Started By
Message

I am remodeling my kitchen, and not sure where to start.

Posted on 1/5/15 at 3:13 pm
Posted by Lester Earl
3rd Ward
Member since Nov 2003
291710 posts
Posted on 1/5/15 at 3:13 pm
-new cabinets
-new counter tops
-new gas stove replacing my electric
-new smoke ventilation from stove


Should I just use company that does cabinets & countertops? Are there even companies that do both? Or do i need to hire a general contractor?

anyone have any recs in the NOLA area?
Posted by Bayou Teche Bengal
On the Bayou Teche
Member since Sep 2014
118 posts
Posted on 1/5/15 at 3:21 pm to
There are companies that do both cabinets & countertops, you could probably get a better deal with on than hiring a contractor. But if you need gas run to your kitchen and have to demo to fit in a new ventilation for your stove I would get a contractor to make sure all building codes are followed.
Posted by PaBon
UPT 17th W/D
Member since Sep 2014
2273 posts
Posted on 1/5/15 at 3:40 pm to
I have a few rec's but first, are you familiar with construction and will you be monitoring the work yourself?

What time frame are you looking for the reno to be completed?

Do you have a raised or slab house?

What parish are you living?



Posted by Lester Earl
3rd Ward
Member since Nov 2003
291710 posts
Posted on 1/5/15 at 3:43 pm to
Slab house in jefferson parish.

Am I familiar with construction, well I had a construction gig for about a year and a half, but I never messed with kitchens. I will be there to oversee most of it.

Time frame, I was hoping no more than 5-7 days. My kitchen is small.
Posted by Neauxla
New Orleans
Member since Feb 2008
34804 posts
Posted on 1/5/15 at 3:48 pm to
Do you currently have gas run to the house? ie water heater?
Posted by Jax-Tiger
Vero Beach, FL
Member since Jan 2005
28253 posts
Posted on 1/5/15 at 3:54 pm to
quote:

There are companies that do both cabinets & countertops, you could probably get a better deal with on than hiring a contractor.


I agree with this. Be careful if you are changing your kitchen layout, moving appliances around, etc... That will probably require changes to your electrical/plumbing/gas lines, not to mention flooring (if you're keeping your existing flooring).

You may want to consider putting in new countertops and paint or refinish your existing cabinets and upgrade the hardware. That could save you a bundle.
Posted by Sid in Lakeshore
Member since Oct 2008
41956 posts
Posted on 1/5/15 at 4:19 pm to
quote:

Do you currently have gas run to the house? ie water heater?


Hopefully you have gas run to the range but it has been swapped out for electric. That would be the best. How old is your house?
Posted by Crusty
Baton Rouge
Member since Aug 2011
2780 posts
Posted on 1/5/15 at 4:25 pm to
Kitchens are expensive. What kind of budget are you trying to stay within?
Posted by LNCHBOX
70448
Member since Jun 2009
89448 posts
Posted on 1/5/15 at 4:40 pm to
quote:

Hopefully you have gas run to the range but it has been swapped out for electric.


I was pleasantly surprised to find this in my kitchen.
Posted by BRgetthenet
Member since Oct 2011
118276 posts
Posted on 1/5/15 at 4:41 pm to
Start in the kitchen.

Posted by Delacroix
Member since Oct 2008
4044 posts
Posted on 1/5/15 at 4:48 pm to
quote:

Time frame, I was hoping no more than 5-7 days. My kitchen is small.


Good luck with that. I just redid mine, I have a small kitchen too (10'x10' L-shaped) and my renovation lasted a few months dealing with multiple contractors and their unfortunate schedules. I was able to find a contractor that did my cabinets and granite for 5100$. Which is 10k less than the other contractors quoted. However, my cabinets arent custom and the guys screwed up and had to re-install them. It was a pain in the arse, but it's over and I saved a good bit of money.

If you're handy at all you can save a good bit doing the rest of the stuff. I did my backsplash and undercabinet lighting thanks to youtube for the help.
This post was edited on 1/5/15 at 4:52 pm
Posted by PlanoPrivateer
Frisco, TX
Member since Jan 2004
2990 posts
Posted on 1/5/15 at 4:57 pm to
Where to start - gas instead of electric. Everything else is 2nd.
Posted by ChEgrad
Member since Nov 2012
3954 posts
Posted on 1/5/15 at 8:00 pm to
If modifying floor plan is desired, sketch floor plan based on the kitchen triangle. Then select your appliances (sink, dishwasher, range/oven, vent hood, microwave) so you have dimensions for the cabinet folks. Install more drawers than shelving units below the counters. Go find some cabinets you like, not worrying about countertops and whether they install them. Any tile/granite place can handle the counter installation. Install task lighting at the major work areas. Light is very important.
Posted by Will Cover
Davidson, NC
Member since Mar 2007
40395 posts
Posted on 1/5/15 at 9:53 pm to
quote:

Kitchens are expensive. What kind of budget are you trying to stay within?


This. Take whatever budget you have in mind and add about 25 % to it.

Posted by Lester Earl
3rd Ward
Member since Nov 2003
291710 posts
Posted on 1/5/15 at 10:26 pm to
quote:

Kitchens are expensive. What kind of budget are you trying to stay within?




roughly 10k.

i have gas in my house. I have a gas dryer about 5ft from where my stove is.
Posted by iluvdatiger
Baton Rouge, LA
Member since Jan 2004
43029 posts
Posted on 1/5/15 at 10:42 pm to
Lester, can you post some pics of your kitchen?
Posted by Sir Drinksalot
Member since Aug 2005
16891 posts
Posted on 1/6/15 at 6:14 am to
Don't just have the cabinets redone in the same manner. Think about what you use and what makes sense. I had big pot drawers put where cabinets had been, added a pull out trash, etc. the space was the same but the way they were constructed was different.

I also switched the sink to a big arse undivided sink. It just makes sense. I can put icechests in there, turn my big pots on the side while cleaning, etc. I have no idea if it's trendy or not but it is a working sink and I love it.
Posted by hungryone
river parishes
Member since Sep 2010
11987 posts
Posted on 1/6/15 at 6:53 am to
Start by realizing that 5-7 days is NOT realistic. Renos are more complicated than new builds. You don't know what you'll find behind that old stove or cabinets.

Agree on the large basin sink, and to look carefully at what you store in the kitchen to get the new cabinets to meet your needs.
Posted by Salmon
I helped draft the email
Member since Feb 2008
86757 posts
Posted on 1/6/15 at 7:26 am to
5-7 days is not realistic, especially for an older place

you start tearing stuff out and you have no idea what you are going to find

I ended up having to re-wire my entire house while doing my kitchen

couple of things that I consider a must when remodeling an old kitchen:

- full extension drawer slides
- pull out shelves on the bottom cabinets
- cabinets all the way to the ceiling

if its small, try to have any wasted space and try to get as much counter space as possible

design a place/cabinet for the microwave so that it isn't just sitting on the counter
Posted by Lester Earl
3rd Ward
Member since Nov 2003
291710 posts
Posted on 1/6/15 at 9:46 am to
i mean it doesn't have to be 5-7 days, that is just what i thought cause it's pretty small

but you're right, it is older and i can foresee some possible complications once everything is removed.



With that said, my first call should be to ________ whom?


ill post the floor plan in a minute. i dont have pics
first pageprev pagePage 1 of 3Next pagelast page

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on X, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookXInstagram