Started By
Message

re: Links to live feeds from remotely operated vehicles (ROV)

Posted on 5/31/10 at 11:34 pm to
Posted by omegaman66
greenwell springs
Member since Oct 2007
27203 posts
Posted on 5/31/10 at 11:34 pm to
I wonder if they are watching the lean while the cut the riser further down stream. To make sure nothing moves and posibble weakens or starts leaking.
Posted by GM4UA
Mobile, AL
Member since Nov 2008
268 posts
Posted on 5/31/10 at 11:35 pm to
I'd think that after 40 days with the BOP being the center of attention, there is about 0% chance of them not knowing.
Posted by Dribble
Hey, nice marmot.
Member since Jun 2008
9576 posts
Posted on 5/31/10 at 11:37 pm to
That is what you get for thinking...
Posted by paulie
NOLA
Member since Dec 2007
675 posts
Posted on 5/31/10 at 11:39 pm to
quote:

I wonder if they are watching the lean while the cut the riser further down stream. To make sure nothing moves and posibble weakens or starts leaking.


I was thinking the same thing although it would be cool to see the shears in action. I guess we are lucky to see anything at all.

Judge, I think you've got it there with making sure that cut will be level. That just adds another dimension of uncertainty with the elastomer seal they will use.
Posted by paulie
NOLA
Member since Dec 2007
675 posts
Posted on 5/31/10 at 11:49 pm to
Here comes the shears!
Posted by MountainTiger
The foot of Mt. Belzoni
Member since Dec 2008
14958 posts
Posted on 5/31/10 at 11:54 pm to
The Shears of Doom (tm). Looks like something out of a Bond movie.

Somebody asked the question, when will the cut be made on the top of the LMRP. The video that paulie linked said toward the end of the week. Seems like they're close to being ready but there must be a lot of stuff to do yet, like cut the other end of the riser.
Posted by paulie
NOLA
Member since Dec 2007
675 posts
Posted on 5/31/10 at 11:54 pm to
I think this is the shear specs:

LINK
Posted by TickledTiger
Down & Out
Member since Dec 2007
2837 posts
Posted on 5/31/10 at 11:56 pm to
quote:

Anybody have an explanation for all the debris/stuff moving across screen right to left?


Are they still applying the dispersant down there?
Posted by paulie
NOLA
Member since Dec 2007
675 posts
Posted on 6/1/10 at 1:09 am to
Not sure about the dispersant. Last I hear a couple of days ago they had reduced how much they were using.

Looks like they are lowering the diamond wire saw now on the live feed.
Posted by omegaman66
greenwell springs
Member since Oct 2007
27203 posts
Posted on 6/1/10 at 1:50 am to
1:48 a.m. and it looks like they are about to cut off the riser.
Posted by GetEmTigers08
Mississippi
Member since Dec 2007
1242 posts
Posted on 6/1/10 at 2:09 am to
That saw is having a little trouble maneuvering into position away from the plume
Posted by JudgeHolden
Gila River
Member since Jan 2008
18566 posts
Posted on 6/1/10 at 6:49 am to
quote:

That saw is having a little trouble maneuvering into position away from the plume



Are they cutting yet?
Posted by JudgeHolden
Gila River
Member since Jan 2008
18566 posts
Posted on 6/1/10 at 6:53 am to
quote:

I wonder if they are watching the lean while the cut the riser further down stream. To make sure nothing moves and posibble weakens or starts leaking.


I think that is on the money. They have to be concerned what is going to happen when the weight of the riser comes off the stack.

I haven't been watching, but I am betting they slacked up the weight on the riser by pulling up on the crane, all the while watching the angle of the stack, before they started cutting. If they thought the riser was holding up the stack, I am sure they would not be cutting it off.
Posted by JudgeHolden
Gila River
Member since Jan 2008
18566 posts
Posted on 6/1/10 at 6:57 am to
Wow! Check that bad boy out! They are showing the hydraulic cutters right now.
Posted by KappaSwig
Louisiana
Member since Nov 2009
502 posts
Posted on 6/1/10 at 7:09 am to
Looks like they're trying to guide the shears over the riser at this point.
Posted by CootKilla
In a beer can/All dog's nightmares
Member since Jul 2007
6184 posts
Posted on 6/1/10 at 7:11 am to
Looks like they are moving the shears into place. I thought the riser was already cut on top of the bop.
Posted by TIGER2
Mandeville.La
Member since Jan 2006
10511 posts
Posted on 6/1/10 at 7:36 am to
Looks like they need to rotate the shear 180 degrees.
Posted by JasonLSU
Houston, TX
Member since Oct 2007
1906 posts
Posted on 6/1/10 at 7:53 am to
Shear is on the pipe now--wonder how long before they cut.
Posted by TIGER2
Mandeville.La
Member since Jan 2006
10511 posts
Posted on 6/1/10 at 8:01 am to
Looks like the shear might not catch all of one of the smaller pipes. Need to drop it down another ten inches.
This post was edited on 6/1/10 at 8:02 am
Posted by tiger 56
Severn, MD
Member since Dec 2003
1712 posts
Posted on 6/1/10 at 8:10 am to
are they sliding the shear closer to the
BOP?
first pageprev pagePage 86 of 174Next pagelast page

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on X, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookXInstagram