- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message

Most Expensive Destroyer in Naval History Breaks Down
Posted on 11/23/16 at 7:41 am
Posted on 11/23/16 at 7:41 am
What did they expect? After all, it is a boat

quote:Doesn't surprise me...it's a boat
The most expensive destroyer ever built for the Navy suffered an engineering problem in the Panama Canal and had to be towed to port.
quote:
The second Zumwalt-class destroyer, which also cost more than $4.4 billion, was christened in a June ceremony during which U.S. Rep. Bruce Poliquin called it an "extraordinary machine of peace and security." The third ship is expected to cost a bit less than $3.7 billion. A spokeswoman for Bath Iron Works said the shipyard was not planning to comment on the breakdown and deferred to the Navy.

This post was edited on 11/23/16 at 7:43 am
Posted on 11/23/16 at 7:42 am to TexasTiger90
everything we do now is fricking overcomplicated and broken. 16 months.
Posted on 11/23/16 at 7:45 am to TexasTiger90
This is why the military needs more money from the government
Posted on 11/23/16 at 7:48 am to TexasTiger90
quote:
What did they expect? After all, it is a boat
quote:
Doesn't surprise me...it's a boat
go ahead and make it a trifecta, maybe the 3rd time will get the chuckles you so desire
Posted on 11/23/16 at 7:50 am to TexasTiger90
Should have let dem baws at verret build it.
This post was edited on 11/23/16 at 9:20 am
Posted on 11/23/16 at 7:55 am to TexasTiger90
Guess we should do anyway with the Navy. After all....boats. Right?
Posted on 11/23/16 at 7:57 am to TexasTiger90
1st production boats always have problems
Someone needs to create a gif with a AAA boat towing this albatross
Someone needs to create a gif with a AAA boat towing this albatross
Posted on 11/23/16 at 7:58 am to WG_Dawg
quote:
go ahead and make it a trifecta, maybe the 3rd time will get the chuckles you so desire
BOAT: Break Out Another Thousand!
Posted on 11/23/16 at 8:27 am to im4LSU
quote:
thanks obama
this class of ship was designed in 2001 and ordered in 2005
yep, thanks Obama for cancelling the contract (in 2008) that originally called for 32 Zumwalts settling for 3 ships so that the shipbuilders did not go out of business
I'm no Obama fan but I cannot blame him for this project
This post was edited on 11/23/16 at 8:29 am
Posted on 11/23/16 at 8:47 am to TexasTiger90
$4.4 billion for a fricking destroyer? That's beyond retarded.
Posted on 11/23/16 at 8:56 am to ChewyDante
quote:
$4.4 billion for a fricking destroyer?
It'd be worth $4.4B if it was actually capable of delivering the promises that were supposedly designed into this project
Currently its electronics cannot support ABM or AA missile tracking/guidance.
It's power/propulsion system was slapped in when the originally designed PPM could not meet spec. The current form produces 10% of the power of the originally designed PPM
This thing is a pig and would have been a topline albatross if it weren't for the headline grabbing F-35 overshadowing it.
This post was edited on 11/23/16 at 8:57 am
Posted on 11/23/16 at 8:58 am to TexasTiger90
Break
Out
Another
Trillion
Out
Another
Trillion
Posted on 11/23/16 at 9:04 am to Trout Bandit
What's incredibly scary is that this project promised to deliver capabilities that could have made it a replacement for the AEGIS cruiser. The next gen CG(x) was delayed to concentrate on DDG-1000.
Now the Navy is stuck with AEGIS entering its 30th year of service and still being the only ABM platform in our arsenal. While we refocus on Arleigh Burke FLight III and what our new crusier fleet will look like.
With Russia's renewed naval power projection and China's bullying tactics in the SCS. DDG-1000's expensive failures have closed the Surface warefare technological gap compared to our adversaries.
Now the Navy is stuck with AEGIS entering its 30th year of service and still being the only ABM platform in our arsenal. While we refocus on Arleigh Burke FLight III and what our new crusier fleet will look like.
With Russia's renewed naval power projection and China's bullying tactics in the SCS. DDG-1000's expensive failures have closed the Surface warefare technological gap compared to our adversaries.
This post was edited on 11/23/16 at 9:07 am
Posted on 11/23/16 at 9:04 am to TexasTiger90
They say a boat is an expense and not an investment...
Posted on 11/23/16 at 9:18 am to TexasTiger90
quote:
Most Expensive Destroyer in Naval History Breaks Down
Thanks, Obama.
Posted on 11/23/16 at 9:18 am to TexasTiger90
Probably died of the Uglies.
How a ship can cost $4,400,000,000 is beyond me. I could get a couple coonass buddies of mine to slap that together for $300,000,000. I'll even throw in Kort Nozles, top the fuel tanks and fill the fridge with beer.
How a ship can cost $4,400,000,000 is beyond me. I could get a couple coonass buddies of mine to slap that together for $300,000,000. I'll even throw in Kort Nozles, top the fuel tanks and fill the fridge with beer.
Posted on 11/23/16 at 9:25 am to TexasTiger90
Ladies and gentlemen, our government:
quote:
The lead ship is named Zumwalt for Admiral Elmo Zumwalt, and carries the hull number DDG-1000. Originally 32 ships were planned, with $9.6 billion research and development costs spread across the class. As costs overran estimates, the quantity was reduced to 24, then to 7, and finally to 3, significantly increasing the cost-per-ship to $3.96 billion (excluding R&D costs)[1][16][17] – well-exceeding the per-unit cost of a nuclear-powered Virginia-class submarine ($2.688 billion).[18][19] The dramatic per-unit cost increases eventually triggered a Nunn-McCurdy Amendment breach, and cancellation of further production.[20][21] In April 2016, the total program cost was $22.5 billion with an average cost of $7.5 billion per ship.[2]
Posted on 11/23/16 at 9:28 am to TexasTiger90
quote:
...it's a boat
break out another thousand
Popular
Back to top


23








