Started By
Message

re: New MSY airport

Posted on 9/5/18 at 10:54 am to
Posted by Y.A. Tittle
Member since Sep 2003
109743 posts
Posted on 9/5/18 at 10:54 am to
quote:

quote:
All of the infrastructure is stranded on the wrong side of the east-west runways and will have no easy access to the new terminal. Long/short term parking, taxi lots, rideshare lots, all of it. It's amazing to me that this half thought out plan was allowed to go to construction.


It's pretty horrible.


Thing is, if you look at an overhead pic, there was just as much, if not more, space to the west of the existing terminal facility where they could have easily built the EXACT SAME THING THEY ARE BUILDING, but continued to actually well utilize all of the existing infrastructure.
Posted by Napoleon
Kenna
Member since Dec 2007
73253 posts
Posted on 9/5/18 at 10:59 am to
They dropped the ball using loyola, when the existing exits could be tied to Bainbridge. Kenner at least stepped up and built ra new road. They haven't even selected a plan yet for the interchange so I think by 2025 it'll be done.
This post was edited on 9/5/18 at 11:21 am
Posted by Napoleon
Kenna
Member since Dec 2007
73253 posts
Posted on 9/5/18 at 11:00 am to
That's a dumb response.
Posted by CrimsonTideMD
Member since Dec 2010
7113 posts
Posted on 9/5/18 at 11:00 am to
quote:

Sal Minio
Did they really forget to build the new access road to the new terminal? How is that possible?



Don’t fret. They’re gonna put a couple of traffic lights on the runway, so planes and automobiles can share the strip.

Unfortunately though, you will have to pay the tickets that come from those traffic cams.
Posted by Napoleon
Kenna
Member since Dec 2007
73253 posts
Posted on 9/5/18 at 11:06 am to
$200?? I think the cheapest is $400m
Posted by Napoleon
Kenna
Member since Dec 2007
73253 posts
Posted on 9/5/18 at 11:09 am to
I agree. They could have refurbished the existing terminals.
That area of veterans is all low income housing. This whole thing makes no sense at all.
This post was edited on 9/5/18 at 11:24 am
Posted by wickowick
Head of Island
Member since Dec 2006
46284 posts
Posted on 9/5/18 at 11:10 am to
quote:

The state of Louisiana expects to finalize a borrowing plan with federal officials this year to widen Interstate 10 in Baton Rouge and other work, Louisiana’s transportation chief said Wednesday.

"I think it will be finished before the end of the year," said Shawn Wilson, secretary for the state Department of Transportation and Development. "It is not a point of concern."


The airport will be ready next October and the state will have a borrowing plan ready for the end of the year. Anyone think we are going to have the road built in 9 months?
Posted by LNCHBOX
70448
Member since Jun 2009
88718 posts
Posted on 9/5/18 at 11:10 am to
quote:

This whole thing makes no sense at all.



It's just a textbook example of "only in Louisiana." Surely shite like this has to happen in other states, right?
Posted by georgia
445
Member since Jan 2007
9216 posts
Posted on 9/5/18 at 11:10 am to
quote:

hey haven't even selected a plan yet for the interchange so I think by 2025 it'll be done.




There was a thread on here six-ish months ago about he fact that the terminal was almost done but they hadn't even started the road study yet, and someone has to make money off of that for at least 3 years before construction can even start.
Posted by Napoleon
Kenna
Member since Dec 2007
73253 posts
Posted on 9/5/18 at 11:12 am to
Moisant Stock Yards.

Most city's have suburban airports. Dulles is 30 minutes away from DC. Cinncinatti's airport is in another state.
This post was edited on 9/5/18 at 11:25 am
Posted by LNCHBOX
70448
Member since Jun 2009
88718 posts
Posted on 9/5/18 at 11:13 am to
Is da Bitch on here downvoting posts?
Posted by RedPop4
Santiago de Compostela
Member since Jan 2005
15133 posts
Posted on 9/5/18 at 11:14 am to
The City of New Orleans has owned the property for decades.
Posted by wickowick
Head of Island
Member since Dec 2006
46284 posts
Posted on 9/5/18 at 11:16 am to
quote:

There was a thread on here six-ish months ago about he fact that the terminal was almost done but they hadn't even started the road study yet, and someone has to make money off of that for at least 3 years before construction can even start


Well to be fair to the DOTD, who would have thought the airport would have been on schedule? They thought they still had another 4-5 years to get it completed...
Posted by mailman
Houston
Member since Jul 2009
6143 posts
Posted on 9/5/18 at 11:17 am to
quote:

LNCHBOX


10/10 post my boy!!
Posted by Napoleon
Kenna
Member since Dec 2007
73253 posts
Posted on 9/5/18 at 11:19 am to
I went to the local meetings.
One plan would require every gas station on loyola to close and Sams.

All plans require the fire station to go. Another requires that hotel to be torn down.
These things should have been studied years ago.

Posted by keakar
Member since Jan 2017
30152 posts
Posted on 9/5/18 at 11:20 am to
quote:

apparently be a bit of a pain in the arse to get to.


they will have a team of uber 4 wheelers to carry you back and forth through the open fields
Posted by jamboybarry
Member since Feb 2011
33194 posts
Posted on 9/5/18 at 11:21 am to
quote:

All plans require the fire station to go. Another requires that hotel to be torn down. These things should have been studied years ago.


"they" still don't know who owns the fire station property

Posted by Y.A. Tittle
Member since Sep 2003
109743 posts
Posted on 9/5/18 at 11:22 am to
quote:

I went to the local meetings.
One plan would require every gas station on loyola to close and Sams.

All plans require the fire station to go. Another requires that hotel to be torn down.
These things should have been studied years ago.


So, what was the rationale for not trying to locate it on the same side as the existing terminal?

I actually don't necessarily have a problem with the idea of building a NEW terminal and not just continuing to try the 'lipstick on a pig' approach with the old. I just don't understand the choice to build it completely away from every bit of existing infrastructure and with no easy access to what you are building.
Posted by FlyinTiger93
Member since May 2010
3724 posts
Posted on 9/5/18 at 11:22 am to
Build a tunnel to it.
Posted by BHM
Member since Jun 2012
3858 posts
Posted on 9/5/18 at 11:23 am to
First time seeing the new construction last week. Good looking building!
first pageprev pagePage 3 of 7Next pagelast page

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on X, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookXInstagram