- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
Airport to open 7-8 years before roads to it finished.
Posted on 11/25/17 at 10:06 am
Posted on 11/25/17 at 10:06 am
Airport to be completed before exit to it started.
Idiotic all around. Kenner should just shut down construction until the state figures out when they and the feds can agree on I10 changes.
The amount of time wasted on studies now, boggles my mind.
It's almost 2018, no study even started, airport is nearly 50% complete. Study could take two years alone.
Loyola drive will be the new exit to the interstate.
This entire airport plan is silly. It wasn't really needed and now it's about to create
Nearly a decade of traffic hell.
Cliffs.
Nola wanted new airport
Building new terminals on other side of airport.
No plans to get people to airport in place from interstate other than existing already congested roads.
I feel like I'm about to be reminded of Austin or worse Baton Rouge traffic.
Idiotic all around. Kenner should just shut down construction until the state figures out when they and the feds can agree on I10 changes.
The amount of time wasted on studies now, boggles my mind.
It's almost 2018, no study even started, airport is nearly 50% complete. Study could take two years alone.
Loyola drive will be the new exit to the interstate.
This entire airport plan is silly. It wasn't really needed and now it's about to create
Nearly a decade of traffic hell.
Cliffs.
Nola wanted new airport
Building new terminals on other side of airport.
No plans to get people to airport in place from interstate other than existing already congested roads.
I feel like I'm about to be reminded of Austin or worse Baton Rouge traffic.
This post was edited on 11/25/17 at 10:09 am
Posted on 11/25/17 at 10:10 am to Napoleon
quote:
No plans to get people to airport in place from interstate other than existing already congested roads.
I'm sure there are interim plans using existing infrastructure......
Posted on 11/25/17 at 10:12 am to Napoleon
I thought this was going to be about an airport in some third world country. Nope, it's Louisiana .
Posted on 11/25/17 at 10:13 am to Napoleon
quote:
Airport to open 7-8 years before roads to it finished.
Airport is a waste of money unless it involves a new hub.
Posted on 11/25/17 at 10:14 am to member12
Nah. It is extremely necessary. MSY is an outdated mess.
A modern airport is extremely needed.
A modern airport is extremely needed.
Posted on 11/25/17 at 10:14 am to Sid in Lakeshore
The issue is, they know they are building a new airport. They knew four years ago. So how come they don't even have plans yet?
Bainbridge and Aberdeen being the entrances is odd.
The first thing greeting passengers arriving in NOLA will be Mr. Binky's porno shop and the blight of Susan Park.
There are business on loyola that have no idea of they will be forced to close or not.
Meanwhile the airport is already getting windows and electrical installed.
Bainbridge and Aberdeen being the entrances is odd.
The first thing greeting passengers arriving in NOLA will be Mr. Binky's porno shop and the blight of Susan Park.
There are business on loyola that have no idea of they will be forced to close or not.
Meanwhile the airport is already getting windows and electrical installed.
This post was edited on 11/25/17 at 10:16 am
Posted on 11/25/17 at 10:15 am to Napoleon
Everyone knew this was going to happen 5+ years ago when they announced the new airport project, but no one wanted to say anything publicly. This, not designing the aiport to handle future passenger rail, and not designing internal circulation to get people from the current parking garages and rental car center to the new termunal were insane frick ups.
Posted on 11/25/17 at 10:16 am to GreatLakesTiger24
quote:
I thought this was going to be about an airport in some third world country. Yep, it's Louisiana
Posted on 11/25/17 at 10:17 am to NOLALGD
Actually they have a plan for the rental cars.
There is a tunnel that was supposed to connect veterans to airline under the runways.
They may open it up and run shuttles through it.
There is a tunnel that was supposed to connect veterans to airline under the runways.
They may open it up and run shuttles through it.
Posted on 11/25/17 at 10:18 am to NOLALGD
And yes, they should have had light rail from the airport to the city.
Posted on 11/25/17 at 10:20 am to Napoleon
I have a little inside info about the project, the tunnel might happen but that is at least several years out and will not be functional before the new terminal opens.
Posted on 11/25/17 at 10:43 am to Napoleon
quote:
So how come they don't even have plans yet?
because there were too busy being triggered by PC BS and tearing down every statue they can find state wide i would assume
Posted on 11/25/17 at 11:07 am to GreatLakesTiger24
quote:
I thought this was going to be about an airport in some third world country. Yep, it's Louisiana
FIFY
Posted on 11/25/17 at 11:12 am to keakar
You wanna know what the rush to build the new terminal is for? So there will be a plaque that says "Mitch Landrieu - Mayor" on it.
Would a shiny, new airport be better than the existing terminal? Sure it would, but at what cost? Like most things NOLA, the city's limited resources are being allocated poorly.
If you're going to built a new airport, why remodel the existing one? (Ravens-49ers Super Bowl. What year was that?) Why build a whole new rental car facility on the Airline side? Wouldn't it have made more sense to build it on the Veterans side and spent 2 or 3 years shuttling to it, rather than 40 or 50 shuttling back to to the Airline side from the new terminal? How many more gates will there be in the new terminal? We had a whole concourse (A) closed and unused for years that could have been renovated or demolished and rebuilt at the existing terminal. Don't tell me this was about capacity.
This is going to be an expensive boondoggle, just like most things involving the New Orleans govt. The Aviation Board's relative success isn't the result of management's business acumen and/or operating efficiency. They just have the ability to extort the airlines that want to service a tourist destination.
Would a shiny, new airport be better than the existing terminal? Sure it would, but at what cost? Like most things NOLA, the city's limited resources are being allocated poorly.
If you're going to built a new airport, why remodel the existing one? (Ravens-49ers Super Bowl. What year was that?) Why build a whole new rental car facility on the Airline side? Wouldn't it have made more sense to build it on the Veterans side and spent 2 or 3 years shuttling to it, rather than 40 or 50 shuttling back to to the Airline side from the new terminal? How many more gates will there be in the new terminal? We had a whole concourse (A) closed and unused for years that could have been renovated or demolished and rebuilt at the existing terminal. Don't tell me this was about capacity.
This is going to be an expensive boondoggle, just like most things involving the New Orleans govt. The Aviation Board's relative success isn't the result of management's business acumen and/or operating efficiency. They just have the ability to extort the airlines that want to service a tourist destination.
Posted on 11/25/17 at 11:15 am to Napoleon
I mean, as soon as they started site clearing for this terminal, I thought to myself, surely they are going to soon start the roadway infrastructure that's going to be necessary to actually get people there. I kept wondering and wondering, when that was going to start, knowing there was no way those little streets and existing interstate exit configurations would be able to handle it.
It should be unbelievable but, alas, it would be shocking to know that they would have competently planned this ENTIRE project.
It should be unbelievable but, alas, it would be shocking to know that they would have competently planned this ENTIRE project.
Posted on 11/25/17 at 11:25 am to Y.A. Tittle
Here is a serious question,how will passengers get from the old terminal to the new terminal ? As far as I know there is no way (train etc) that will connect the two.
Posted on 11/25/17 at 11:27 am to bayou choupique
The won't have to. All passenger activity will be out of the new terminal. The existing terminal will be used for cargo and general aviation, I think.
Posted on 11/25/17 at 11:31 am to Fun Bunch
quote:
ah. It is extremely necessary. MSY is an outdated mess.
A modern airport is extremely needed.
This is true.
Posted on 11/25/17 at 11:31 am to Sid in Lakeshore
quote:
m sure there are interim plans using existing infrastructure......
Ohhh ABSOLUTELY these government folks are forward thinking like that.
This post was edited on 11/25/17 at 11:32 am
Popular
Back to top
Follow TigerDroppings for LSU Football News