- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
re: HWY 73 construction finished in Prairieville - I am disappoint
Posted on 11/3/15 at 5:21 pm to mikelbr
Posted on 11/3/15 at 5:21 pm to mikelbr
quote:
I've been watching the private sector blow up on all the major arteries from Neighborhood Walmart to Leblanc's, strip malls, etc. and ONE road has been widened in this 4 yr span.
We've benne letting commercial and real estate developers running buck wild in this parish. And I'm tired of it. We're making the same mistakes BR made decades ago in its expansion by letting small town guys run things and we're going to get fricked up the arse here.
But there's a runoff election for parish president in Clint Cointment and Kenny Matassa. I'm voting for Clint as he's by far the better option as opposed to Matassa as he gets that traffic infrastructure and sewage development needs to happen before anything commercial and real estate goes. Matassa is just for the status quo.
This post was edited on 11/3/15 at 5:24 pm
Posted on 11/3/15 at 5:37 pm to Sentrius
Well they beat the construction on Napoleon on NOLA.
Pville got Barber Brother'd
Has the 42 project really been reduced to three lanes?
Pville got Barber Brother'd
Has the 42 project really been reduced to three lanes?
Posted on 11/3/15 at 6:38 pm to fightin tigers
Aren't there some new things coming to 73 also? I had someone tell me a new neighborhood was going up and like a target or something?
Posted on 11/3/15 at 6:49 pm to GeauxTime9
Well it's assfault so it will need to be redone in 10 years or less.
The bid for a concrete road easily lasting three times as long was less than a couple hundred thousand dollars above. Pathetic decision making.
The bid for a concrete road easily lasting three times as long was less than a couple hundred thousand dollars above. Pathetic decision making.
This post was edited on 11/3/15 at 6:51 pm
Posted on 11/3/15 at 7:21 pm to ThreeDayDrunk
I just moved from that area. I don't miss it.
Got hours of my life back a week not having to deal with that shut.
Got hours of my life back a week not having to deal with that shut.
Posted on 11/3/15 at 8:01 pm to mikelbr
quote:
The states bidding policy is to blame. Get better contractors by not going with shady low-bidders. I-10 Expansion from split to Highland is perfect example.
Public bid has nothing to do with it. Austin Bridge and Road is hardly shady - the biggest problem they had with I-10 to Highland is they loaded up on Obamas "shovel ready" projects and got caught thin.
And Ascension Parish can supplement the state contract if they prefer 4 lanes instead of 3- which dear god that road needed it. EBR supplemented Jefferson Hwy, Old Hammond Hwy and I believe Burbank. Or get better politicians in the state house.
That will prove to be a big mistake by not adding extra lanes during that time.
Posted on 11/3/15 at 8:06 pm to Martini
I think jones creek as well, but it has been years since I talked with the engineer for that project.
Did they ever finish the Tiger Bend to Coursey section?
Did they ever finish the Tiger Bend to Coursey section?
This post was edited on 11/3/15 at 8:07 pm
Posted on 11/3/15 at 8:11 pm to Martini
quote:
Austin Bridge and Road is hardly shady - the biggest problem they had with I-10 to Highland is they loaded up on Obamas "shovel ready" projects and got caught thin.
They also purposely low balled the shite out of that project and tried to change order the hell out of it. There was also the fact that they had no clue how to build on the soil there as opposed to what they were used to in Texas.
Posted on 11/3/15 at 8:12 pm to fightin tigers
quote:
Did they ever finish the Tiger Bend to Coursey section?
Posted on 11/3/15 at 8:13 pm to SG_Geaux
quote:
They also purposely low balled the shite out of that project
I thought they "low balled" because they didn't propose replacing the railroad overpass
Posted on 11/3/15 at 8:14 pm to SG_Geaux
quote:
They have barely made a dent in that project
Not surprising, his belief is that it would get back burnered despite needing to be done more.
Thought it was a utilities nightmare, but had been 5+ years since we talked.
This post was edited on 11/3/15 at 8:34 pm
Posted on 11/3/15 at 8:27 pm to Carville
quote:
That's AP's solution to every road overcrowding issue-
Once again all you genius' out there, these road fixes are DOTD. Learn before you point fingers.
Posted on 11/3/15 at 8:56 pm to LSUTANGERINE
Original plan was 4 lames... damn Oak trees
Posted on 11/3/15 at 9:15 pm to Redbone
quote:
Once again all you genius' out there, these road fixes are DOTD. Learn before you point fingers.
So AP representatives to the state house have nothing to do with this?
Many and most state projects have plenty of input from individual parishes especially a road like hwy 73. As said above if AP wanted more lanes than the state would pay for they simply could have paid the difference and piggybacked it during construction. Which if you ask me would have been the thing to do. That road needed it ten years ago and if anyone thinks they will later just "add another lane" than they haven't been around Louisiana road construction long. That shite won't happen until Chickens grand kid is admin on the OT.
Posted on 11/4/15 at 7:04 am to LSUTANGERINE
quote:
With three years in the making, I was expecting four lanes.
Why would you assume the powers that be would have enough common since to plan for the future.
Posted on 11/4/15 at 7:17 am to SG_Geaux
quote:
They also purposely low balled the shite out of that project and tried to change order the hell out of it.
Typical Louisiana corruption was at play here as well. Austin Bridge knew they could change order the hell out of the project and get away with it due to the "connections" they had at the state level.
Posted on 11/4/15 at 10:33 am to fightin tigers
quote:
Has the 42 project really been reduced to three lanes?
per the DOTD site, the plan is still 4 lanes on 42.
DOTD - HWY 42 PROJECT
quote:
The project will widen 3.7 miles of La. 42 from two to four lanes between U.S. 61 (Airline Highway) and La. 44 (North Burnside Avenue). In addition, a 6-foot sidewalk will be constructed on the north side of the roadway, and a 10-foot bicycle / pedestrian shared-use path will be constructed on the south side of the roadway.
Posted on 11/4/15 at 10:35 am to Rickety Cricket
quote:
So I take it you're not bullish?
Posted on 11/4/15 at 10:39 am to GFunk
quote:
What would the I-12 example be? You know the one that was finished so early and done so well that saved so much money that they'll end up being able to 6-Lane all the way out to Satsuma? Instead of just past Juban like before?
A mistake they're studying intensely so they can ensure it doesn't happen again.
This post was edited on 11/4/15 at 10:44 am
Popular
Back to top



1








