- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
Master plan for proposed Gonzales train station between BR and NO in the works
Posted on 8/14/18 at 10:33 am
Posted on 8/14/18 at 10:33 am
quote:
Master plan for proposed Gonzales train station between New Orleans, Baton Rouge chugs along
LINK
Twice-daily trains along the $260 million commuter rail line would connect downtown Baton Rouge with downtown New Orleans. Intermediate stops are planned for suburban Baton Rouge, Gonzales, LaPlace, the Louis Armstrong New Orleans International Airport and Jefferson Parish.
What’s the point of having a stop at the airport....or really anywhere along the route...if the service is only twice daily and includes no express trains? It’s not really a commuter rail without more regular service and at least reasonably high speeds (75+ mph).
And since this isn’t really a commuter rail, why wouldn’t they also include typical Amtrack -slow service on the existing lines farther north up towards Marksville, Alexandria, Shreveport, and onto Dallas to collect more passengers for this route? Wouldn’t that benefit tourism in New Orleans and help justify the speedier trains that may eventually roll through the Baton Rouge-New Orleans area?
This seems like a scheme for the railroad to get federal dollars to fix a line over the spillway that they’ve ignored for a long time. If that’s true, freight rail should have to yield to passenger traffic on this route.
This post was edited on 8/14/18 at 10:36 am
Posted on 8/14/18 at 10:34 am to member12
This is such a joke pie in the sky project. It's not happening.
Posted on 8/14/18 at 10:35 am to member12
Complete waste of fricking money.
Posted on 8/14/18 at 10:35 am to member12
I kinda defended the NBR bus project in the other thread.
However you will find no defense of this project from me, at least for now.
However you will find no defense of this project from me, at least for now.
Posted on 8/14/18 at 10:36 am to member12
Is it going to connect the B.R. and N.O. loops?
Posted on 8/14/18 at 10:38 am to member12
Last time I read about this, my impression was the twice daily schedule was just an introductory thing that would eventually be expanded.
Posted on 8/14/18 at 10:39 am to NOLALGD
It’s like the proponents threw together a half baked plan and expect it to happen.
I guess this is a push to get the infrastructure (lines, switches, and platforms) in place now and then hope for the best in the future?
I guess this is a push to get the infrastructure (lines, switches, and platforms) in place now and then hope for the best in the future?
Posted on 8/14/18 at 10:39 am to member12
I would guess twice a day would be the start in hopes of building riders.
There are too many people hoping this fails for it to ever work. They would rather sit on the spillway in traffic bitching there are 4 more lanes of standstill traffic in each direction.
There are too many people hoping this fails for it to ever work. They would rather sit on the spillway in traffic bitching there are 4 more lanes of standstill traffic in each direction.
Posted on 8/14/18 at 10:42 am to fightin tigers
quote:
There are too many people hoping this fails for it to ever work. They would rather sit on the spillway in traffic bitching there are 4 more lanes of standstill traffic in each direction.
I agree, and I think with more buy-in that it could potentially work one day. But twice daily service, no express trains, and an unnecessary stop in Jefferson Parish kind of makes it easy to dismiss as bullshite.
None of that changes the pressing need to significantly update I-10 and Airline Highway between southern Baton Rouge and Kenner.
Posted on 8/14/18 at 10:47 am to member12
This is great!! It will give the homeless people a climate controlled place to sleep and panhandle.
I would much rather see an I-10 bypass of BR built if we are throwing 260 Million away.
I would much rather see an I-10 bypass of BR built if we are throwing 260 Million away.
Posted on 8/14/18 at 10:50 am to member12
quote:
no express trains, and an unnecessary stop in Jefferson Parish kind of makes it easy to dismiss as bullshite.
I doubt a stop adds more than five minutes to a ride
Posted on 8/14/18 at 10:51 am to member12
The following things are guaranteed to happen:
1.) It will take 15-20 years to build.
2.) It will cost over 1 billion dollars.
3.) State Representative Bubba Joe Redneck's cousin finna get a fat contract.
4.) No one will use it and it will be a rusted ruin within five years of completion.
1.) It will take 15-20 years to build.
2.) It will cost over 1 billion dollars.
3.) State Representative Bubba Joe Redneck's cousin finna get a fat contract.
4.) No one will use it and it will be a rusted ruin within five years of completion.
This post was edited on 8/14/18 at 11:01 am
Posted on 8/14/18 at 10:51 am to member12
quote:
Master plan for proposed Gonzales train station between BR and NO in the works
Again?
Which has had more studies: BR Loop or BR to NO Commuter Train?
Posted on 8/14/18 at 10:51 am to NimbleCat
quote:
This is great!! It will give the homeless people a climate controlled place to sleep and panhandle.
Responses from people who have never riden a commuter train
Posted on 8/14/18 at 10:52 am to member12
Let’s say this happens (it won’t)...
How many billions of dollars will be flushed down the toilet? It’s definitely more than $1B.
How many billions of dollars will be flushed down the toilet? It’s definitely more than $1B.
Posted on 8/14/18 at 10:53 am to NOLALGD
quote:well your credibility is shot.
I kinda defended the NBR bus project in the other thread.
Posted on 8/14/18 at 10:54 am to TheFonz
5.)It will be overrun with culcha and no one will use it for fear of being robbed/beaten/murdered.
Posted on 8/14/18 at 10:56 am to member12
quote:
What’s the point?
FIFY
Posted on 8/14/18 at 10:56 am to member12
What is this fascination with passenger rail? It only works in densely populated centers such as the north east where an hour ride can transport hundreds of thousands of people at a time.
This is just a federal money grab
This is just a federal money grab
Popular
Back to top
Follow TigerDroppings for LSU Football News