- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
Potential sites for new Mississippi River bridge narrowed to 17
Posted on 9/28/21 at 11:05 am
Posted on 9/28/21 at 11:05 am
LINK
It is going to take 30 years to narrow down the remaining 17
quote:
Kara Moree, a project manager with Atlas Technical Consultants, says the team initially identified 32 proposed sites along the river from Brusly to Donaldsonville and has since eliminated 15 through a round of screening that included navigational analysis, travel demand information and technical bridge parameters. The team also eliminated sites that might contain protected wildlife, public recreational areas and other “sensitive resources,” she said.
It is going to take 30 years to narrow down the remaining 17
Posted on 9/28/21 at 11:06 am to TigerTatorTots
It’ll never be ready in time.
Posted on 9/28/21 at 11:07 am to TigerTatorTots
One day our great great grandchildren can sit in traffic waiting to cross the bridge.
Posted on 9/28/21 at 11:08 am to TigerTatorTots
quote:
District member Eric Kalivoda said funding for the bridge, aside from state and federal funding, will likely come from a toll.
At this point I'd be willing to pay a toll in order to get across the river within 5mins as opposed to the 30mins it takes now
This post was edited on 9/28/21 at 11:09 am
Posted on 9/28/21 at 11:11 am to TigerTatorTots
I swear, we need the zombie of Huey long back for a month so he can just cut though all the red tape and make actual decisions.
This is like trying to take a woman to dinner. You can either waste all night talking about where you could go, or you can be a man and make a decision and just take her arse somewhere
This is like trying to take a woman to dinner. You can either waste all night talking about where you could go, or you can be a man and make a decision and just take her arse somewhere
Posted on 9/28/21 at 11:11 am to TigerTatorTots
Weren’t we at 4 options like 5 years ago? What the hell happened
Posted on 9/28/21 at 11:11 am to TigerTatorTots
quote:
is going to take 30 years to narrow down the remaining 17
People are going to make entire careers from research and studies.
Posted on 9/28/21 at 11:12 am to Ed Osteen
quote:
Weren’t we at 4 options like 5 years ago? What the hell happened
The Joys of Bureaucracy
Posted on 9/28/21 at 11:12 am to TigerTatorTots
Just look at how long it’s taken them to get where they are with the Picou bridge on I 10. And they are no where even close to being finished with that. This new Miss River bridge will never be completed in our lifetime.
This post was edited on 9/28/21 at 11:15 am
Posted on 9/28/21 at 11:14 am to TigerTatorTots
Consultants love those studies.
Posted on 9/28/21 at 11:14 am to Ed Osteen
quote:
Weren’t we at 4 options like 5 years ago? What the hell happened
Exactly, I remember seeing the graphic on here. And didn't Bernhard or some other local business man offer to bankroll the whole thing and have the tolls paid back to him?
Posted on 9/28/21 at 11:15 am to TigerTatorTots
quote:
Potential sites for new Mississippi River bridge narrowed to 17
quote:
team initially identified 32 proposed sites along the river from Brusly to Donaldsonville
This is the most Louisiana thing I've read today.
Screw letting California sink into the Pacific ocean. Louisiana needs to slide off into the Gulf first.
Posted on 9/28/21 at 11:15 am to TigerTatorTots
The entire landscape of SELA will be changed by the time they make a decision
Posted on 9/28/21 at 11:16 am to HuskyPanda
quote:Bernhard owns ATLAS lol
And didn't Bernhard or some other local business man offer to bankroll the whole thing and have the tolls paid back to him?
Posted on 9/28/21 at 11:16 am to fr33manator
quote:
swear, we need the zombie of Huey long back for a month so he can just cut though all the red tape and make actual decisions
Wouldn’t matter. Too many beaks wanting to get wet. Huey didn’t have to deal with all that shite. At least not to the extent one does now.
Posted on 9/28/21 at 11:18 am to Ed Osteen
quote:
Weren’t we at 4 options like 5 years ago? What the hell happened
Local politicians all fighting to have it put on their place or their cronies’ place so they can make money off of it. For starters.
Posted on 9/28/21 at 11:18 am to HuskyPanda
quote:
And didn't Bernhard or some other local business man offer to bankroll the whole thing and have the tolls paid back to him?
Don’t act like Bernhard was doing this out of the goodness of his heart. His companies would get the contract at huge markups and have a crazy amount of interest tacked on the payback.
Posted on 9/28/21 at 11:21 am to T
I’m just glad I have access to that beautiful wide-open Audubon bridge in New Roads.
Only wish the traffic stuck on the MRB could sit and watch me as I drive over it.
All by myself
Only wish the traffic stuck on the MRB could sit and watch me as I drive over it.
All by myself
Popular
Back to top
Follow TigerDroppings for LSU Football News