Page 1
Page 1
Started By
Message

New Interstate I-10 Bridge Groundbreaking

Posted on 9/30/26 at 11:38 am
Posted by Chinese Bandit Boy
Member since Jun 2021
1054 posts
Posted on 9/30/26 at 11:38 am
After reading the other I-10 Bridge Groundbreaking Thread I started this thread about the mess in Baton Rouge. The Baton Rouge Chamber of Commerce as all Chambers of Commerce will oppose any arrangement bypassing Baton Rouge. Fu*k@um. There is no excuse for the mess that I-10 has become at BR.

If Kennedy and Letlow accomplish only one thing in their political careers it should be an end to the I-10 mess in BR.

At the Texas line install a parallel raised two span roadway next to the current I-10 right-of way, similar to current Atchafalaya swamp roadway to run by Lafayette and to Lobdell. There is no road base needed and I understand this is the cheapest and quickest road to put in. At Lobdell I-12 bound traffic and local BR traffic cross current bridge and I-10 Branches off to new I_10 Mississippi River Bridge south of Baton Rouge to cross river and tie into I-10 below BR.

Special spur from LSU to new bridge along or over River Road for traffic heading south on I-10 after games or heading West or North 1-10/I-49.

All raised spans for less cost and faster construction.

Posted by Traffic Circle
Down the Rabbit Hole
Member since Nov 2013
5288 posts
Posted on 9/30/26 at 12:12 pm to
quote:

If Kennedy and Letlow accomplish only one thing in their political careers


Posted by Bard
Definitely NOT an admin
Member since Oct 2008
61149 posts
Posted on 9/30/26 at 12:29 pm to
The Basin Bridge couldn't be built today due to vast amount of environmental studies you need now, versus back then. Hell, we can't even get new lanes added, much less building a whole new one (see also: Bonnet Carre).

The best option for Baton Rouge would have been a bridge between Addis/Brusly (crossing just below Farr Park), making a loop from the curve before Lobdell to the Livingston exit (where the hospital is). It would pull all the LSU/NO/Geismar/LaPlace/etc traffic from coming into BR while adding only an extra mile or 3 to traffic passing through the region.

It would also have made the Brusly/Plaq corridor no longer completely dependent on the Intracoastal.

This post was edited on 9/30/26 at 1:43 pm
Posted by armytiger96
Member since Sep 2007
3500 posts
Posted on 9/30/26 at 12:42 pm to
quote:

All raised spans for less cost and faster construction.



You may want to Google this before suggesting a 200 mile raised segment of the interstate.
Posted by Pepe Lepew
Looney tuned .....
Member since Oct 2008
39390 posts
Posted on 9/30/26 at 1:31 pm to
quote:

The best option for Baton Rouge would have been a bridge between Addis/Brusly
that’s where the “new” bridge was supposed to be constructed in the late 60’s, the politicians moved it downtown, because they knew better…
Posted by slidingstop
Member since Jan 2025
2970 posts
Posted on 9/30/26 at 1:39 pm to
quote:

All raised spans for less cost and faster construction.


Oh yes, I'm sure this will drastically shorten construction time.





WILL NEVER HAPPEN IN YOUR LIFETIME OR YOU CHILD'S, GRANDCHILD'S LIFETIME.
Posted by WhiskeyThief
Madisonville
Member since Oct 2018
849 posts
Posted on 10/1/26 at 3:33 am to
quote:

WILL NEVER HAPPEN IN YOUR LIFETIME OR YOU CHILD'S, GRANDCHILD'S LIFETIME.


All that can be done is “move”
Posted by Shorts Guy
BR
Member since Dec 2023
1271 posts
Posted on 10/1/26 at 5:39 am to
quote:

At the Texas line install a parallel raised two span roadway next to the current I-10 right-of way, similar to current Atchafalaya swamp roadway to run by Lafayette and to Lobdell. There is no road base needed and I understand this is the cheapest and quickest road to put in.


This part is going to help traffic in Baton Rouge how?
Posted by Jim Rockford
Member since May 2011
107432 posts
Posted on 10/1/26 at 6:26 am to
quote:

This part is going to help traffic in Baton Rouge how?


When 18 wheelers wreck they'll keep eastbound traffic from making it to Baton Rouge for hours at a time.

This post was edited on 10/1/26 at 6:27 am
Posted by Shorts Guy
BR
Member since Dec 2023
1271 posts
Posted on 10/1/26 at 11:56 am to
quote:

When 18 wheelers wreck they'll keep eastbound traffic from making it to Baton Rouge for hours at a time.


Similar occurrences happen everywhere where the interstate isn’t 10 lanes wide. It would cost a shite ton and Louisiana would not be special enough to get any federal funding towards this. Widening the entire mainline I-10 to 3 lanes into BR would be much more practical. Starting with the segments from Lobdell to the base of the bridge and I-49 to at least Scott. I appreciate the out of the box thinking, though.
Posted by Btrtigerfan
Disgruntled employee
Member since Dec 2007
24449 posts
Posted on 10/2/26 at 9:26 am to
quote:

The Basin Bridge couldn't be built today





When men were men.
Posted by TigerAllNightLong
Member since Jul 2023
1280 posts
Posted on 10/2/26 at 4:53 pm to
Broke people don’t get nice things. It’s really a lesson that should have been learned by the age of five.

If Louisiana wants a new bridge, don’t be a broke arse State.
Posted by Shimoda
Member since Jul 2026
332 posts
Posted on 10/2/26 at 5:16 pm to
St. George is licking its chops
Posted by soccerfüt
Location: A Series of Tubes
Member since May 2013
77440 posts
Posted on 10/2/26 at 6:15 pm to
quote:

New Interstate I-10 Bridge Groundbreaking
The US Hwy 90 bridges over the Pearl River delta project have a public hearing scheduled for 10/20/26 in Pearlington.

That’s every bit of $600 million or more now. (It is five bridges in total)
Posted by Tarps99
Lafourche Parish
Member since Apr 2017
14054 posts
Posted on 10/2/26 at 7:19 pm to
quote:

That’s every bit of $600 million or more now. (It is five bridges in total)


I don’t think it is that much.

It might be 5 bridges, but only two are movable.

Most are fixed span concrete bridges that cost maybe 5-10 million.

The big movable ones will cost a lot more.

For example the new Lafite swing bridge cost about 60 million.



It just depends on how wide or if they do a lift structure. The lift bridge they just completed in Galliano cost about 35 million. I noticed with that one, LA DOTD went back to a steel deck instead of a concrete deck that was used on other recent bridge projects.

DOTD is also looking to build a new Boudreaux Canal Bridge next year and it is expected to cost 56 million instead of the 30 million it was estimated at.
Posted by soccerfüt
Location: A Series of Tubes
Member since May 2013
77440 posts
Posted on 10/2/26 at 8:27 pm to
Actually only one potential lift bridge (East Pearl River). That could be an actually be a fixed bridge (like the I-10 East Pearl River Bridge).

We’ll see.
Posted by BoostAddict
Member since Jun 2007
3298 posts
Posted on 10/2/26 at 9:05 pm to
quote:

All raised spans for less cost and faster construction.


LOL... Who the fvck told you this?
Posted by SG_Geaux
Beautiful St George, LA
Member since Aug 2004
81338 posts
Posted on 10/2/26 at 9:10 pm to
Bridge could have been done a decade ago.

But we got the bridge to nowhere near St Francisville instead.
Posted by Allister Fiend
Member since Jan 2016
1190 posts
Posted on 10/2/26 at 9:16 pm to
It’s crazy to think it took just a couple years to build the atchafalaya bridge but it takes decades just to redo the interstate at the TX/LA border and in Beaumont.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on X, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

Facebook•X•Instagram