- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
Posted on 8/24/22 at 9:01 pm to JodyPlauche
quote:
JodyPlauche
Your dad achieved justice. He didn’t murder anyone.
Posted on 8/24/22 at 9:01 pm to gsvar2004
I'd really like to hear from someone here as to why they think this is a good idea. I'd imagine this might be the absolute worst idea DOTD could possibly think of.
Nicholson from the bridge to campus is already a third world level road. I assume they're going to wait until the bridge is under construction to inevitably repave it.
Nicholson from the bridge to campus is already a third world level road. I assume they're going to wait until the bridge is under construction to inevitably repave it.
Posted on 8/24/22 at 9:01 pm to gsvar2004
It supposedly reduces total construction time by a lot. Tremendous pain for one year or merely a lot of pain for significantly longer.
Posted on 8/24/22 at 9:02 pm to gsvar2004
This is absolutely fricked
There’s no way this happens
They needed to build a loop before they tried to do this project if they want to shut the only legitimate throughway down.
There’s no way this happens
They needed to build a loop before they tried to do this project if they want to shut the only legitimate throughway down.
Posted on 8/24/22 at 9:04 pm to gsvar2004
This can’t be real…
There’s no way they are going to shut down a 6 lane interstate to 2.
There’s no way they are going to shut down a 6 lane interstate to 2.
Posted on 8/24/22 at 9:05 pm to brett408
quote:
Whoever came up with this plan is
Doesn’t give a frick and is Getting paid out their arse and will make this project last 10x longer than needed to milk every penny out of it
Posted on 8/24/22 at 9:08 pm to dyslexiateechur
Can I celebrate moving or will 08 explode? 

Posted on 8/24/22 at 9:09 pm to LSU-MNCBABY
quote:
Doesn’t give a frick and is Getting paid out their arse and will make this project last 10x longer than needed to milk every penny out of it
The smart thing to do would be to tell them they have 6 months and every day over is a $100K fine.
Of course, it'll exceed the allotted time and they'll have skeleton crews on nights and no work on weekends, then blame the delay on weather.
Posted on 8/24/22 at 9:12 pm to gsvar2004
these the same people that poured one piling on the college flyover in a year?
Posted on 8/24/22 at 9:15 pm to jamiegla1
quote:
these the same people that poured one piling on the college flyover in a year?
It took these people almost a year to re-pour some patches and curbs on Bluebonnet and within a few months about 1/5th was breaking loose.
Posted on 8/24/22 at 9:23 pm to upgrayedd
Real estate in the feliciana about to boom
Posted on 8/24/22 at 9:25 pm to upgrayedd
quote:
The smart thing to do would be to tell them they have 6 months and every day over is a $100K fine.
That’s only the smart thing to do if you can actually get someone competent to bid the job on those terms.
The problem with asking for a miracle is that the only contractors willing to agree to it are the ones who will just tell the state what they want to hear, then roll the dice on the state being too chickenshit to actually collect on the LD’s. As it turns out, those aren’t generally the guys you actually want doing the work.
If the state would grow some balls and put one of these operations out of business over failure to meet the contract terms, they might be able to get some honest bids. But whenever that almost happens, somebody’s cousin in the legislature/capitol manages to make the problem disappear.
Regardless, unfortunately this job isn’t the one to make an example out of. This job is the reason you make an example on the smaller ones.
Posted on 8/24/22 at 9:25 pm to gsvar2004
Is it simply to repair/replace what is there, or are they going to add lanes, or what?
Posted on 8/24/22 at 9:26 pm to gsvar2004
Anyone willing to put money on this plan being finished in a year?
I’m putting the over/under at 20 months
I’m putting the over/under at 20 months
Posted on 8/24/22 at 9:28 pm to Rebel
Justified homicide, but still a homicide.
Posted on 8/24/22 at 9:28 pm to gsvar2004
Price of progress
I10 desperately needs to be rebuilt.
I10 desperately needs to be rebuilt.
Posted on 8/24/22 at 9:30 pm to pwejr88
quote:
“All good. I’ll just take the surface streets.” Sincerely, 200k people in Baton Rouge
Except for the major construction projects that will be happening on Lee Dr., Bluebonnet, and Nicholson all at the same time.
Pretty ridiculous for that long of a stretch on a major interstate being reduced to 1 lane for that long of a time. I guess they figured we went 60 years with I-10 being one lane coming off the bridge we might as well make a lot more 1 lane.
And if they are saying up to a year you should figure at least 1.5 - 2 years
Posted on 8/24/22 at 9:34 pm to gsvar2004
Desperately need to widen that section or I-10. Wish there was a way to avoid this lane closure though.
Posted on 8/24/22 at 9:35 pm to lostinbr
quote:
The smart thing to do would be to tell them they have 6 months and every day over is a $100K fine.
And every day under is a $100k bonus??