New Mobile bridge to be completed by 2031

Posted on 7/10/26 at 4:06 am
Posted by Ramblin Wreck
Member since Aug 2011
4457 posts
Posted on 7/10/26 at 4:06 am
The bridge will be six lanes and you can save the $7.70 toll if you opt to using the existing tunnel. That is a shorter duration than I expected.
Bridge Article
Posted by Horsemeat
2025 Contributor Of The Year
Member since Dec 2014
15606 posts
Posted on 7/10/26 at 4:08 am to
Baton Rouge responds by initializing another environmental study for the impacts of the ongoing environmental study initiated in 2008 for the possibility of a new bridge by 2085.
Posted by RIPMachoMan
Member since Jun 2011
9227 posts
Posted on 7/10/26 at 4:09 am to
Would be great to see any improvement project honestly. Hope it happens
Posted by Bama and Beer
Baldwin Co, AL
Member since Oct 2010
85676 posts
Posted on 7/10/26 at 4:20 am to
Hopeful but extremely doubtful. They've only been talking about this for 30 years now. I cross it 10 times a week so I'd love to see it happen.
Posted by PJinAtl
Atlanta
Member since Nov 2007
14639 posts
Posted on 7/10/26 at 5:19 am to
quote:

completed by 2031

Until they accidentally drive a bridge support into the existing tunnel and have to stop while they repair it and investigate the accident.
Posted by Traffic Circle
Down the Rabbit Hole
Member since Nov 2013
5066 posts
Posted on 7/10/26 at 5:46 am to
The toll will be about $20 when it opens.
Posted by CocomoLSU
Inside your dome.
Member since Feb 2004
157008 posts
Posted on 7/10/26 at 6:08 am to
quote:

completed by 2031

Gonna go out on a limb and say there's no chance that happens.
Posted by CootKilla
In a beer can/All dog's nightmares
Member since Jul 2007
6215 posts
Posted on 7/10/26 at 6:10 am to
They still haven't driven test piles.
Posted by jdani11
Member since Nov 2006
573 posts
Posted on 7/10/26 at 6:21 am to
Test piles were installed and multiple test ran across many testpiles in 2018.

In addition, about 30 more have been installed and load tested with current testing still ongoing/visible everyday for the past 9 months.
Posted by cypresstiger
The South
Member since Aug 2008
14277 posts
Posted on 7/10/26 at 6:22 am to
Baton Rouge responds by initializing another environmental study for the impacts of the ongoing environmental study initiated in 2008 for the possibility of a new bridge by 2085.
—few posts on TD have ever been more accurate
Posted by RemyLeBeau
Member since Mar 2015
1945 posts
Posted on 7/10/26 at 6:48 am to
Does my $8 get me all the way past Buc-ees?

Or does the bridge drop me back onto I-10 at the battleship for stop and go traffic for the next 30 minutes?
Posted by 756
Member since Sep 2004
15958 posts
Posted on 7/10/26 at 7:01 am to
quote:

een talking about this for 30 years now.

And the loop..that began in 1960 with multiple studies
.
Posted by RohanGonzales
Pronoun: Whatever
Member since Apr 2024
11584 posts
Posted on 7/10/26 at 7:04 am to
I support the idea but I don't like how they plan to paint everything white.
Posted by Giantkiller
the internet.
Member since Sep 2007
25664 posts
Posted on 7/10/26 at 7:15 am to
quote:

Baton Rouge responds by initializing another environmental study for the impacts of the ongoing environmental study initiated in 2008 for the possibility of a new bridge by 2085.


Hey these brother in law studies aren't going to fund themselves.
Posted by Costanza
Member since May 2011
3274 posts
Posted on 7/10/26 at 7:18 am to
LINK

Here’s a detailed video of the project.

It’s long overdue, but $7.70 to use the interstate is outrageous.
This post was edited on 7/10/26 at 7:19 am
Posted by udtiger
Over your left shoulder
Member since Nov 2006
116309 posts
Posted on 7/10/26 at 7:20 am to
In Louisiana, you could go ahead and add 5 years to that.
Posted by Ramblin Wreck
Member since Aug 2011
4457 posts
Posted on 7/10/26 at 7:20 am to
quote:

I support the idea but I don't like how they plan to paint everything white.
For the toll gate they will use a gray barn door that rolls to the side.
Posted by mauser
Orange Beach
Member since Nov 2008
27307 posts
Posted on 7/10/26 at 7:26 am to
There will be 3 new lanes only going East with no entrance or exit until you hit the Florida Stateline. DeSantis is paying for it. The signs will say Mobile - Gateway to Florida.
Posted by RemyLeBeau
Member since Mar 2015
1945 posts
Posted on 7/10/26 at 7:26 am to
quote:

For the toll gate they will use a gray barn door that rolls to the side


Other options considered.....

Posted by Archives
Member since Mar 2026
582 posts
Posted on 7/10/26 at 7:28 am to
quote:

to be completed by 2031

=
Actually opening on 2036
first pageprev pagePage 1 of 3Next pagelast page

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on X, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookXInstagram