re: AI Data centers

Posted on 5/14/26 at 7:33 pm to
Posted by NashvilleTider
Your Mom
Member since Jan 2007
15862 posts
Posted on 5/14/26 at 7:33 pm to
The billionaires have won. We will all be jobless in 5 years.
Posted by tigeraddict
Baton Rouge
Member since Mar 2007
14943 posts
Posted on 5/14/26 at 7:52 pm to
Total Capacity: 4 million sq ft (approx. 2,250 acres).Power Density: AI-optimized facilities can operate at \(200+\) watts per square foot.Cooling Load Calculation: High-density data centers require roughly 1 ton of precision cooling per 50-100 sq ft.Estimated Tonnage: A 4-million-sq-ft facility could require roughly \(40,000\) to \(80,000+\) tons of cooling.Water Usage: To support this cooling, the facility is permitted to use up to 23 million gallons of water daily, with projected annual usage between 500-600 million gallons.


For comparison, LSU’s campus is around 25,000-30,000 tons of cooling at peak load in July/august. The water usage is likely evaporative cooling from the cooling towers used by the water cooled chillers needed for HVAC.

This post was edited on 5/14/26 at 7:55 pm
Posted by Powerman
Member since Jan 2004
174800 posts
Posted on 5/14/26 at 7:54 pm to
quote:

Kinda like the society that uses a food source for car fuel. What will they think of next?

If you're referring to corn...that type of corn isn't fit for human consumption

Could be used for animal feed though so you're not completely wrong
Posted by LifeTimeTiger2
Member since Apr 2017
531 posts
Posted on 5/14/26 at 7:54 pm to
They have to have someone to sell to dumbass. You people are panican idiots
Posted by Powerman
Member since Jan 2004
174800 posts
Posted on 5/14/26 at 7:55 pm to
quote:

Why else would they need over 5000 of these massive data centers?

They vary greatly in size. Most of the existing ones aren't like the big developments like the Meta project in Lousiana. That's massive even by the new massive standard.
Posted by LifeTimeTiger2
Member since Apr 2017
531 posts
Posted on 5/14/26 at 7:56 pm to
Closed loop cooling dumbass
Posted by LifeTimeTiger2
Member since Apr 2017
531 posts
Posted on 5/14/26 at 7:59 pm to
And?
Posted by LifeTimeTiger2
Member since Apr 2017
531 posts
Posted on 5/14/26 at 8:01 pm to
Guess what ? There is one in st Francisville being built about 1/3 the size of manhattan. Adapt and overcome jacklegs
Posted by tigeraddict
Baton Rouge
Member since Mar 2007
14943 posts
Posted on 5/14/26 at 8:10 pm to
quote:

Closed loop cooling dumbass


Not doing a closed loop at 40,000 tons…..

An Air-cooled chiller is 450t each on a larger unit. A water cooled chiller can go much higher and are way more efficient. Better then 1/2 the kW/T of electricity needed.

To do a 40,000+ ton system you are doing water cooled chillers with cooling towers, with their evaporative cooling for the heat rejection to the outside.

Towers are normally 3.0 gpm a ton (but can be sized for 2.0 or 2.5 gpm ton) and between drift and evaporation about 30% of the water for the condenser water system is lost at full load.

Posted by FLTech
he/won
Member since Sep 2017
28926 posts
Posted on 5/14/26 at 8:12 pm to
I bet all of the residents in cahoots still use their iphones, apps, Netflix, chat gpt, Google, Facebook, all, apple music, Amazon prime, etc every single day though. It's ok for them to use the bandwidth needed for their precious apps but God forbid putting one of those things near the residents in cahoots!
This post was edited on 5/14/26 at 8:15 pm
Posted by themunch
bottom of the list
Member since Jan 2007
72199 posts
Posted on 5/14/26 at 8:20 pm to
All these centers making up the new brains to run shite.

Wonder if we will have to elect them? When they are running the government.
This post was edited on 5/14/26 at 8:23 pm
Posted by Victor R Franko
Member since Dec 2021
3860 posts
Posted on 5/14/26 at 8:28 pm to
The resources used to grow that animal feed or fuel corn could have been used for human consumption or other foods. He's not wrong at all.
Posted by griswold
Member since Oct 2009
4337 posts
Posted on 5/14/26 at 8:34 pm to
Is that water just evaporating? 23 million gallons a day is just disappearing?
Posted by LifeTimeTiger2
Member since Apr 2017
531 posts
Posted on 5/14/26 at 8:48 pm to
Exactly stupid mother frickers yeah numbers being thrown out on water usage are complete bullshite
Posted by LifeTimeTiger2
Member since Apr 2017
531 posts
Posted on 5/14/26 at 8:49 pm to
You’re an idiot
Posted by griswold
Member since Oct 2009
4337 posts
Posted on 5/14/26 at 10:46 pm to
I just heard Matt Walsh say that all data centers combined are using 5% of what golf courses are using.
Posted by Judnnc
Member since Jun 2025
729 posts
Posted on 5/15/26 at 7:26 am to
I wonder who will win the coming AI vs Demons/Fallen Angels/Aliens that are already here and in control.?
Posted by how333
Member since Dec 2020
4509 posts
Posted on 5/15/26 at 7:35 am to
“Well gee Vern, what do dey even make in dem big buildings?”
Posted by Diamondawg
Mississippi
Member since Oct 2006
38866 posts
Posted on 5/15/26 at 8:28 am to
How does META get a $27B return on that buildout from AI?
Posted by sledgehammer
SWLA
Member since Oct 2020
7509 posts
Posted on 5/15/26 at 8:28 am to
MW did a segment on the AI data center in Richland Parish which will be the biggest in the world once completed. Starts at 24:20.
Did residents vote for on this proposed project in their parish or was this something META did behind closed doors and nothing can be done about it?
Jump to page
Page First 5 6 7 8 9 ... 11
Jump to page
first pageprev pagePage 7 of 11Next pagelast page

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on X, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookXInstagram