Planned I-10 widening will involve replacing elevated highway through Baton Rouge

Posted on 9/18/18 at 1:36 pm
Posted by AA77
Member since Jan 2016
3796 posts
Posted on 9/18/18 at 1:36 pm
quote:

Though final plans for widening the roughly 3.5-mile stretch of interstate won’t be released for several months, what is known is that the project is massive, comprehensive and ambitious. Not only is the state planning to add a new lane in each direction of I-10, which will involve changing, closing and relocating several existing interchanges; it also intends to replace the entire elevated portion of the interstate.

Louisiana Department of Transportation and Development Secretary Shawn Wilson says the 60-year-old structure is nearing the end of its life and will need to be replaced within 15 years anyway, so it only makes sense to do it now while adding a third lane in each direction.

The work will be done in phases that are projected to take between five and seven years. The first phase will begin at the base of the Mississippi River Bridge and work east to the City Park Lakes. The second phase will involve replacing the highway over the lakes. The third phase will extend from the lakes over the Perkins Road Overpass neighborhood past S. Acadian Thruway to College Drive, and the final phase will tie in a flyover ramp from College Drive to the I-10/I-12 split.

“Folks hear seven years and think, ‘Gee, my business will be in a difficult environment for seven years,’” Wilson says. “In reality, it might be a year and a half, and it might only be a month or so that you hear and see structure being pulled away and things being brought in and out on the structure. … When you build bridges these days there are a lot of things you can do offsite, so it’s like putting together a jigsaw puzzle and is less invasive than you might think.”



LINK
Posted by tigerinthebueche
Member since Oct 2010
36791 posts
Posted on 9/18/18 at 1:37 pm to
IT'LL NEVER BE READY ON TIME...
Posted by Sao
East Texas Piney Woods
Member since Jun 2009
65779 posts
Posted on 9/18/18 at 1:38 pm to

Elon Musk style
Posted by Tigerbait357
Member since Jun 2011
67935 posts
Posted on 9/18/18 at 1:38 pm to
I'll believe it when I see it
Posted by Chad504boy
4 posts
Member since Feb 2005
166323 posts
Posted on 9/18/18 at 1:38 pm to
a 7 year puzzle.

they need to do it big so that's good.

Posted by S
RIP Wayde
Member since Jan 2007
155705 posts
Posted on 9/18/18 at 1:39 pm to
quote:

The work will be done in phases that are projected to take between five and seven years.


So in Louisiana time that’ll be more like 18-25 years.
Posted by c on z
Zamunda
Member since Mar 2009
127415 posts
Posted on 9/18/18 at 1:40 pm to
This was already acknowledged in the public meetings.
Posted by LSUWoodworker
St George "God's Country "
Member since Dec 2007
18558 posts
Posted on 9/18/18 at 1:52 pm to
We will need to have a study completed on the time frame estimated.
Posted by teke184
Zachary, LA
Member since Jan 2007
95754 posts
Posted on 9/18/18 at 2:01 pm to
This is going to be a clusterfrick of epic proportions.
Posted by OKTGR580
Baton Rouge to Houston, TX
Member since Apr 2018
6318 posts
Posted on 9/18/18 at 2:07 pm to
Omg I’m so against widening I-10. It’ll hurt business. I love the traffic
Posted by AA77
Member since Jan 2016
3796 posts
Posted on 9/18/18 at 2:12 pm to
I’m pro business myself, so I love traffic.
Posted by Hammertime
Will trade dowsing rod for titties
Member since Jan 2012
43030 posts
Posted on 9/18/18 at 2:13 pm to
And 4x over budget
Posted by OysterPoBoy
City of St. George
Member since Jul 2013
35191 posts
Posted on 9/18/18 at 2:17 pm to
So those baws are out there right now adding a new exit before Washington and they're gonna tear it down in a few years?
Posted by Eighteen
Member since Dec 2006
33882 posts
Posted on 9/18/18 at 2:18 pm to
Ill check back in on this thread in 10 years and see how much is left
Posted by TigerStripes06
SWLA
Member since Sep 2006
30032 posts
Posted on 9/18/18 at 2:20 pm to
quote:

In reality, it might be a year and a half, and it might only be a month or so that you hear and see structure being pulled away and things being brought in and out on the structure


At least this guy has a sense of humor
Posted by TigerstuckinMS
Member since Nov 2005
33687 posts
Posted on 9/18/18 at 2:21 pm to
quote:

Louisiana Department of Transportation and Development Secretary Shawn Wilson says the 60-year-old structure is nearing the end of its life and will need to be replaced within 15 years anyway, so it only makes sense to do it now while adding a third lane in each direction.

"Let's tear everything down and rebuild what we needed twenty years ago. APPLAUD OUR INCOMPETENCE!"
Posted by YouAre8Up
in a house
Member since Mar 2011
12792 posts
Posted on 9/18/18 at 2:21 pm to
If this is the case then it won't be long before SWB and BR has this all fricked up.
Posted by member12
Bob's Country Bunker
Member since May 2008
32096 posts
Posted on 9/18/18 at 2:23 pm to
quote:

Planned I-10 widening will involve replacing elevated highway through Baton Rouge by AA77



It's needed. Infrastructure doesn't last forever.
Posted by NYNolaguy1
Member since May 2011
20898 posts
Posted on 9/18/18 at 2:24 pm to
quote:

The work will be done in phases that are projected to take between five and seven years.


Posted by AA77
Member since Jan 2016
3796 posts
Posted on 9/18/18 at 2:25 pm to
Tell that to all the braws who get their hair cut at Troy’s.
first pageprev pagePage 1 of 4Next pagelast page