Started By
Message

re: Interstate I-10 Widening Project

Posted on 2/19/18 at 7:42 am to
Posted by 50_Tiger
Arlington TX
Member since Jan 2016
43551 posts
Posted on 2/19/18 at 7:42 am to
quote:

They need to hire on consultants from TXDOT. I have never seen roads built so fast than what they have been doing in north Dallas.



More like NTTA.


And this is a joke that it will take 5 years to do that project. In about a year or so NTTA has widened the DNT, Built 114 Texpress, and now widening Bush.

It took them 2 years to dig out 635 Texpress and add multiple layer freeways.

Sounds like a typical Louisiana bullshite project that will never be done right and overbudget.
Posted by Catman88
Baton Rouge, LA
Member since Dec 2004
49125 posts
Posted on 2/19/18 at 7:44 am to
Im just scared they said 5 years... that means it will be 10.
Posted by doubleb
Baton Rouge
Member since Aug 2006
43084 posts
Posted on 2/19/18 at 7:45 am to
The same crew working on Essen is slotted for this project. 10 years.
Posted by 50_Tiger
Arlington TX
Member since Jan 2016
43551 posts
Posted on 2/19/18 at 7:52 am to
quote:

The same crew working on Essen is slotted for this project. 10 years.



Wasn't this early 2000's? I am pretty sure I was still in the state when they were doing this. It took forever.
Posted by Bard
Definitely NOT an admin
Member since Oct 2008
60280 posts
Posted on 2/19/18 at 7:55 am to
quote:

They need to hire on consultants from TXDOT. I have never seen roads built so fast than what they have been doing in north Dallas.


+1

And they know what "plan for the future" means. Look at I35 between Austin and San Antonio. Not only is it 6-laned, but has frontage roads on both sides.
Posted by Bard
Definitely NOT an admin
Member since Oct 2008
60280 posts
Posted on 2/19/18 at 8:07 am to
Adding a lane in each direction from the bridge to the split is going to be big.

The removal of the Perkins ramps though will make Acadian around 10/Perkins even more of a nightmare than it already is.
Posted by shawnlsu
Member since Nov 2011
23682 posts
Posted on 2/19/18 at 8:07 am to
No, they are doing it AGAIN because La DOTD couldn't plan 10 years into the future.
Posted by lsu13lsu
Member since Jan 2008
11842 posts
Posted on 2/19/18 at 8:42 am to
quote:

Unfortunately, this stretch is expected to see 20-30% more cars per day by 2030. If that is true, I'm afraid this project may not go far enough.


There are studies that say traffic is unsolvable at this point unless population is stagnant or declining. If you are behind you cannot catch up due to population growing. It takes too long to build infrastructure.

That is why other solutions need to be considered in addition to infrastructure. Working from home or working at office less days. AI driven cars, trains, bike paths, etc.
This post was edited on 2/19/18 at 8:43 am
Posted by SG_Geaux
Beautiful St George, LA
Member since Aug 2004
80833 posts
Posted on 2/19/18 at 8:48 am to
quote:

Louisiana has proven though that they need out of state consultants on this



The out of state company that got the widening project in front of the mall fricked it up so bad that the state removed them from the project.

Out of state companies are not some fix all solution.
Posted by 50_Tiger
Arlington TX
Member since Jan 2016
43551 posts
Posted on 2/19/18 at 8:49 am to
quote:

The out of state company that got the widening project in front of the mall fricked it up so bad that the state removed them from the project.

Out of state companies are not some fix all solution.


If you baws would stop being cheap asses and okay a toll road Harris County RTA is just as good as NTTA and can knock it out for you.

Posted by LSUBoo
Knoxville, TN
Member since Mar 2006
104482 posts
Posted on 2/19/18 at 8:52 am to
quote:

If you baws would stop being cheap asses and okay a toll road


Not in my backyard, mister.
Posted by TH03
Mogadishu
Member since Dec 2008
172004 posts
Posted on 2/19/18 at 8:58 am to
quote:

It took them 2 years to dig out 635 Texpress and add multiple layer freeways.


And it's a god damn work of art. It's insane what they did there.

They're trying to do the same east of 75 all the way to I30, but it keeps getting delayed. The state doesn't want to approve any new road projects that include toll roads.
This post was edited on 2/19/18 at 9:00 am
Posted by 50_Tiger
Arlington TX
Member since Jan 2016
43551 posts
Posted on 2/19/18 at 9:01 am to
quote:

And it's a god damn work of art. It's insane what they did there.


Feels like you are in some type of VIP freeway for OT ballers. Plebs stay away

TH! Did you go to the Auto Show this weekend? It was in your neck of the woods.

edit: A way to skip Garland? TAKE MY MONEY.
This post was edited on 2/19/18 at 9:03 am
Posted by TH03
Mogadishu
Member since Dec 2008
172004 posts
Posted on 2/19/18 at 9:03 am to
Yeah I always take it when I go to the office. It's nice.

No, was it downtown?
Posted by 50_Tiger
Arlington TX
Member since Jan 2016
43551 posts
Posted on 2/19/18 at 9:04 am to
Yeah KB Convention Center.
Posted by BeepNode
Lafayette
Member since Feb 2014
10005 posts
Posted on 2/19/18 at 9:17 am to
quote:

Spoken like a true NBR resident that already has quick access to 2, if not 3 (Audubon) bridges.


You're missing the point entirely but so are most in Louisiana.

A bypass is needed to divert interstate traffic around Baton Rouge. Especially big trucks. Locals could use the existing infrastructure once you get interstate traffic off of it.

That's why it's called an INTERstate.
Posted by Lickitty Split
Inside
Member since Apr 2017
4199 posts
Posted on 2/19/18 at 9:28 am to
The first thing you’re missing is that there is local traffic (Lafayette to Lake Charles) that wishes to bypass the new bridge because of how dangerous and slow it is. These people are trying to get to New Orleans. Additionally, you have people from South Baton Rouge, Ascension and Iberville who would use the brand new bridge and relieve traffic going west on I-10. I’d speculate that you could reduce the traffic 20% both ways with this new bridge.
Posted by KiwiHead
Auckland, NZ
Member since Jul 2014
38540 posts
Posted on 2/19/18 at 9:44 am to
I'm with you, buthe problem comes about in the legislature from the rural politicians in places like St. Helena and Allen, etc. They have bad roads and if you want something done via infrastructure you HAVE to kiss their arses. They want a new road, a new community center, upgrades on the school buildings etc. and they will gum up the works.


Also, Louisiana has more NIMBY's per square mile than just about any other state, particularly in the places that need the infrastructure spending badly.
Posted by kingbob
Sorrento, LA
Member since Nov 2010
71200 posts
Posted on 2/19/18 at 9:46 am to
Also, the south bypass helps people in Ascension Parish and EBR get to DOW in Plaquemine, which is another major source of traffic at peak times on the I-10 Bridge and on LA-1.
Posted by member12
Bob's Country Bunker
Member since May 2008
33146 posts
Posted on 2/19/18 at 9:48 am to
quote:

And this is a joke that it will take 5 years to do that project. In about a year or so NTTA has widened the DNT, Built 114 Texpress, and now widening Bush.


I believe it will take them at least 5 years and a bit more than $300 million.

It will be totally worth it, but construction happens slowly on Louisiana's roads.
first pageprev pagePage 3 of 5Next pagelast page

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on X, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookXInstagram