re: HWY 73 construction finished in Prairieville - I am disappoint

Posted on 11/3/15 at 5:21 pm to
Posted by Sentrius
Fort Rozz
Member since Jun 2011
64757 posts
Posted on 11/3/15 at 5:21 pm to
quote:

I've been watching the private sector blow up on all the major arteries from Neighborhood Walmart to Leblanc's, strip malls, etc. and ONE road has been widened in this 4 yr span.


We've benne letting commercial and real estate developers running buck wild in this parish. And I'm tired of it. We're making the same mistakes BR made decades ago in its expansion by letting small town guys run things and we're going to get fricked up the arse here.

But there's a runoff election for parish president in Clint Cointment and Kenny Matassa. I'm voting for Clint as he's by far the better option as opposed to Matassa as he gets that traffic infrastructure and sewage development needs to happen before anything commercial and real estate goes. Matassa is just for the status quo.
This post was edited on 11/3/15 at 5:24 pm
Posted by fightin tigers
Downtown Prairieville
Member since Mar 2008
79881 posts
Posted on 11/3/15 at 5:37 pm to
Well they beat the construction on Napoleon on NOLA.

Pville got Barber Brother'd



Has the 42 project really been reduced to three lanes?
Posted by GeauxTime9
Baton Rouge, La
Member since Dec 2010
7095 posts
Posted on 11/3/15 at 6:38 pm to
Aren't there some new things coming to 73 also? I had someone tell me a new neighborhood was going up and like a target or something?
Posted by ThreeDayDrunk
BR
Member since May 2014
85 posts
Posted on 11/3/15 at 6:49 pm to
Well it's assfault so it will need to be redone in 10 years or less.

The bid for a concrete road easily lasting three times as long was less than a couple hundred thousand dollars above. Pathetic decision making.
This post was edited on 11/3/15 at 6:51 pm
Posted by EZE Tiger Fan
Member since Jul 2004
55457 posts
Posted on 11/3/15 at 7:21 pm to
I just moved from that area. I don't miss it.

Got hours of my life back a week not having to deal with that shut.
Posted by Martini
Near Athens
Member since Mar 2005
49697 posts
Posted on 11/3/15 at 8:01 pm to
quote:

The states bidding policy is to blame. Get better contractors by not going with shady low-bidders. I-10 Expansion from split to Highland is perfect example.


Public bid has nothing to do with it. Austin Bridge and Road is hardly shady - the biggest problem they had with I-10 to Highland is they loaded up on Obamas "shovel ready" projects and got caught thin.

And Ascension Parish can supplement the state contract if they prefer 4 lanes instead of 3- which dear god that road needed it. EBR supplemented Jefferson Hwy, Old Hammond Hwy and I believe Burbank. Or get better politicians in the state house.

That will prove to be a big mistake by not adding extra lanes during that time.
Posted by fightin tigers
Downtown Prairieville
Member since Mar 2008
79881 posts
Posted on 11/3/15 at 8:06 pm to
I think jones creek as well, but it has been years since I talked with the engineer for that project.

Did they ever finish the Tiger Bend to Coursey section?
This post was edited on 11/3/15 at 8:07 pm
Posted by dyslexic
Left field
Member since Nov 2010
6640 posts
Posted on 11/3/15 at 8:10 pm to
Posted by SG_Geaux
Beautiful St George, LA
Member since Aug 2004
80838 posts
Posted on 11/3/15 at 8:11 pm to
quote:

Austin Bridge and Road is hardly shady - the biggest problem they had with I-10 to Highland is they loaded up on Obamas "shovel ready" projects and got caught thin. 


They also purposely low balled the shite out of that project and tried to change order the hell out of it. There was also the fact that they had no clue how to build on the soil there as opposed to what they were used to in Texas.
Posted by SG_Geaux
Beautiful St George, LA
Member since Aug 2004
80838 posts
Posted on 11/3/15 at 8:12 pm to
quote:

Did they ever finish the Tiger Bend to Coursey section?



They have barely made a dent in that project
Posted by fightin tigers
Downtown Prairieville
Member since Mar 2008
79881 posts
Posted on 11/3/15 at 8:13 pm to
quote:

They also purposely low balled the shite out of that project


I thought they "low balled" because they didn't propose replacing the railroad overpass
Posted by fightin tigers
Downtown Prairieville
Member since Mar 2008
79881 posts
Posted on 11/3/15 at 8:14 pm to
quote:

They have barely made a dent in that project




Not surprising, his belief is that it would get back burnered despite needing to be done more.

Thought it was a utilities nightmare, but had been 5+ years since we talked.
This post was edited on 11/3/15 at 8:34 pm
Posted by Redbone
between St. Amant and Port Vincent
Member since Sep 2012
20738 posts
Posted on 11/3/15 at 8:27 pm to
quote:

That's AP's solution to every road overcrowding issue-


Once again all you genius' out there, these road fixes are DOTD. Learn before you point fingers.
Posted by tduecen
Member since Nov 2006
161246 posts
Posted on 11/3/15 at 8:56 pm to
Original plan was 4 lames... damn Oak trees
Posted by Martini
Near Athens
Member since Mar 2005
49697 posts
Posted on 11/3/15 at 9:15 pm to
quote:

Once again all you genius' out there, these road fixes are DOTD. Learn before you point fingers.


So AP representatives to the state house have nothing to do with this?

Many and most state projects have plenty of input from individual parishes especially a road like hwy 73. As said above if AP wanted more lanes than the state would pay for they simply could have paid the difference and piggybacked it during construction. Which if you ask me would have been the thing to do. That road needed it ten years ago and if anyone thinks they will later just "add another lane" than they haven't been around Louisiana road construction long. That shite won't happen until Chickens grand kid is admin on the OT.
Posted by 4WHLN
Drinking at the Cottage Inn
Member since Mar 2013
7644 posts
Posted on 11/4/15 at 7:04 am to
quote:

With three years in the making, I was expecting four lanes.

Why would you assume the powers that be would have enough common since to plan for the future.
Posted by 4WHLN
Drinking at the Cottage Inn
Member since Mar 2013
7644 posts
Posted on 11/4/15 at 7:17 am to
quote:

They also purposely low balled the shite out of that project and tried to change order the hell out of it.

Typical Louisiana corruption was at play here as well. Austin Bridge knew they could change order the hell out of the project and get away with it due to the "connections" they had at the state level.
Posted by geauxscott
Member since Nov 2007
942 posts
Posted on 11/4/15 at 10:33 am to
quote:

Has the 42 project really been reduced to three lanes?


per the DOTD site, the plan is still 4 lanes on 42.

DOTD - HWY 42 PROJECT

quote:

The project will widen 3.7 miles of La. 42 from two to four lanes between U.S. 61 (Airline Highway) and La. 44 (North Burnside Avenue). In addition, a 6-foot sidewalk will be constructed on the north side of the roadway, and a 10-foot bicycle / pedestrian shared-use path will be constructed on the south side of the roadway.
Posted by trom83
Baton Rouge, LA
Member since Oct 2013
4724 posts
Posted on 11/4/15 at 10:35 am to
quote:

So I take it you're not bullish?
Posted by TigerstuckinMS
Member since Nov 2005
33687 posts
Posted on 11/4/15 at 10:39 am to
quote:

What would the I-12 example be? You know the one that was finished so early and done so well that saved so much money that they'll end up being able to 6-Lane all the way out to Satsuma? Instead of just past Juban like before?


A mistake they're studying intensely so they can ensure it doesn't happen again.
This post was edited on 11/4/15 at 10:44 am
first pageprev pagePage 3 of 4Next pagelast page

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on X, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookXInstagram