- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
It will never be ready in time - MSY new terminal delayed yet again
Posted on 9/20/18 at 12:43 pm
Posted on 9/20/18 at 12:43 pm
Water is wet.
LINK
quote:
Louis Armstrong International Airport's move to a new terminal on the north side of the airfield will be delayed until May, or one year after the original plan, according to a source with knowledge of the new date.
That would mean the transfer to the new terminal would occur after the New Orleans Jazz and Heritage Festival -- a big tourist draw -- ends on May 6. Airport officials, who would not immediately discuss the issue Thursday morning, had planned most recently to open the new terminal on Feb. 20.
The latest postponement was occasioned by the need to install another sewage pipe at the new terminal after unsteady soils caused the original one to shift below ground. The cost of the fix will be $7.5 million, officials have said.
LINK
Posted on 9/20/18 at 12:44 pm to jbgleason
quote:
The latest postponement was occasioned by the need to install another sewage pipe at the new terminal after unsteady soils caused the original one to shift below ground.
They should have just called that baw that has his granny yelling at him all the time. Probably could have done it cheaper and faster.
Posted on 9/20/18 at 12:46 pm to jbgleason
quote:
The latest postponement was occasioned by the need to install another sewage pipe at the new terminal after unsteady soils caused the original one to shift below ground
If that ain’t the Louisianaest shite ever.
Posted on 9/20/18 at 12:46 pm to jbgleason
quote:
MSY new terminal delayed yet again
This post was edited on 9/20/18 at 12:48 pm
Posted on 9/20/18 at 12:47 pm to jbgleason
No competent Contractor pays sewer lines without a soil testing company testing the soil and stopping that from happening.
Posted on 9/20/18 at 12:48 pm to jbgleason
According to this board, they don't even have a road going to it so maybe kicking it in the old terminal for a while longer isn't the worst idea.
Posted on 9/20/18 at 12:48 pm to jbgleason
I have the Opening Date of Tuesday, June 18th, 2019 in the industry-wide pool.
Posted on 9/20/18 at 12:49 pm to Lsuhack1
quote:
No competent Contractor pays sewer lines without a soil testing company testing the soil and stopping that from happening.
In fairness, Landrieu Sewer Lines, Inc. is still a little new at this.
This post was edited on 9/20/18 at 12:50 pm
Posted on 9/20/18 at 12:57 pm to jbgleason
Shouldn’t the contractor cover this cost?
Posted on 9/20/18 at 12:57 pm to jbgleason
quote:
install another sewage pipe at the new terminal after unsteady soils caused the original one to shift below ground. The cost of the fix will be $7.5 million, officials have said.
I wish I could get in on this frickery
Posted on 9/20/18 at 1:02 pm to upgrayedd
quote:
I wish I could get in on this frickery
1. Do job wrong, get paid for it.
2. Re-Do job correctly, get paid for it again.
3. Slip cash to Landrieu family under the table for original contract.
4. Profit.
Posted on 9/20/18 at 1:10 pm to jbgleason
And a LOT of sand and fill was brought in on this job BEFORE construction. The engineers were ok with what they had and the GC brought in a buttload more sand because they werent satisfied with what the engineers were saying.
Posted on 9/20/18 at 1:11 pm to jbgleason
Wtf is wrong with this state
Posted on 9/20/18 at 1:13 pm to jbgleason
quote:
need to install another sewage pipe at the new terminal after unsteady soils caused the original one to shift below ground
Prediction: the new terminal will have the permanent strong smell of raw sewage.
Posted on 9/20/18 at 1:20 pm to jbgleason
quote:
The latest postponement was occasioned by the need to install another sewage pipe at the new terminal after unsteady soils caused the original one to shift below ground. The cost of the fix will be $7.5 million, officials have said.
The virtues of Design-Build construction where the Gov't is the client.
I've also heard the two General Contractors on the building because one GC isn't enough screwed up the dimensions and now all of the restaurants that signed leases are crunched so tight together that some of the kitchens won't work. Tack on another $20 million to fix that problem.
Posted on 9/20/18 at 1:42 pm to jbgleason
quote:
The latest postponement was occasioned by the need to install another sewage pipe at the new terminal after unsteady soils caused the original one to shift below ground. The cost of the fix will be $7.5 million, officials have said.
In other news, an ambulance was called to the engineering firm that designed the Baton Rouge Library after two project leads passed out from laughing.
Posted on 9/20/18 at 1:54 pm to jbgleason
One thing not mentioned was the original plan called for two concourses. A third was added after construction started. Cheaper to build it now than add on later.
Posted on 9/20/18 at 1:56 pm to jbgleason
This is my shocked face
-_-
-_-