- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
I am remodeling my kitchen, and not sure where to start.
Posted on 1/5/15 at 3:13 pm
Posted on 1/5/15 at 3:13 pm
-new cabinets
-new counter tops
-new gas stove replacing my electric
-new smoke ventilation from stove
Should I just use company that does cabinets & countertops? Are there even companies that do both? Or do i need to hire a general contractor?
anyone have any recs in the NOLA area?
-new counter tops
-new gas stove replacing my electric
-new smoke ventilation from stove
Should I just use company that does cabinets & countertops? Are there even companies that do both? Or do i need to hire a general contractor?
anyone have any recs in the NOLA area?
Posted on 1/5/15 at 3:21 pm to Lester Earl
There are companies that do both cabinets & countertops, you could probably get a better deal with on than hiring a contractor. But if you need gas run to your kitchen and have to demo to fit in a new ventilation for your stove I would get a contractor to make sure all building codes are followed.
Posted on 1/5/15 at 3:40 pm to Lester Earl
I have a few rec's but first, are you familiar with construction and will you be monitoring the work yourself?
What time frame are you looking for the reno to be completed?
Do you have a raised or slab house?
What parish are you living?
What time frame are you looking for the reno to be completed?
Do you have a raised or slab house?
What parish are you living?
Posted on 1/5/15 at 3:43 pm to PaBon
Slab house in jefferson parish.
Am I familiar with construction, well I had a construction gig for about a year and a half, but I never messed with kitchens. I will be there to oversee most of it.
Time frame, I was hoping no more than 5-7 days. My kitchen is small.
Am I familiar with construction, well I had a construction gig for about a year and a half, but I never messed with kitchens. I will be there to oversee most of it.
Time frame, I was hoping no more than 5-7 days. My kitchen is small.
Posted on 1/5/15 at 3:48 pm to Lester Earl
Do you currently have gas run to the house? ie water heater?
Posted on 1/5/15 at 3:54 pm to Bayou Teche Bengal
quote:
There are companies that do both cabinets & countertops, you could probably get a better deal with on than hiring a contractor.
I agree with this. Be careful if you are changing your kitchen layout, moving appliances around, etc... That will probably require changes to your electrical/plumbing/gas lines, not to mention flooring (if you're keeping your existing flooring).
You may want to consider putting in new countertops and paint or refinish your existing cabinets and upgrade the hardware. That could save you a bundle.
Posted on 1/5/15 at 4:19 pm to Neauxla
quote:
Do you currently have gas run to the house? ie water heater?
Hopefully you have gas run to the range but it has been swapped out for electric. That would be the best. How old is your house?
Posted on 1/5/15 at 4:25 pm to Lester Earl
Kitchens are expensive. What kind of budget are you trying to stay within?
Posted on 1/5/15 at 4:40 pm to Sid in Lakeshore
quote:
Hopefully you have gas run to the range but it has been swapped out for electric.
I was pleasantly surprised to find this in my kitchen.
Posted on 1/5/15 at 4:48 pm to Lester Earl
quote:
Time frame, I was hoping no more than 5-7 days. My kitchen is small.
Good luck with that. I just redid mine, I have a small kitchen too (10'x10' L-shaped) and my renovation lasted a few months dealing with multiple contractors and their unfortunate schedules. I was able to find a contractor that did my cabinets and granite for 5100$. Which is 10k less than the other contractors quoted. However, my cabinets arent custom and the guys screwed up and had to re-install them. It was a pain in the arse, but it's over and I saved a good bit of money.
If you're handy at all you can save a good bit doing the rest of the stuff. I did my backsplash and undercabinet lighting thanks to youtube for the help.
This post was edited on 1/5/15 at 4:52 pm
Posted on 1/5/15 at 4:57 pm to Lester Earl
Where to start - gas instead of electric. Everything else is 2nd.
Posted on 1/5/15 at 8:00 pm to Lester Earl
If modifying floor plan is desired, sketch floor plan based on the kitchen triangle. Then select your appliances (sink, dishwasher, range/oven, vent hood, microwave) so you have dimensions for the cabinet folks. Install more drawers than shelving units below the counters. Go find some cabinets you like, not worrying about countertops and whether they install them. Any tile/granite place can handle the counter installation. Install task lighting at the major work areas. Light is very important.
Posted on 1/5/15 at 9:53 pm to Crusty
quote:
Kitchens are expensive. What kind of budget are you trying to stay within?
This. Take whatever budget you have in mind and add about 25 % to it.
Posted on 1/5/15 at 10:26 pm to Crusty
quote:
Kitchens are expensive. What kind of budget are you trying to stay within?
roughly 10k.
i have gas in my house. I have a gas dryer about 5ft from where my stove is.
Posted on 1/5/15 at 10:42 pm to Lester Earl
Lester, can you post some pics of your kitchen?
Posted on 1/6/15 at 6:14 am to Lester Earl
Don't just have the cabinets redone in the same manner. Think about what you use and what makes sense. I had big pot drawers put where cabinets had been, added a pull out trash, etc. the space was the same but the way they were constructed was different.
I also switched the sink to a big arse undivided sink. It just makes sense. I can put icechests in there, turn my big pots on the side while cleaning, etc. I have no idea if it's trendy or not but it is a working sink and I love it.
I also switched the sink to a big arse undivided sink. It just makes sense. I can put icechests in there, turn my big pots on the side while cleaning, etc. I have no idea if it's trendy or not but it is a working sink and I love it.
Posted on 1/6/15 at 6:53 am to Sir Drinksalot
Start by realizing that 5-7 days is NOT realistic. Renos are more complicated than new builds. You don't know what you'll find behind that old stove or cabinets.
Agree on the large basin sink, and to look carefully at what you store in the kitchen to get the new cabinets to meet your needs.
Agree on the large basin sink, and to look carefully at what you store in the kitchen to get the new cabinets to meet your needs.
Posted on 1/6/15 at 7:26 am to Lester Earl
5-7 days is not realistic, especially for an older place
you start tearing stuff out and you have no idea what you are going to find
I ended up having to re-wire my entire house while doing my kitchen
couple of things that I consider a must when remodeling an old kitchen:
- full extension drawer slides
- pull out shelves on the bottom cabinets
- cabinets all the way to the ceiling
if its small, try to have any wasted space and try to get as much counter space as possible
design a place/cabinet for the microwave so that it isn't just sitting on the counter
you start tearing stuff out and you have no idea what you are going to find
I ended up having to re-wire my entire house while doing my kitchen
couple of things that I consider a must when remodeling an old kitchen:
- full extension drawer slides
- pull out shelves on the bottom cabinets
- cabinets all the way to the ceiling
if its small, try to have any wasted space and try to get as much counter space as possible
design a place/cabinet for the microwave so that it isn't just sitting on the counter
Posted on 1/6/15 at 9:46 am to Salmon
i mean it doesn't have to be 5-7 days, that is just what i thought cause it's pretty small
but you're right, it is older and i can foresee some possible complications once everything is removed.
With that said, my first call should be to ________ whom?
ill post the floor plan in a minute. i dont have pics
but you're right, it is older and i can foresee some possible complications once everything is removed.
With that said, my first call should be to ________ whom?
ill post the floor plan in a minute. i dont have pics
Popular
Back to top

11







