- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message

Let’s discuss China’s 10 day construction schedule hospital
Posted on 1/26/20 at 11:03 am
Posted on 1/26/20 at 11:03 am
IMO that’s impossible.
They’re building a mausoleum, not a hospital.
They’re building a mausoleum, not a hospital.
Posted on 1/26/20 at 11:04 am to Meauxjeaux
Prefab construction baw.
/thread
/thread
Posted on 1/26/20 at 11:06 am to Meauxjeaux
Yeah sounds sketchy as hell. Good luck with foundation and concrete etc. any updates on how it is going?
Posted on 1/26/20 at 11:08 am to Meauxjeaux
I would think more a glorified MASH unit. Nothing permanent is going to be built in 10days.
Posted on 1/26/20 at 11:09 am to Meauxjeaux
It will probably be just a metal building or tent run off generators
Posted on 1/26/20 at 11:09 am to Meauxjeaux
quote:
They’re building a mausoleum, not a hospital.
They dont care, they can afford to lose some population.
Posted on 1/26/20 at 11:12 am to Meauxjeaux
This is supposed to be the construction site in the past 24 hours.

Posted on 1/26/20 at 11:12 am to Asharad
That “hospital” looks like a prison. They’re building a quarantine camp
Posted on 1/26/20 at 11:13 am to Asharad
Why the bars on the windows
Posted on 1/26/20 at 11:14 am to Meauxjeaux
It’s a temporary hospital...
It will probably be something like an army DMAT unit...
It will probably be something like an army DMAT unit...
Posted on 1/26/20 at 11:15 am to Meauxjeaux
They built a hospital in the same amount of time over a decade ago. Basically just clearing some land and bringing in a ton of prefabricated buildings. Not gonna be anything special.
Posted on 1/26/20 at 11:21 am to TigerFox
quote:
Why the bars on the windows
You don't want the zombies getting out, duh.
Posted on 1/26/20 at 11:23 am to Asharad
That’s where I charge my radios during a turnaround
Baw
Baw
This post was edited on 1/26/20 at 11:24 am
Posted on 1/26/20 at 11:25 am to Meauxjeaux
Prefab construction. This building went up in three days.
From vacant lot to putting the windows in and painting the interior on day four.
It was like they were snapping Lego blocks together.
From vacant lot to putting the windows in and painting the interior on day four.
It was like they were snapping Lego blocks together.
Posted on 1/26/20 at 11:29 am to Meauxjeaux
They don’t have to put up with bullshite permitting and impact fees
Posted on 1/26/20 at 11:30 am to Dawgholio
quote:Or OSHA or the EPA or any of the other bullshite...
They don’t have to put up with bullshite permitting and impact fees
Posted on 1/26/20 at 11:33 am to Tiguar
quote:I'm hoping the bars on the windows are for the office or storage.
That “hospital” looks like a prison
Posted on 1/26/20 at 11:39 am to Meauxjeaux
Laughable to call it a hospital
Posted on 1/26/20 at 11:39 am to TigerFox
In most situations involving WHO or similar setting up a quick facility I'd say the bars were for anti-theft on a prefab medical supply storage unit.
This being China? Probably keeping occupants in while they determine viability of organ harvest.
This being China? Probably keeping occupants in while they determine viability of organ harvest.
Popular
Back to top


16








