- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
re: Let’s discuss China’s 10 day construction schedule hospital
Posted on 1/26/20 at 11:40 am to Meauxjeaux
Posted on 1/26/20 at 11:40 am to Meauxjeaux
I saw a time lapse video of them tearing down and reconstruction an interstate overpass in 24 hours. It was awesome. It also makes me hate Louisiana
Posted on 1/26/20 at 11:43 am to bbeck
Yeah it’s just a prefab building that they will treat people in. They aren’t building a true hospital.
Posted on 1/26/20 at 12:16 pm to ZappBrannigan
It’ll be a temporary thing. Built up and used for this situation and burned to a crisp once it’s over.
Posted on 1/26/20 at 12:48 pm to Rocket Surgeon
A building is not a hospital.
Where’s the zone pressurized HVAC system? What about the sterilized stainless piping carrying oxygen to each room?
Where’s the zone pressurized HVAC system? What about the sterilized stainless piping carrying oxygen to each room?
Posted on 1/26/20 at 12:50 pm to Meauxjeaux
Reeds Metals offers same day availability on standard roofing orders, on-site roll-forming for standing seam projects, and job-site delivery within 72-hours.
Posted on 1/27/20 at 7:57 am to Rocket Surgeon
Is the electrical systems in, the special systems, ductwork, plumbing, sprinkler, flooring, ceiling, etc.; or is it just a big shell?
Posted on 1/27/20 at 8:06 am to Rocket Surgeon
From just an aesthetic perspective, that building looks better than many modern American buildings.
The Chinese communists built that, you say? Hmm, very interesting.
Posted on 1/27/20 at 8:10 am to Meauxjeaux
your talking about a HVAC system and piping requirements in America. WHO standards are not at our level to be considered a basic hospital to handle what they are dealing with. Oxygen would be portable systems anyway in short notice situations. And yes their ability to throw together these hospitals isn't even a tough timeline to meet. Their engineering and pre fabrication ability dwarfs what we do here in the States. They could tear down and rebuild I-10 bridge in less than 3 weeks......they do it all the time.
Posted on 1/27/20 at 9:15 am to Rocket Surgeon
quote:
This building went up in three days.
From vacant lot to putting the windows in and painting the interior on day four.
Hmmm.........
Posted on 1/27/20 at 9:20 am to Asharad
Post apocalypse use can be one of those fancy meat markets where you can buy a wolf, python, Bat and shite in the hallway
Posted on 1/28/20 at 5:58 am to Asharad
LSU has inspired Coronavirus Hype Videos.
Posted on 1/28/20 at 6:17 am to Meauxjeaux
So there were no hospitals before air conditioning? They were all just buildings?
Posted on 1/28/20 at 6:42 am to Meauxjeaux
I wouldn’t step foot in a Chinese building built in 10 days. I’ve been in many of their buildings built in standard conditions and they are bad enough. They take so many short cuts and use crap materials it’s laughable. These guys took me to a plant under construction and proudly showed me the new R&D building. Windows and doors were out of square and looked more like a rhombus. It seemed to crush them when I pointed it out to them.
Posted on 1/28/20 at 6:44 am to Meauxjeaux
quote:
IMO that’s impossible.
Posted on 2/1/20 at 9:35 am to YouAre8Up
Latest video. https://m.weibo.cn/status/4467234321334139?
Popular
Back to top


0









