- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
re: Why does Juban Crossing look so different from its initial plan?
Posted on 3/26/15 at 2:30 pm to Martini
Posted on 3/26/15 at 2:30 pm to Martini
The problem is not that the parishes don't have the money. It's the rednecks that keep getting elected and what they choose to spend the money on. A new bond would mean more money to get wasted.
They already do this anyway. It's why property values keep getting reassessed.
They already do this anyway. It's why property values keep getting reassessed.
Posted on 3/26/15 at 2:32 pm to Martini
quote:
Martini
quote:
Well that's a start but I was actually talking about the whole parish in general. If LP and AP would dedicate a road tax, bond the money they both truly could benefit tremendously and relatively quickly which benefits the whole metropolitan area EBRP included.
LP already has a dedicated road tax. I'm guessing you have no clue how much actual repair and resurfacing work has actually gone on in the Parish over the last 20 years, do you?
I'm also guessing you either don't live here or haven't lived here for very long.
Posted on 3/26/15 at 3:04 pm to Paul Allen
Design often never turns out how preliminary pie in the sky designs are done. This thing called a budget gets in the way when real dollars are allocated along with mess ups, additional fees, ideas that come along during construction and investor pull out and financial crisis.
Posted on 3/26/15 at 3:08 pm to Paul Allen
Lets see:
Getting a Stroube's and already has a better grocery store than anyplace in BR.
I will take it.
Getting a Stroube's and already has a better grocery store than anyplace in BR.
I will take it.
Posted on 3/26/15 at 3:22 pm to statman34
quote:
I would say let them finish all phases
IF this actually happens.
Posted on 3/26/15 at 3:28 pm to Paul Allen
That's nothing. Look at the house I'm having built. LOOKS NOTHING LIKE THE PLANS!!!!!!
Posted on 3/26/15 at 3:30 pm to Phil A Sheo
quote:
Is that the Garage???
Probably, but I'm a fricking liar so I can't say for sure.
Posted on 3/26/15 at 3:32 pm to junkfunky
quote:
Probably, but I'm a fricking liar so I can't say for sure
Posted on 3/26/15 at 3:37 pm to Phil A Sheo
Look's like a metal building slab.
Posted on 3/26/15 at 3:48 pm to junkfunky
quote:Bucking the system and going with no plumbing eh?
Look at the house I'm having built.
Posted on 3/26/15 at 3:49 pm to htownjeep
quote:
Bucking the system and going with no plumbing eh?
Nah, I'm going old school and shitting in the woods.
Posted on 3/26/15 at 3:50 pm to htownjeep
looks like he lives in the woods...so just go outside.. Be one with nature
Posted on 3/26/15 at 3:51 pm to htownjeep
junkfunky's doesn't urinate or defecate.
His meditation rituals take care of that
His meditation rituals take care of that
Posted on 3/26/15 at 3:54 pm to Catman88
quote:
junkfunky's doesn't urinate or defecate.
His meditation rituals take care of that
The rituals just happen to take place in a bathroom sometimes.
Posted on 3/26/15 at 3:54 pm to Phil A Sheo
quote:
I'm just glad i'll have more options.. With I sware 20 Mexican joints and big mikes... something needs to change
Burgersmith is coming to Juban too.
I think it'll all be nice once everything is finished but like previous posters said this is just Phase 1 right now.
Posted on 3/26/15 at 3:55 pm to lsugrldej8
All three phases will take what...2 more years? 3?
Posted on 3/26/15 at 4:03 pm to Paul Allen
quote:
but it looks nothing like the blueprint.
That "blueprint" on their site is not a blueprint. It's probably their original planning submittal to whatever jurisdiction for approval. They probably just haven't updated their site with new information.
These things go through a lot of changes. First a developer hires a design firm to conceptually plan it all out. You have input from tenants, the developer, the designer, the local government, and a handful of other people.
You then submit that plan to a local jurisdiction for concpetual approval. This is usually is for zoning purposes. Most of these types of developments get zones PUDs, SPUDS, TNDs, whatever. The definition of all these are loose and chnage from county to parish to state.
Once zoning is approved by local officials, you go back to the drawing board to get the plan tightened up. By this time a tenant or two has pulled out or another couple have been added. If the tenant is someone like Target or Lowes, this can drastically alter the plans.
Rinse and repeat a half dozen times, add in a recession or two, a 9/11 or SARS outbreak, and a changing local demographic, and your original plan is altered dramatically.
Posted on 3/26/15 at 4:58 pm to BottomlandBrew
It'll be a nightmare until it's finished.....but the Tate, Eden Church and Lockhart plans are SO needed now.
Popular
Back to top


0







