Started By
Message

re: Texas halting approval of Data Centers until audits are completed!

Posted on 8/4/26 at 9:09 am to
Posted by loogaroo
Welsh
Member since Dec 2005
43357 posts
Posted on 8/4/26 at 9:09 am to
quote:

That's how these things should be run. Is the Haynesville region not able to supply enough natural gas and produced water for the Meta data center in Richland Parish?


They are leasing again in Natchitoches Parish. Bonus is already up to $2k per acre.
This post was edited on 8/4/26 at 9:14 am
Posted by America250
Member since Jun 2026
97 posts
Posted on 8/4/26 at 9:16 am to
You are fos if you think the Holly Ridge area has an abundance of water. Unless they plan on using groundpipe and pump it from the MS River.

This META center is for now the largest one ever being built. Lesser known is Google is building one next to it.

There are two data centers needing power and water in Holly Ridge
Posted by Dire Wolf
bawcomville
Member since Sep 2008
40689 posts
Posted on 8/4/26 at 9:23 am to
Abbott is doing anything he can to save face with independent and moderates in the state

The weed shite Dan Patrick pushed and the senate race has republicans worried for the first time in a long time
Posted by Bourre
Da Parish
Member since Nov 2012
24183 posts
Posted on 8/4/26 at 9:26 am to
The Chinese Communist Party appreciates your devotion to The Party, comrade
This post was edited on 8/4/26 at 9:41 am
Posted by loogaroo
Welsh
Member since Dec 2005
43357 posts
Posted on 8/4/26 at 9:27 am to
At least we will have a more gas fired power plants and beefed up infrastructure once the tech companies no longer need these huge facilities. Plus, I doubt many of the data centers will be completed before the technology advances.
Posted by doubleb
Baton Rouge
Member since Aug 2006
42989 posts
Posted on 8/4/26 at 9:30 am to
quote:

As a data center engineer, this is a good move. Too many ignorant localities are approving data centers without any understanding of what is coming. The towns/cities need to be forcing the data center companies to pony up for the extra infrastructure required to support the data centers.


Here in La. the revenue gained from sales taxes on materials and equipment for these data centers is enormous.
Posted by doubleb
Baton Rouge
Member since Aug 2006
42989 posts
Posted on 8/4/26 at 9:33 am to
quote:

How is the state going to provide enough water without draining aquifers depleting water needed for homes, farming, etc?


Why wouldn’t the data centers not recirculate water? Sure they’d use water for their cooling towers and closed loop systems, but it’s not 100% in and 100% out.
This post was edited on 8/4/26 at 9:37 am
Posted by boogiewoogie1978
Little Rock
Member since Aug 2012
20409 posts
Posted on 8/4/26 at 9:36 am to
Data centers are a tricky thing. We must have them but nobody wants them.
Posted by HubbaBubba
North of DFW, TX
Member since Oct 2010
52515 posts
Posted on 8/4/26 at 9:44 am to
quote:

Haynesville region is over 100 miles away
And what tributary and aquifer does it feed off of for water? Who is feeding it the massive amounts of electrical power generation it requires.

At some point, if this does not stop, when the water and electric bills of ordinary Americans are impacted to the point of clear excess, people are going to revolt. The early signs are there and they'll only be ignored for so long.
Posted by America250
Member since Jun 2026
97 posts
Posted on 8/4/26 at 10:08 am to
The Sparta aquifer covers Northwest and North Central Louisiana.
Posted by TrueTiger
Chicken's most valuable
Member since Sep 2004
83389 posts
Posted on 8/4/26 at 10:13 am to
AI development is an interesting topic.

Building it up has local risks.


But not developing it has national security risks.
Posted by el Gaucho
He/They
Member since Dec 2010
59883 posts
Posted on 8/4/26 at 10:14 am to
If that guy is still here I’ll shill for data centers if I get a check
Posted by America250
Member since Jun 2026
97 posts
Posted on 8/4/26 at 10:14 am to
The Meta center has registered a maximum water limit of 23M gallons a day. They have already announced an expansion of the project.

No word on the amount of water needed for the Google center across the road.
Posted by idlewatcher
Planet Arium
Member since Jan 2012
98380 posts
Posted on 8/4/26 at 10:16 am to
quote:

Some people want to allow multi national conglomerates to run roughshod over their communities with impunity. That’s downright stupid.


All about the $$.

“Oh, you’re willing to front a new road and shopping center??!! Where do I sign??”
Posted by America250
Member since Jun 2026
97 posts
Posted on 8/4/26 at 10:19 am to
Just how safe do you think America's electrical grid is from chinese hackers?
Posted by HC87
Coastal NC
Member since Dec 2014
5678 posts
Posted on 8/4/26 at 10:43 am to
quote:

The towns/cities need to be forcing the data center companies to pony up for the extra infrastructure required to support the data centers.


THIS! They need to have skin in the game, a lot of it, vice passing off these expenses to the local residents.
Posted by doubleb
Baton Rouge
Member since Aug 2006
42989 posts
Posted on 8/4/26 at 10:46 am to
quote:

pleted!by America250The Meta center has registered a maximum water limit of 23M gallons a day


Is that initially or a daily rate?
Posted by Riverside
Member since Jul 2022
11406 posts
Posted on 8/4/26 at 10:51 am to
quote:

When will Louisiana and Gov Landry do the same?


Hopefully never. Louisiana should do the exact opposite. This is a massive mistake by Texas and Louisiana should pounce on it. Our state desperately needs capital investment and wealth infusion.
Posted by BCvol
Member since Jan 2022
680 posts
Posted on 8/4/26 at 10:53 am to
Elon making bank with the extra compute.
Posted by DarthRebel
Tier Five is Alive
Member since Feb 2013
26034 posts
Posted on 8/4/26 at 10:59 am to
quote:

Richland data is a closed loop system. They will lose some to evaporation but it won’t use the absurd amounts of water that some of the older data centers use


I am not a anti-data center person, but this talking point usually fails. The heat in the closed loop has to be dumped. What is the Richland data center going to use to dump the heat?

You cannot ignore that new power plants that have to be created to power the data centers, which usually come with a huge consumption of water.

Closed loop only reduces water consumption internally, however each data center consumes a ton of water externally either directly or indirectly.
first pageprev pagePage 2 of 2Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on X, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookXInstagram