Started By
Message

re: Over 1,000 jobs cut by company building Keystone XL pipeline after Biden ends project

Posted on 1/22/21 at 12:25 pm to
Posted by kywildcatfanone
Wildcat Country!
Member since Oct 2012
119479 posts
Posted on 1/22/21 at 12:25 pm to
EHC
Posted by bbap
Baton Rouge, LA
Member since Feb 2006
96028 posts
Posted on 1/22/21 at 12:26 pm to
quote:

I learned the other day that those blades on the wind turbines only last 2 years and no landfills will take them so there are piles of massive blades just stacked up that they can't do anything with



If landfills wont take them, where are they stacked up? Just curious.
Posted by 777Tiger
Member since Mar 2011
73856 posts
Posted on 1/22/21 at 12:27 pm to
quote:

where are they stacked up? Just curious.



the everblades I think
Posted by bbap
Baton Rouge, LA
Member since Feb 2006
96028 posts
Posted on 1/22/21 at 12:27 pm to
Posted by fr33manator
Baton Rouge
Member since Oct 2010
124558 posts
Posted on 1/22/21 at 12:27 pm to
quote:

If landfills wont take them, where are they stacked up? Just curious.


They’ll be used to build “re-education camps” for wrongthinkers
Posted by upgrayedd
Lifting at Tobin's house
Member since Mar 2013
134887 posts
Posted on 1/22/21 at 12:28 pm to
quote:

If landfills wont take them, where are they stacked up? Just curious.

I assume either in a designated location or on the wind farm properties.
Posted by fr33manator
Baton Rouge
Member since Oct 2010
124558 posts
Posted on 1/22/21 at 12:29 pm to
quote:

the everblades I think


Yeah...I can’t top this. You win
Posted by Zendog
Santa Barbara
Member since Feb 2019
4516 posts
Posted on 1/22/21 at 12:31 pm to
Thats just one problem with government. Think of all that money spent on building it this far and now not using it.
Posted by Klark Kent
Houston via BR
Member since Jan 2008
67019 posts
Posted on 1/22/21 at 12:31 pm to
Oweo supports this.
Posted by 777Tiger
Member since Mar 2011
73856 posts
Posted on 1/22/21 at 12:31 pm to
quote:

You win




wonder why they won't take them, they look like they're fiberglass or some sort of lightweight composite, would make good artificial fishing reefs in the gulf
Posted by upgrayedd
Lifting at Tobin's house
Member since Mar 2013
134887 posts
Posted on 1/22/21 at 12:33 pm to
quote:

wonder why they won't take them, they look like they're fiberglass or some sort of lightweight composite, would make good artificial fishing reefs in the gulf


I think they just take up way too much space. They're carbon fiber, IIRC.
Posted by 777Tiger
Member since Mar 2011
73856 posts
Posted on 1/22/21 at 12:33 pm to
quote:

I think they just take up way too much space


grind those bitches up?
Posted by upgrayedd
Lifting at Tobin's house
Member since Mar 2013
134887 posts
Posted on 1/22/21 at 12:35 pm to
I believe there are some people working on something like that. But there are some pretty serious safety issues with grinding that shite up.
Posted by 777Tiger
Member since Mar 2011
73856 posts
Posted on 1/22/21 at 12:36 pm to
quote:

I believe there are some people working on something like that


a niche gold mine I'd assume
Posted by glassman
Next to the beer taps at Finn's
Member since Oct 2008
116173 posts
Posted on 1/22/21 at 12:36 pm to
quote:

They're carbon fiber, IIRC.


Yep and high end epoxy resin.
Posted by Traveler
I'm not late-I'm early for tomorrow
Member since Sep 2003
24275 posts
Posted on 1/22/21 at 12:36 pm to
quote:

blades on the wind turbines only last 2 years

I thought the design limits was 20? Either way, that is a lot of stacking for retired blades. They have to go somewhere.
Posted by bbap
Baton Rouge, LA
Member since Feb 2006
96028 posts
Posted on 1/22/21 at 12:37 pm to
quote:

They're carbon fiber, IIRC.


That's some good stuff. Seems crazy they haven't figured a way to recycle them yet.
Posted by upgrayedd
Lifting at Tobin's house
Member since Mar 2013
134887 posts
Posted on 1/22/21 at 12:37 pm to
Oh, for sure.

Posted by Riseupfromtherubble
You'll Never Walk Alone
Member since Jun 2011
38382 posts
Posted on 1/22/21 at 12:45 pm to
quote:

TC Energy is but the first domino to fall.....the fallout on this is gonna be big.




Berg Pipe had a big contract to build some of that pipeline. They have operations in Panama City and Mobile here in this part of the world. Probably going to see big layoffs there, and of course it will trickle down to their vendors missing out on expected sales which could lead to more layoffs.

Elections have consequences, unfortunately
Posted by crazyLSUstudent
391 miles away from Tiger Stadium
Member since Mar 2012
5530 posts
Posted on 1/22/21 at 12:46 pm to
quote:

I learned the other day that those blades on the wind turbines only last 2 years


You have a source for this?

first pageprev pagePage 2 of 6Next pagelast page

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram