Posted on 6/10/20 at 10:11 am to
Posted by rocket31
Member since Jan 2008
41888 posts
Posted on 6/10/20 at 10:11 am to
quote:

They could also just be filled with other gunk and someone needs to actually clean the exit pipe not inside the storm drain.


naa, those pumps can suck down most anything. ive seen them suck down traffic cones. the system is just not turned on (or broken)
This post was edited on 6/10/20 at 10:13 am
Posted by Lester Earl
3rd Ward
Member since Nov 2003
291698 posts
Posted on 6/10/20 at 10:17 am to
quote:

ravity man, gravity.


I’m no engineer. But If you are in a hole, water won’t drain up.



drains are literally across the street from one another but maybe lol
Posted by BottomlandBrew
Member since Aug 2010
30222 posts
Posted on 6/10/20 at 10:21 am to
quote:

because why else would it be working and then all of a sudden just quit?


Could be you're closer to a pump, so it appeared it was draining at first, but as upstream water flowed down towards you, it filled up the system. The pumps could still be going, but they can only handle so much.
Posted by rocket31
Member since Jan 2008
41888 posts
Posted on 6/10/20 at 10:22 am to
pumps are on again for me, draining now
Posted by Suntiger
STG or BR or somewhere else
Member since Feb 2007
36333 posts
Posted on 6/10/20 at 10:22 am to
quote:

New Orleans is flooding


Crawfish prices going up.
Posted by rocket31
Member since Jan 2008
41888 posts
Posted on 6/10/20 at 10:23 am to
quote:

Could be you're closer to a pump, so it appeared it was draining at first, but as upstream water flowed down towards you, it filled up the system. The pumps could still be going, but they can only handle so much.


yea, possibly, im not going to say i know exactly what is happening

i do know that it was working during the heavy rain, then it stopped during the light rain and we started to flood, and now its working again.
Posted by OvertheDwayneBowe
Member since Sep 2016
3531 posts
Posted on 6/10/20 at 10:30 am to
quote:

naa, those pumps can suck down most anything. ive seen them suck down traffic cones. the system is just not turned on (or broken)



The drains don't suck anything.

Everything is gravity to the canals. If the canals are rising, then there's more water falling than what's being pumped (either they aren't on or aren't enough of them).

If the canals are steady or falling and the streets are rising, then the pipes in the streets are clogged or not big enough.
Posted by tgrbaitn08
Member since Dec 2007
148031 posts
Posted on 6/10/20 at 10:32 am to
This might explain why Gentily and Lakeview is flooded the worse this morning

quote:

According to the Veolia testing, DPS 1 is in relatively good shape capacity-wise. So is the station downstream of DPS 1, which is DPS 6. Its percent capacity is about 87%. Many other stations are not as fortunate. Perhaps the poster child would be station 4 in Gentilly (at Prentiss and Warrington). Its capacity is a measly 58%, with two of its three large pumps moving less than half their design capacity (the third could not have a successful test performed by Veolia, but it is likely in just as bad a shape). Station 12 in Lakeview, with its single 25 cycle pump, is also woefully under capacity, at 42%.
Posted by rocket31
Member since Jan 2008
41888 posts
Posted on 6/10/20 at 10:35 am to
quote:

The drains don't suck anything.


meh, suck or gravity, same difference. the power behind the system when its ON or working is obvious.

like i said, the catch basins will *suck* down traffic cones with ease, so the excuse that debris or tree limbs are blocking the system, is just that, "an excuse"

This post was edited on 6/10/20 at 10:38 am
Posted by Fat Harry
70115
Member since Mar 2005
2404 posts
Posted on 6/10/20 at 10:36 am to
There are pics on NOLA.COM showing how high the Palmetto Canal was. That means the pumps are not working as designed.
Posted by BottomlandBrew
Member since Aug 2010
30222 posts
Posted on 6/10/20 at 10:44 am to
quote:

That means the pumps are not working as designed.


On the best days, the pumps can only handle 1" of rain in the first hour and 1/2" every hour after that. Today's 3-4 inches an hour is way above maximum. Not saying the pumps weren't working, but they also aren't designed to handle that much water, so backups were inevitable.
Posted by tgrbaitn08
Member since Dec 2007
148031 posts
Posted on 6/10/20 at 10:44 am to
quote:

That means the pumps are not working as designed.




people keep saying..."the pumps just cant keep up"

that's true they cant...but they should be. The pumps are underperforming and this will explain it to you.

It's a long Facebook Post but it's worth the read if you want to understand the state of the pumping and drainage system in New Orleans

LINK

quote:

This is a huge finding, and has implications throughout the system. If testing at four different pump stations shows they move far less water the more pumps are brought online,



quote:

Veolia found through integrated testing that two of the three large (1000 cfs) pumps there (specifically pumps C and D) only moved 43% and 48% of their nameplate ratings.
Posted by LSUFanHouston
NOLA
Member since Jul 2009
41708 posts
Posted on 6/10/20 at 10:45 am to
quote:


The drains don't suck anything.

Everything is gravity to the canals


Right.

There are multiple issues.

1) The drains/pipe capacity gets exceeded. The water is being bottlenecked by the capacity of the drains and pipes (which may not be completely open due to damage, being filled up with trash, etc).

2) The "lag" time of the pumps. The pumps do not stay on 24/7. Further, they are mostly not automatic. Someone has to turn them on and keep them running. When a big storm is predicted to come, they can have people there at the stations ready to go. When unpredicted storms pop up like this morning, they are unprepared and have to get people to the pumps and get them turned on. (they aren't all manned 24/7). That takes time.

3) A lot of people don't realize this, but "street capacity" is part of the system. The system is designed and run knowing that some water will temporairly be held in the street, similar to a detention pond.
Posted by tgrbaitn08
Member since Dec 2007
148031 posts
Posted on 6/10/20 at 10:47 am to
quote:


On the best days, the pumps can only handle 1" of rain in the first hour and 1/2" every hour after that.


It is far less than 1/2" per hour in some sections of town
Posted by mylsuhat
Mandeville, LA
Member since Mar 2008
50086 posts
Posted on 6/10/20 at 10:48 am to
People need to be in jail over these pumps
Posted by BottomlandBrew
Member since Aug 2010
30222 posts
Posted on 6/10/20 at 10:49 am to
quote:

3) A lot of people don't realize this, but "street capacity" is part of the system. The system is designed and run knowing that some water will temporairly be held in the street, similar to a detention pond.


Correct. Nola uses 6" as their storage capacity for the streets.
Posted by tgrbaitn08
Member since Dec 2007
148031 posts
Posted on 6/10/20 at 10:52 am to
quote:

People need to be in jail over these pumps



yep..Im tired of hearing "1" per the first hour 1/2' every hour after that" bullshite...thats horseshite and someone needs to be held accountable
Posted by LSUFanHouston
NOLA
Member since Jul 2009
41708 posts
Posted on 6/10/20 at 10:57 am to
quote:

Correct. Nola uses 6" as their storage capacity for the streets.


Thanks, I could not remember the exact vertical amount.
Posted by Nado Jenkins83
Land of the Free
Member since Nov 2012
66867 posts
Posted on 6/10/20 at 11:01 am to
What's broke more often?

Upvote for NOLA Pumps
Downvote for mcdonalds shake machine
Posted by Misnomer
Member since Apr 2020
3756 posts
Posted on 6/10/20 at 11:04 am to
first pageprev pagePage 6 of 9Next pagelast page

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on X, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookXInstagram