Started By
Message
locked post

Interstate I-10 Widening Project

Posted on 2/18/18 at 10:25 pm
Posted by lsuman25
Erwinville
Member since Aug 2013
43312 posts
Posted on 2/18/18 at 10:25 pm
Posted by beerJeep
Louisiana
Member since Nov 2016
39245 posts
Posted on 2/18/18 at 10:25 pm to
Won't fix shite
This post was edited on 2/18/18 at 10:26 pm
Posted by lsufan4lifeMiles
Baton Rouge
Member since Aug 2013
746 posts
Posted on 2/18/18 at 10:28 pm to
What you want to know about it baw
Posted by kingbob
Sorrento, LA
Member since Nov 2010
71200 posts
Posted on 2/18/18 at 10:29 pm to
quote:

Won't fix shite


This should actually be a huge help for Eastbound traffic coming off the new bridge as well as south 110 bound traffic coming from DOTD.

It probably won't do a whole heck of a lot for West bound traffic, though.

Another thing that will help some is the next phase of I-10 widening which will add 1 lane in each direction to the stretch between Highland and 73.
Posted by jbgleason
Bailed out of BTR to God's Country
Member since Mar 2012
20408 posts
Posted on 2/18/18 at 10:31 pm to
I can’t imagine what this is going to do to the already atrocious traffic situation during the construction. Orange barrels for the next five (ten?) years.
Posted by Bison
Truth or Consequences
Member since Dec 2016
1339 posts
Posted on 2/18/18 at 10:34 pm to
Guess we ain’t getting ‘the loop’ any time soon
Posted by kingbob
Sorrento, LA
Member since Nov 2010
71200 posts
Posted on 2/18/18 at 10:35 pm to
quote:


Interstate I-10 Widening Project
Guess we ain’t getting ‘the loop’ any time soon


This ain't an OR, it's an AND. We need both. I'm glad we're finally getting one of the two. Hopefully I'll see the second before I die.
Posted by CajunSuperJeff
US military
Member since Dec 2007
622 posts
Posted on 2/18/18 at 10:43 pm to
quote:

Mississippi River bridge to Dalrymple This section of the corridor is one of the biggest traffic chokepoints in the Baton Rouge area.

Understatement!! It is the biggest choke point between the Pacific Coast and Atlantic Coast.
Posted by member12
Bob's Country Bunker
Member since May 2008
33146 posts
Posted on 2/18/18 at 10:46 pm to
It's going to be a huge help for a while. It's expected to start in 2019 and take until 2025 to finish. And I think they are very conservative with the budget.

It will be very nice when completed and will more efficiently move traffic across the bridge and into downtown.

Unfortunately, this stretch is expected to see 20-30% more cars per day by 2030. If that is true, I'm afraid this project may not go far enough.
Posted by member12
Bob's Country Bunker
Member since May 2008
33146 posts
Posted on 2/18/18 at 10:49 pm to
quote:

This ain't an OR, it's an AND. We need both


Not sure about the loop, but supposedly a decision on the new bridge crossing to replace the Plaquemine ferry will be made by the end of this year.

Either Plaquemine Point or Bayou Goula.

No plan yet on how to pay for it, and we are still likely 10 years away from moving dirt. But it's a big step.

Hopefully by then, we'll see them widen I-10 to 6 lanes between the bridge and LA415 (including the bridge approach) as well as widen Airline Highway in Baton Rouge and Ascension.
This post was edited on 2/18/18 at 10:53 pm
Posted by Jackie Chan
Japan?
Member since Sep 2012
4940 posts
Posted on 2/18/18 at 11:11 pm to
quote:

It's expected to start in 2019 and take until 2025 to finish


The problem with BR, and LA in general is that they build roads for right now, instead of building for the future.

it's been that way for years and will continue to be. BR will always be 10-20 years behind.

PS closing the Dalrymple exit is BS
Posted by Stiles
Member since Sep 2017
3458 posts
Posted on 2/18/18 at 11:20 pm to
It'll never be ready in time.
Posted by Lickitty Split
Inside
Member since Apr 2017
4199 posts
Posted on 2/18/18 at 11:24 pm to
I saw this yesterday. I still don’t understand how someone coming from I-110 is supposed to cross over two lanes to get to the service road exit for Dalrymple. It looks like the service road is going to start right by the bridge exit which means more wrecks and slowdown at that area. I think getting rid of the Perkins exit and on ramp is a huge mistake. This will cause a greater clusterfrick on Acadian in the morning and afternoon. This traffic will also slow down Perkins road from Acadian to Essen.

All of this so John Bel can say he’s fixing problems and making progress.

Posted by alajones
Huntsvegas
Member since Oct 2005
35973 posts
Posted on 2/18/18 at 11:26 pm to
I’ve seen better looking diagrams in the quad.
Posted by tigerpimpbot
Chairman of the Pool Board
Member since Nov 2011
69244 posts
Posted on 2/18/18 at 11:32 pm to
quote:

Interstate I-10


Department of Redundancy Department
Posted by member12
Bob's Country Bunker
Member since May 2008
33146 posts
Posted on 2/18/18 at 11:33 pm to
quote:

closing the Dalrymple exit is BS


They aren't closing the Dalrymple exit.

They are actually expanding it by adding a ramp to go eastbound I-10 from Dalrymple, although it uses a roundabout way to do it.
Posted by beachdude
FL
Member since Nov 2008
6627 posts
Posted on 2/18/18 at 11:38 pm to
quote:

Building for the future.


Once upon a time, someone designed and built I-459 at Birmingham and “6 laned” I-75 from Atlanta to Macon. There was zero (no buildings nothing) on either stretch of road, one about 30 miles and the other about 100. Those were done by people on this board who are called “hillbillies”, “rednecks”, etc. There are now hundreds of thousands of people who live along these corridors, clean industrial sites (international auto manufacturers for one), and efficient traffic flows. All done 35 YEARS before Louisiana attempts to alleviate similar congestion in its capitol city. What an absolute joke.
Posted by dcrews
Houston, TX
Member since Feb 2011
32130 posts
Posted on 2/18/18 at 11:42 pm to
shite will take 20 years to complete
Posted by MrSmith
Member since Sep 2009
8319 posts
Posted on 2/18/18 at 11:47 pm to
Enjoy your anchor
Posted by Parmen
Member since Apr 2016
18317 posts
Posted on 2/18/18 at 11:47 pm to
Need to put time lengths in the contract so if the contractor fails to complete on time, it’s easier to fire and replace them.

Louisiana has proven though that they need out of state consultants on this
first pageprev pagePage 1 of 5Next pagelast page

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on X, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookXInstagram