- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
Nicholson and Brightside construction question
Posted on 4/29/19 at 12:02 pm
Posted on 4/29/19 at 12:02 pm
Haven’t passed in a while and did today. Are they finally gonna put left turn lanes on 30 ?
Posted on 4/29/19 at 12:04 pm to lgtiger
Whatever they are doing now should've been done 15 years ago. And what they'll end up doing in 15 years is what they should be doing now.
Posted on 4/29/19 at 12:06 pm to lgtiger
This should have happened in the 90's
Posted on 4/29/19 at 12:08 pm to ellishughtiger
quote:
This should have happened in the 90's
No doubt. Much of it has to do with the railroad being a mother fricker to deal with. They don’t want play well with others.
Posted on 4/29/19 at 12:08 pm to LSUSilverfox
quote:
Whatever they are doing now should've been done 15 years ago. And what they'll end up doing in 15 years is what they should be doing now.
Try 25 years ago. But you have a valid post
Posted on 4/29/19 at 12:12 pm to ksayetiger
Does anyone know the estimated completion date? I will then add 18 months to that date.
Posted on 4/29/19 at 12:15 pm to nrtiger
quote:
Does anyone know the estimated completion date? I will then add 18 months to that date.
2006.
Posted on 4/29/19 at 12:20 pm to LSUSilverfox
Should’ve been done in late 70’s when I was in school
Posted on 4/29/19 at 12:22 pm to ksayetiger
quote:
Try 25 years ago.
I didn't spend much time on that side of town back then.
It shouldn't take a genius to figure out that Nicholson should be a 5 lane highway from campus all the way to I-10 by Tanger. And I realize the railroad creates some issues but that is literally only 1 maybe 2 intersections that would require some creative thinking.
This post was edited on 4/29/19 at 12:23 pm
Posted on 4/29/19 at 12:25 pm to lgtiger
Just the fact that there was never a green arrow for cars turning left onto Brightside is beyond belief. Labadieville does it better, and they have one light.
Posted on 4/29/19 at 12:32 pm to The Shed
It's not a loop but slow progress
Posted on 4/29/19 at 12:32 pm to The Shed
I believe it was scheduled for july, 2018 to July 2019. We have had a ton of rain so I assume that will be pushed back. I am actually impressed with the design on DOTD site.
Posted on 4/29/19 at 12:33 pm to lgtiger
quote:
Nicholson and Brightside construction question
Still doing work on the bridge just after the intersection. Have not seen any dirt work other than that at the moment.
Posted on 4/29/19 at 1:32 pm to Tigeralum2008
quote:
Still doing work on the bridge just after the intersection. Have not seen any dirt work other than that at the moment.
They have been installing large box culverts and the plan appears to go to the culverts and not a traditional bridge as they’ve had before.
They have also done some major drainage work on 30 where those apartments and shuttered convenience store are. They have also doing some drainage work between 30 and the RR track.
Posted on 4/29/19 at 2:32 pm to CrawKing
quote:
I am actually impressed with the design on DOTD site.
Link please because I cannot find it.
Posted on 4/29/19 at 2:34 pm to lgtiger
Waiting for Hammertime’s response here because he’s
Popular
Back to top
Follow TigerDroppings for LSU Football News