years to complete this?
Posted by tigerpimpbot
Chairman of the Pool Board
Member since Nov 2011
67014 posts
Posted on 6/19/19 at 2:23 pm to
quote:

The proposal also provided aesthetic enhancements that would be a first for the region that include color, creative lighting, and landscaping.


Don’t forget graffiti.
Posted by 50_Tiger
Dallas TX
Member since Jan 2016
40163 posts
Posted on 6/19/19 at 2:24 pm to
Three years for an overpass? WTF????
Posted by arseinclarse
Algiers Purnt
Member since Apr 2007
34421 posts
Posted on 6/19/19 at 2:24 pm to


Posted by Packer
IE, California
Member since May 2017
7839 posts
Posted on 6/19/19 at 2:24 pm to
quote:

The proposal also provided aesthetic enhancements that would be a first for the region that include color, creative lighting, and landscaping.


Affirmative action is now hitting our infrastructure
Posted by MorbidTheClown
Baton Rouge
Member since Jan 2015
66364 posts
Posted on 6/19/19 at 2:25 pm to
i sure hope they install cameras. it's gonna be fun watching louisiana drivers try to navigate that thing.
Posted by TheHarahanian
Actually not Harahan as of 6/2023
Member since May 2017
19567 posts
Posted on 6/19/19 at 2:25 pm to
It'll be ready about 5 years after the new airport opens.
Posted by Adam4848
LA
Member since Apr 2006
19014 posts
Posted on 6/19/19 at 2:26 pm to
Posted by chinhoyang
Member since Jun 2011
23631 posts
Posted on 6/19/19 at 2:27 pm to
Posted by upgrayedd
Lifting at Tobin's house
Member since Mar 2013
134887 posts
Posted on 6/19/19 at 2:27 pm to
quote:

Three years for an overpass? WTF????


I was laughing because they'll never finish it in 3 years. It'll probably be 4 or 5
Posted by OysterPoBoy
City of St. George
Member since Jul 2013
35480 posts
Posted on 6/19/19 at 2:27 pm to
Within the first week there will be a car on fire in a spot that blocks all lanes and causes a 6 hour delay on I-10.
Posted by Saskwatch
Member since Feb 2016
16604 posts
Posted on 6/19/19 at 2:27 pm to
quote:

diverging diamond interchange




Kenner people can't navigate dat. Some one wheel in the meat wagon.



Page 1 2 3 4 5 6 7
Jump to page
first pageprev pagePage 1 of 7Next pagelast page

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram