Posted by
Message
Adam4848
LSU Fan
LA
Member since Apr 2006
12467 posts
 Online 

MSY Flyover Ramp to become first diverging diamond Interchange in Louisiana
quote:

Gilchrist Construction Company’s proposal utilized a diverging diamond interchange to improve traffic flow at the intersection of Loyola Dr. and I-10, which would eliminate the need for a left turn signal at the interstate. This alternative would be one of the first diverging diamond interchanges constructed in Louisiana. The solution would also reconfigure the proposed elevated on and off ramps from New Orleans to a single structure in the median of Airport Access Road south of Veterans Blvd. The proposal also provided aesthetic enhancements that would be a first for the region that include color, creative lighting, and landscaping.


LINK

Pretty interesting

quote:

A design-build contract execution is scheduled for late August 2019, as well as a groundbreaking in the fall of 2019. This project will cost $125.6 million. Once the design phase is completed, construction is anticipated to begin in early 2020, with an estimated completion of mid to late 2023.


I can hold my breath but not that long.
This post was edited on 6/19 at 2:29 pm


OysterPoBoy
LSU Fan
BR
Member since Jul 2013
14876 posts

re: MSY Flyover Ramp to become first diverging diamond Interchange in Louisiana
Can a brotha get a pic or something?


Golfer
LSU Fan
Member since Nov 2005
72325 posts

re: MSY Flyover Ramp to become first diverging diamond Interchange in Louisiana
I believe the i10/Pecue exit in BR will be a diverging diamond as well.


Replies (0)
Replies (0)
120
upgrayedd
Lamar Fan
Lifting at Tobin's house
Member since Mar 2013
91429 posts

re: MSY Flyover Ramp to become first diverging diamond Interchange in Louisiana
quote:

A design-build contract execution is scheduled for late August 2019, as well as a groundbreaking in the fall of 2019. This project will cost $125.6 million. Once the design phase is completed, construction is anticipated to begin in early 2020, with an estimated completion of mid to late 2023.


MorbidTheClown
LSU Fan
Baton Rouge
Member since Jan 2015
31962 posts

re: MSY Flyover Ramp to become first diverging diamond Interchange in Louisiana
quote:

diverging diamond


i think i saw that movie.


Replies (0)
Replies (0)
60
OldManRiver
LSU Fan
Prairieville, LA
Member since Jan 2005
5076 posts

re: MSY Flyover Ramp to become first diverging diamond Interchange in Louisiana
quote:

Can a brotha get a pic or something?


This post was edited on 6/19 at 2:24 pm


Pedro
Wisc-Milwaukee Fan
the one and only
Member since Jul 2008
23052 posts

re: MSY Flyover Ramp to become first diverging diamond Interchange in Louisiana
Here OP



LNCHBOX
LSU Fan
70001
Member since Jun 2009
54567 posts

re: MSY Flyover Ramp to become first diverging diamond Interchange in Louisiana
quote:

A design-build contract execution is scheduled for late August 2019, as well as a groundbreaking in the fall of 2019. This project will cost $125.6 million. Once the design phase is completed, construction is anticipated to begin in early 2020, with an estimated completion of mid to late 2023.


So what's the guess on actual completion? 2025 seems like the an appropriate spot to set the over under at


TigersSEC2010
Mesa, AZ
Member since Jan 2010
30954 posts

re: MSY Flyover Ramp to become first diverging diamond Interchange in Louisiana
I’m not in the construction industry, but how the hell does it take three years to complete this?


tigerpimpbot
Jacksonville St. Fan
Florida Board
Member since Nov 2011
55316 posts

re: MSY Flyover Ramp to become first diverging diamond Interchange in Louisiana
quote:

The proposal also provided aesthetic enhancements that would be a first for the region that include color, creative lighting, and landscaping.


Don’t forget graffiti.


Replies (0)
Replies (0)
130
50_Tiger
New Orleans Pelicans Fan
Dallas TX
Member since Jan 2016
25122 posts

re: MSY Flyover Ramp to become first diverging diamond Interchange in Louisiana
Three years for an overpass? WTF????


arseinclarse
USA Fan
Gentilly
Member since Apr 2007
25882 posts

re: MSY Flyover Ramp to become first diverging diamond Interchange in Louisiana




Packer
Wisconsin Fan
California
Member since May 2017
2911 posts

re: MSY Flyover Ramp to become first diverging diamond Interchange in Louisiana
quote:

The proposal also provided aesthetic enhancements that would be a first for the region that include color, creative lighting, and landscaping.


Affirmative action is now hitting our infrastructure


Replies (0)
Replies (0)
173
MorbidTheClown
LSU Fan
Baton Rouge
Member since Jan 2015
31962 posts

re: MSY Flyover Ramp to become first diverging diamond Interchange in Louisiana
i sure hope they install cameras. it's gonna be fun watching louisiana drivers try to navigate that thing.


TheHarahanian
LSU Fan
Duh
Member since May 2017
9208 posts

re: MSY Flyover Ramp to become first diverging diamond Interchange in Louisiana
It'll be ready about 5 years after the new airport opens.


Replies (0)
Replies (0)
50
Adam4848
LSU Fan
LA
Member since Apr 2006
12467 posts
 Online 

re: MSY Flyover Ramp to become first diverging diamond Interchange in Louisiana


Replies (0)
Replies (0)
70
chinhoyang
LSU Fan
Member since Jun 2011
15702 posts

re: MSY Flyover Ramp to become first diverging diamond Interchange in Louisiana


upgrayedd
Lamar Fan
Lifting at Tobin's house
Member since Mar 2013
91429 posts

re: MSY Flyover Ramp to become first diverging diamond Interchange in Louisiana
quote:

Three years for an overpass? WTF????


I was laughing because they'll never finish it in 3 years. It'll probably be 4 or 5


Replies (0)
Replies (0)
60
OysterPoBoy
LSU Fan
BR
Member since Jul 2013
14876 posts

re: MSY Flyover Ramp to become first diverging diamond Interchange in Louisiana
Within the first week there will be a car on fire in a spot that blocks all lanes and causes a 6 hour delay on I-10.


Replies (0)
Replies (0)
340
Saskwatch
Ole Miss Fan
Member since Feb 2016
6062 posts

re: MSY Flyover Ramp to become first diverging diamond Interchange in Louisiana
quote:

diverging diamond interchange




Kenner people can't navigate dat. Some one wheel in the meat wagon.





Page 1 2 3 4 5 6 7
Jump to page
first pageprev pagePage 1 of 7next pagelast page

Back to top

logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram