How much deposit is usually required for a natural gas backup generator?

Posted on 5/29/22 at 10:55 am
Posted by prplhze2000
Parts Unknown
Member since Jan 2007
51432 posts
Posted on 5/29/22 at 10:55 am
Just curious.
Posted by EA6B
TX
Member since Dec 2012
14754 posts
Posted on 5/29/22 at 10:56 am to
Zero for mine.
Posted by keakar
Member since Jan 2017
30048 posts
Posted on 5/29/22 at 11:29 am to
quote:

How much deposit is usually required for a natural gas backup generator?


if you are dealing with any reputable company, none.
Posted by OysterPoBoy
City of St. George
Member since Jul 2013
35201 posts
Posted on 5/29/22 at 12:24 pm to
I didn’t pay anything until a few weeks after they completed everything and a guy came but for a final test and gave me an invoice.
Posted by prplhze2000
Parts Unknown
Member since Jan 2007
51432 posts
Posted on 5/29/22 at 12:38 pm to
The Generac dealer here is requiring 50% deposits and warning it may take up to 9 months to get a generator delivered.
Posted by Bayoubengal85
Kenner
Member since Sep 2005
300 posts
Posted on 5/29/22 at 12:46 pm to
Just had one installed by Mayeux's AC & Heating. No deposit and no invoice until the job was completely finished. They even waited until after Atmos changed out the regulator (needed more volume).

BTW, generator is a 20kW Kohler they had in stock. No ordering and waiting forever.
This post was edited on 5/29/22 at 12:49 pm
Posted by biggie
Member since May 2013
86 posts
Posted on 5/29/22 at 1:01 pm to
Reached out to them twice for an estimate over the last few months with no call back. How was install/service? I’m pretty set on Kohler and there aren’t many local options.
Posted by Bayoubengal85
Kenner
Member since Sep 2005
300 posts
Posted on 5/29/22 at 1:12 pm to
We had no trouble getting in touch with them. They handled everything from start to finish and were true to their word on when they would show up and the timeline for the install. The city actually kept the job from being finished sooner due to permits and inspections and being shorthanded.
Posted by OysterPoBoy
City of St. George
Member since Jul 2013
35201 posts
Posted on 5/29/22 at 2:50 pm to
The first company I called said 9 months also. This was a year ago. Another company was 6 weeks. It depends on what they have in stock or ordered I guess. The 59% deposit guys are probably getting a lot of people backing out because it’s taking too long.
Posted by Rhinotiger50
Right Here
Member since Mar 2010
220 posts
Posted on 5/30/22 at 10:22 am to
Most of the time, the down payment is the cost of the generator.
Posted by prplhze2000
Parts Unknown
Member since Jan 2007
51432 posts
Posted on 5/30/22 at 1:51 pm to
The company here is in subchapter 5 bankruptcy and telling people it is a 42 week wait to get the generator delivered and installed. Still advertising, still going. Owes Generac $45k.
Posted by Arkapigdiesel
Arkansas
Member since Jun 2009
13259 posts
Posted on 5/30/22 at 2:03 pm to
quote:

Reached out to them twice for an estimate over the last few months with no call back.

It boggles my mind that a company would do this. I'd never in a million years give my money to a person/company that won't call me back. It's as if they think they are the only game in town.
Posted by bapple
Capital City
Member since Oct 2010
11895 posts
Posted on 5/30/22 at 2:06 pm to
No deposit for the guy who sold me a Honeywell 20kW - Pabst Cooling Solutions in Abita Springs. I think he may require full price to reserve it but he has some of the fastest lead times I've seen.
Posted by BadInfluence
Member since Jun 2019
30 posts
Posted on 5/30/22 at 2:46 pm to
GenPro in Zachary is installing my Kohlar tomorrow, but I ordered it in December.
Posted by TigerLife63
Baton Rouge
Member since Aug 2019
204 posts
Posted on 5/30/22 at 3:19 pm to
Just installed one. Like others said, didn’t pay a dime until it was all done. For Generac, Optimize normally has them in stock. Would recommend.
Posted by ynlvr
Rocket City
Member since Feb 2009
4591 posts
Posted on 5/30/22 at 3:56 pm to
I worked with Lowes to install a 24kw generac. They beat all competing price and delivery time estimates. Very satisfied with install. This was a Bay St Louis Lowes and install.
Posted by Hopeful Doc
Member since Sep 2010
14965 posts
Posted on 5/30/22 at 4:37 pm to
I paid 50% to order and 50% to install.
Ordered in November
Transfer switch got backordered until March.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram