- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
re: In shocking news, the proposed I-10 widening through Baton Rouge already behind schedule
Posted on 2/19/19 at 8:16 pm to SPEEDY
Posted on 2/19/19 at 8:16 pm to SPEEDY
If everything in Baton Rouge is slow, late, and second rate, at least let's eliminate open container laws. If you're gonna be backwards, be fun.
Posted on 2/19/19 at 8:20 pm to SPEEDY
If it took three years and 11 months from authorizing sidewalks on Gardere to starting construction, do you believe they can start widening 10 in less than five years?
Posted on 2/19/19 at 8:20 pm to WeeWee
quote:
It will never be ready
FIFY. By the time they’re done with the current stage in 2027, it will already need further work and expansion.
As it stands the current plan gets I-10 to where at should have been twenty years ago.
Posted on 2/19/19 at 8:52 pm to kengel2
quote:
But for real, they need to just buy those businesses and move on.
And if the business is owned by a minority then they claim racism. Environmental impact studies also includes impacts to minorities.
Posted on 2/19/19 at 10:55 pm to whoa
quote:
The businesses have fought for years to prevent this from happening.
Fight what? Do they really not want I-10 to expand so traffic can flow better? They like that gridlocked bullshite that puts everyone in a bad mood and gives Baton Rouge a bad image to people passing through? Damn it’s so stupid. BR is a major metro and is a major staple in the region’s economy. They’ve gotta quit acting like BR is some small town like St Francisville. Stuck in the fricking past
Posted on 2/19/19 at 10:59 pm to OKTGR580
That flowing traffic does nothing for them if they lose their business. You seem to want them to sacrifice for the greater good. People generally are reluctant to do that. You may not like it, but they are acting rationally, ie in their own best interest.
Posted on 2/19/19 at 11:05 pm to Jim Rockford
What they want shouldn’t matter in this case. This is an emergency. shite is out of control and government should take matters into their own hands. Build right on top of them do something. Stop bullshitting making excuses. I swear.
Posted on 2/19/19 at 11:11 pm to OKTGR580
The Bush to Lacombe Highway was approved over 30 years ago and it still hasn't broken ground. There is a reason that this is only "proposed" because it is a pipe dream.
Posted on 2/19/19 at 11:15 pm to OKTGR580
There are mechanisms to do
just that, but dont be pissed at them for looking out for themselves. If somebody wanted to bulldoze your house in the name of progress you wouldnt be happy.
just that, but dont be pissed at them for looking out for themselves. If somebody wanted to bulldoze your house in the name of progress you wouldnt be happy.
Posted on 2/19/19 at 11:57 pm to Jim Rockford
Unless I'm mistaken he doesn't even live in BR or La. If so he doesn't really have a say or vested interest either way.
Posted on 2/20/19 at 4:36 am to SPEEDY
C'mon 2021. Please get here soon so I can get out of this shite hole of a state for good.
Posted on 2/20/19 at 4:50 am to SPEEDY
Baton Rouge......not quite the SHITHOLE that is New Orleans ......but we working on it!
KEEP VOTING DIMOCRAPS!
KEEP VOTING DIMOCRAPS!
Posted on 2/20/19 at 4:52 am to ibldprplgld
quote:
Unless I'm mistaken he doesn't even live in BR or La. If so he doesn't really have a say or vested interest either way.
All he does is bitch about every aspect of BR and the state. It’s his shtick.
His post above though is a new benchmark in his lunacy.
Posted on 2/20/19 at 5:11 am to SPEEDY
quote:
Engineers working on the environmental assessment phase of a proposed widening of 3.5 miles of Interstate 10 through the heart of Baton Rouge
Why? Why in the world do we need to do an environmental impact study for expanding an already existing elevated road way that is elevated over DEVELOPED land?!?!?!?!?!?
Posted on 2/20/19 at 6:09 am to Drop4Loss
Ummmm. You don’t understand the NEPA process apparently.
Posted on 2/20/19 at 6:11 am to Oilfieldbiology
What do think is going to happen when they begin construction which includes substantial structural elements and the equipment used to erect them? Also, new improvements will be up to current design standards and likely further impact the area.
The area below will be 100% affected.
The area below will be 100% affected.
Posted on 2/20/19 at 6:12 am to SPEEDY
quote:Representative of this...
a thriving merchants district.

Posted on 2/20/19 at 6:15 am to gumbeaux
They are in the thick of exactly what has kept this project from beginning for decades.
DOTD and FHWA knew all of this was going to hit and are doing what they can through the NEPA process.
Outspoken lay persons armed with Drivers lic sometimes fail to realize what goes into major transportation initiatives.
DOTD and FHWA knew all of this was going to hit and are doing what they can through the NEPA process.
Outspoken lay persons armed with Drivers lic sometimes fail to realize what goes into major transportation initiatives.
Posted on 2/20/19 at 6:16 am to OKTGR580
An emergency?
Stfu. You don't even live in LA
Stfu. You don't even live in LA
Posted on 2/20/19 at 6:30 am to Deactived
Speaking of behind schedule, whats the latest on the Sunshine Bridge?
Popular
Back to top



0





