
- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Coaching Changes
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
New Interstate I-10 Bridge Groundbreaking
Posted on 9/30/26 at 11:38 am
Posted on 9/30/26 at 11:38 am
After reading the other I-10 Bridge Groundbreaking Thread I started this thread about the mess in Baton Rouge. The Baton Rouge Chamber of Commerce as all Chambers of Commerce will oppose any arrangement bypassing Baton Rouge. Fu*k@um. There is no excuse for the mess that I-10 has become at BR.
If Kennedy and Letlow accomplish only one thing in their political careers it should be an end to the I-10 mess in BR.
At the Texas line install a parallel raised two span roadway next to the current I-10 right-of way, similar to current Atchafalaya swamp roadway to run by Lafayette and to Lobdell. There is no road base needed and I understand this is the cheapest and quickest road to put in. At Lobdell I-12 bound traffic and local BR traffic cross current bridge and I-10 Branches off to new I_10 Mississippi River Bridge south of Baton Rouge to cross river and tie into I-10 below BR.
Special spur from LSU to new bridge along or over River Road for traffic heading south on I-10 after games or heading West or North 1-10/I-49.
All raised spans for less cost and faster construction.
If Kennedy and Letlow accomplish only one thing in their political careers it should be an end to the I-10 mess in BR.
At the Texas line install a parallel raised two span roadway next to the current I-10 right-of way, similar to current Atchafalaya swamp roadway to run by Lafayette and to Lobdell. There is no road base needed and I understand this is the cheapest and quickest road to put in. At Lobdell I-12 bound traffic and local BR traffic cross current bridge and I-10 Branches off to new I_10 Mississippi River Bridge south of Baton Rouge to cross river and tie into I-10 below BR.
Special spur from LSU to new bridge along or over River Road for traffic heading south on I-10 after games or heading West or North 1-10/I-49.
All raised spans for less cost and faster construction.
Posted on 9/30/26 at 12:12 pm to Chinese Bandit Boy
quote:
If Kennedy and Letlow accomplish only one thing in their political careers
Posted on 9/30/26 at 12:29 pm to Chinese Bandit Boy
The Basin Bridge couldn't be built today due to vast amount of environmental studies you need now, versus back then. Hell, we can't even get new lanes added, much less building a whole new one (see also: Bonnet Carre).
The best option for Baton Rouge would have been a bridge between Addis/Brusly (crossing just below Farr Park), making a loop from the curve before Lobdell to the Livingston exit (where the hospital is). It would pull all the LSU/NO/Geismar/LaPlace/etc traffic from coming into BR while adding only an extra mile or 3 to traffic passing through the region.
It would also have made the Brusly/Plaq corridor no longer completely dependent on the Intracoastal.

The best option for Baton Rouge would have been a bridge between Addis/Brusly (crossing just below Farr Park), making a loop from the curve before Lobdell to the Livingston exit (where the hospital is). It would pull all the LSU/NO/Geismar/LaPlace/etc traffic from coming into BR while adding only an extra mile or 3 to traffic passing through the region.
It would also have made the Brusly/Plaq corridor no longer completely dependent on the Intracoastal.
This post was edited on 9/30/26 at 1:43 pm
Posted on 9/30/26 at 12:42 pm to Chinese Bandit Boy
quote:
All raised spans for less cost and faster construction.
You may want to Google this before suggesting a 200 mile raised segment of the interstate.
Posted on 9/30/26 at 1:31 pm to Bard
quote:that’s where the “new” bridge was supposed to be constructed in the late 60’s, the politicians moved it downtown, because they knew better…
The best option for Baton Rouge would have been a bridge between Addis/Brusly
Posted on 9/30/26 at 1:39 pm to Chinese Bandit Boy
quote:
All raised spans for less cost and faster construction.
Oh yes, I'm sure this will drastically shorten construction time.
WILL NEVER HAPPEN IN YOUR LIFETIME OR YOU CHILD'S, GRANDCHILD'S LIFETIME.
Posted on 10/1/26 at 3:33 am to slidingstop
quote:
WILL NEVER HAPPEN IN YOUR LIFETIME OR YOU CHILD'S, GRANDCHILD'S LIFETIME.
All that can be done is “move”
Posted on 10/1/26 at 5:39 am to Chinese Bandit Boy
quote:
At the Texas line install a parallel raised two span roadway next to the current I-10 right-of way, similar to current Atchafalaya swamp roadway to run by Lafayette and to Lobdell. There is no road base needed and I understand this is the cheapest and quickest road to put in.
This part is going to help traffic in Baton Rouge how?
Posted on 10/1/26 at 6:26 am to Shorts Guy
quote:
This part is going to help traffic in Baton Rouge how?
When 18 wheelers wreck they'll keep eastbound traffic from making it to Baton Rouge for hours at a time.

This post was edited on 10/1/26 at 6:27 am
Posted on 10/1/26 at 11:56 am to Jim Rockford
quote:
When 18 wheelers wreck they'll keep eastbound traffic from making it to Baton Rouge for hours at a time.
Similar occurrences happen everywhere where the interstate isn’t 10 lanes wide. It would cost a shite ton and Louisiana would not be special enough to get any federal funding towards this. Widening the entire mainline I-10 to 3 lanes into BR would be much more practical. Starting with the segments from Lobdell to the base of the bridge and I-49 to at least Scott. I appreciate the out of the box thinking, though.
Posted on 10/2/26 at 9:26 am to Bard
quote:
The Basin Bridge couldn't be built today
When men were men.
Posted on 10/2/26 at 4:53 pm to Chinese Bandit Boy
Broke people don’t get nice things. It’s really a lesson that should have been learned by the age of five.
If Louisiana wants a new bridge, don’t be a broke arse State.
If Louisiana wants a new bridge, don’t be a broke arse State.
Posted on 10/2/26 at 5:16 pm to Chinese Bandit Boy
St. George is licking its chops
Posted on 10/2/26 at 6:15 pm to Chinese Bandit Boy
quote:The US Hwy 90 bridges over the Pearl River delta project have a public hearing scheduled for 10/20/26 in Pearlington.
New Interstate I-10 Bridge Groundbreaking
That’s every bit of $600 million or more now. (It is five bridges in total)
Posted on 10/2/26 at 7:19 pm to soccerfüt
quote:
That’s every bit of $600 million or more now. (It is five bridges in total)
I don’t think it is that much.
It might be 5 bridges, but only two are movable.
Most are fixed span concrete bridges that cost maybe 5-10 million.
The big movable ones will cost a lot more.
For example the new Lafite swing bridge cost about 60 million.
It just depends on how wide or if they do a lift structure. The lift bridge they just completed in Galliano cost about 35 million. I noticed with that one, LA DOTD went back to a steel deck instead of a concrete deck that was used on other recent bridge projects.
DOTD is also looking to build a new Boudreaux Canal Bridge next year and it is expected to cost 56 million instead of the 30 million it was estimated at.
Posted on 10/2/26 at 8:27 pm to Tarps99
Actually only one potential lift bridge (East Pearl River). That could be an actually be a fixed bridge (like the I-10 East Pearl River Bridge).
We’ll see.
We’ll see.
Posted on 10/2/26 at 9:05 pm to Chinese Bandit Boy
quote:
All raised spans for less cost and faster construction.
LOL... Who the fvck told you this?
Posted on 10/2/26 at 9:10 pm to Chinese Bandit Boy
Bridge could have been done a decade ago.
But we got the bridge to nowhere near St Francisville instead.
But we got the bridge to nowhere near St Francisville instead.
Posted on 10/2/26 at 9:16 pm to Chinese Bandit Boy
It’s crazy to think it took just a couple years to build the atchafalaya bridge but it takes decades just to redo the interstate at the TX/LA border and in Beaumont.

Popular
Back to top
11














