Started By
Message

New Library + Construction & Advanced Manufacturing Building Renderings

Posted on 5/13/26 at 2:17 pm
Posted by GeorgeReymond
Buckhead
Member since Jan 2013
10411 posts
Posted on 5/13/26 at 2:17 pm
Both buildings will border the new engineering quad, alongside PFT, the Energy, Coast & Environment Building, and any other facilities they have planned.





New Library














Construction & Advanced Manufacturing Building

(perspective from S. Stadium Drive)


(perspective from the future quad)


This post was edited on 5/13/26 at 6:34 pm
Posted by sdim2901
jasper,tx
Member since Nov 2014
27 posts
Posted on 5/13/26 at 2:18 pm to
It will never be ready in time.
Posted by The Hurricane
Gulf of Mexico
Member since Aug 2011
10377 posts
Posted on 5/13/26 at 2:19 pm to
Parking is really going to be scarce.
Posted by kingbob
Sorrento, LA
Member since Nov 2010
70800 posts
Posted on 5/13/26 at 2:21 pm to
Les Miles has lost control of construction & advanced manufacturing
Posted by Tigerbait46
Member since Dec 2005
8066 posts
Posted on 5/13/26 at 2:24 pm to
beautiful, the CAM building in particular.

love the connectivity from the old quad to the newer side of campus with the library in between. lots of green space replacing an ugly/transitional area of campus.
Posted by GeorgeReymond
Buckhead
Member since Jan 2013
10411 posts
Posted on 5/13/26 at 2:24 pm to
I believe they plan to build a parking garage on the other side of the public safety building. Not sure when that’ll happen though
Posted by RummelTiger
Official TD Sauces Club Member
Member since Aug 2004
93739 posts
Posted on 5/13/26 at 2:31 pm to
Looks awesome!
Posted by tiger81
Brentwood, TN.
Member since Jan 2008
21261 posts
Posted on 5/13/26 at 2:39 pm to
Very cool, I might have to re-enroll......
Posted by GeorgeReymond
Buckhead
Member since Jan 2013
10411 posts
Posted on 5/13/26 at 2:52 pm to
Totally agree. The master plan ultimately includes demolishing Lockett, converting that space into a green area, and creating a Tiger Walk that connects the new dorms north of the Enchanted Forest, runs along the Indian Mounds and the backside of the quad, wraps around the new library, and follows the creek behind the business college to West Parker Blvd.

Will definitely help with connectivity. The red dotted line for reference.

Posted by landmanner
Louisiana
Member since May 2006
3499 posts
Posted on 5/13/26 at 2:55 pm to
Looking at those pics, LSU still has some of the best looking girls in the SEC
Posted by SaveFarris
Member since Apr 2012
2768 posts
Posted on 5/13/26 at 3:03 pm to
None of the people are wearing earbuds and only 2 people are looking at their phones.

Completely unbelievable.
Posted by boxcarbarney
Above all things, be a man
Member since Jul 2007
26909 posts
Posted on 5/13/26 at 3:06 pm to
Are the bathroom glory holes drawn in the plans, or is that more of a means and methods contractor option?
Posted by StrongOffer
Member since Sep 2020
7079 posts
Posted on 5/13/26 at 3:32 pm to
The library is going to take up the entire Quad? Am I seeing that right?
Posted by Geauxldilocks
Member since Aug 2018
6609 posts
Posted on 5/13/26 at 3:33 pm to
Good to see LSU has discovered better architects than some of the other recent new buildings. Looks fabulous.
Posted by semjase
New Smyrna Beach FL
Member since May 2014
16221 posts
Posted on 5/13/26 at 3:45 pm to
quote:

Very cool, I might have to re-enroll.
Me too.

Another year or two of Tiger Band!

Mrs. Semjase says she aint movin back to BR for ANY reason, so we'd have to set up a temporary "Home and Away" visitation plan every few whit weeks until I had enough hours for a 2nd Bachelors or initial Masters.

Here we go! (Semjase is the middle Bass Drum)


(Semjase is the first Bass Drum here; about to march "Down the Hill." )
Posted by ipodking
#StopTalkingAboutWomensSports
Member since Jun 2008
58985 posts
Posted on 5/13/26 at 3:51 pm to
Posted by SammyTiger
Baton Rouge, LA
Member since Feb 2009
79620 posts
Posted on 5/13/26 at 3:54 pm to
But what will Robert Mann cry about?
Posted by SoloTiger
Member since Aug 2016
10957 posts
Posted on 5/13/26 at 4:05 pm to
Brick and mortar campuses are becoming more and more irrelevant in the AI age.
Posted by GeorgeReymond
Buckhead
Member since Jan 2013
10411 posts
Posted on 5/13/26 at 4:07 pm to
No, the library will just anchor the north end of the quad. There's no renderings of the quad but here's an aerial of where it'll be. It'll replace all those old warehouses scattered across that side of campus. Will be a huge improvement.

This post was edited on 5/13/26 at 5:48 pm
Posted by Sweep Da Leg
Member since Sep 2013
4129 posts
Posted on 5/13/26 at 5:27 pm to
I hope Middleton becomes it’s name
first pageprev pagePage 1 of 3Next pagelast page

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on X, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookXInstagram