- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
Memphis plant powering Elon Musk's data centers is so loud, residents say they can't sleep
Posted on 9/14/26 at 9:24 pm
Posted on 9/14/26 at 9:24 pm
Loading Twitter/X Embed...
If tweet fails to load, click here. Are Meta's data centers in Louisiana away from civilization? Anybody know?
Posted on 9/14/26 at 9:28 pm to rickgrimes
Well i can tell you the local municipality allowed it to happen, whatever that is, in both instances.
Posted on 9/14/26 at 9:30 pm to rickgrimes
Does it drown out the gunfire ?
Posted on 9/14/26 at 9:32 pm to rickgrimes
Wish someone would tell the cicadas here that they are supposed to be quieter than 40 dB.
Posted on 9/14/26 at 9:32 pm to rickgrimes
Sounds not much different than a rushing river or a waterfall nearby. The beeping would get annoying though.
It’s interesting to see the rest of the country getting a taste of industrial noise pollution. We grew up near a rail yard and it was noise constantly. But it never stopped us from sleeping. Trust that. We were too tired from working all day.
It’s interesting to see the rest of the country getting a taste of industrial noise pollution. We grew up near a rail yard and it was noise constantly. But it never stopped us from sleeping. Trust that. We were too tired from working all day.
Posted on 9/14/26 at 9:34 pm to rickgrimes
I wonder what the dBs are inside the houses?
Surprised the center is that close to suburbia
Surprised the center is that close to suburbia
Posted on 9/14/26 at 9:35 pm to rickgrimes
That’s heavy equipment noise from construction, not the actual data center. Surely you aren’t this dumb?
Posted on 9/14/26 at 9:36 pm to Pendulum
Gas turbines really arent that loud.
Posted on 9/14/26 at 9:36 pm to rickgrimes
quote:
Are Meta's data centers in Louisiana away from civilization? Anybody know?
The are in North Louisiana
Posted on 9/14/26 at 9:36 pm to rickgrimes
[The construction work* is so loud,]
They got 2 shifts going.
They got 2 shifts going.
This post was edited on 9/14/26 at 9:40 pm
Posted on 9/14/26 at 9:37 pm to Shorts Guy
put them by landfills, solar farms and prisons.
call them the
Data/Trash/Solar/Penal Complex.
call them the
Data/Trash/Solar/Penal Complex.
Posted on 9/14/26 at 9:39 pm to backbone
They are literally working 24/7 at this site to build and retrofit the existing power plant to run the Data centers that are currently being built. They are Hiring 2000 more workers this month, so better get used to it…
Posted on 9/14/26 at 9:41 pm to LsShoeBAW68
The point I’m making is it’s not data center noise, it’s construction noise. That will end once center is built.
Posted on 9/14/26 at 9:45 pm to rickgrimes
quote:
Are Meta's data centers in Louisiana away from civilization? Anybody know?
The AI DC going in in st Francisville is isolated in the farther southwest corner of the parish near the river, near paper mill, Hood container, etc. It's an industrial area with almost no houses on the road.
Posted on 9/14/26 at 9:50 pm to backbone
quote:
The point I’m making is it’s not data center noise, it’s construction noise. That will end once center is built.
Space X already disclosed the noise is coming from 60 gas powered turbines at the site.
Posted on 9/14/26 at 9:50 pm to TigersnJeeps
The new mega large data centers are often built in more rural areas but I've seen data centers in New Jersey and Virginia that were built right along side of neighborhoods.
Posted on 9/14/26 at 9:52 pm to UltimaParadox
Turbines for what? They’re running off the electrical grid bonehead.
Posted on 9/14/26 at 9:59 pm to backbone
Temporary turbines until it’s fully built out to run off the grid