Started By
Message
locked post

Hard Rock demolition timeline now extends to Dec. 2020

Posted on 1/3/20 at 3:40 pm
Posted by Chad504boy
4 posts
Member since Feb 2005
179917 posts
Posted on 1/3/20 at 3:40 pm
Posted by gjackx
Red Stick
Member since Jan 2007
16587 posts
Posted on 1/3/20 at 3:41 pm to
Posted by Shadowlink
The Shadows
Member since Apr 2014
1437 posts
Posted on 1/3/20 at 3:42 pm to
What we Ghana do about it?
Posted by 4LSU2
Member since Dec 2009
38170 posts
Posted on 1/3/20 at 3:42 pm to
It will never be done in time.
Posted by Woobie
Member since Jan 2017
3366 posts
Posted on 1/3/20 at 3:42 pm to
nola

Posted by fightin tigers
Downtown Prairieville
Member since Mar 2008
79846 posts
Posted on 1/3/20 at 3:42 pm to
Is this McConnell's job?

Honestly don't know why he is so tied in.
Posted by Chad504boy
4 posts
Member since Feb 2005
179917 posts
Posted on 1/3/20 at 3:44 pm to
quote:

McConnell said the proposed process to install shores to stabilize the building was very labor intensive and involved assembling several hundred four-by-four scaffolds to connect all the way to the roof of the building. He stressed the it's the responsibility of Canal Development to demolish the building.

"They caused it, it’s their job to fix this thing," McConnell said. "It is their responsibility to do this, the plan they have submitted is the plan going forward and we have asked them to shorten it."


NOFD Chief wants them to short cut the demolition process.... golden
This post was edited on 1/3/20 at 3:55 pm
Posted by JS87
Member since Aug 2010
17753 posts
Posted on 1/3/20 at 3:45 pm to
quote:

Hard Rock demolition timeline now extends to Dec. 2020




WTF
Posted by Packer
IE, California
Member since May 2017
8699 posts
Posted on 1/3/20 at 3:45 pm to
Nice, I get to see this clusterfrick when I head down there next month
Posted by arseinclarse
Member since Apr 2007
35469 posts
Posted on 1/3/20 at 3:46 pm to
quote:

"The City has made it clear to the ownership that they are unhappy with the timeline," McConnell said in New Orleans City Hall Friday. "The mark was missed, it's more than doubled the timeline."


Posted by Zchlsu
Twin Peaks, Washington
Member since Jan 2011
7528 posts
Posted on 1/3/20 at 3:47 pm to
quote:

The bodies of two workers, 63-year-old Jose Ponce Arreola and 36-year-old Quinnyon Wimberly, are trapped inside and can not be recovered safely ahead of the planned demolition.


Damn, that is pretty terrible.
Posted by Shadowlink
The Shadows
Member since Apr 2014
1437 posts
Posted on 1/3/20 at 3:48 pm to
Let me look at the list of hurricane names that we may call on to do the job for us.


2020 Hurricane names

Arthur
Bertha
Cristobal
Dolly
Edouard
Fay
Gonzalo
Hanna
Isaias
Josephine
Kyle
Laura
Marco
Nana
Omar
Paulette
Rene
Sally
Teddy
Vicky
Wilfred
This post was edited on 1/3/20 at 3:55 pm
Posted by notiger1997
Metairie
Member since May 2009
61794 posts
Posted on 1/3/20 at 3:48 pm to
Has Endymion announced a route change yet?
This post was edited on 1/3/20 at 4:14 pm
Posted by Chad504boy
4 posts
Member since Feb 2005
179917 posts
Posted on 1/3/20 at 3:49 pm to
quote:

Let me look at the list of hurricane names that we may call on to do the job for us.


Big Bertha finna eat.
Posted by Mr Perfect
Member since Mar 2010
17836 posts
Posted on 1/3/20 at 3:49 pm to
quote:

 I get to see this clusterfrick when I head down there next month


neato. I see it everyday dude
Posted by jbgleason
Bailed out of BTR to God's Country
Member since Mar 2012
20405 posts
Posted on 1/3/20 at 3:51 pm to
Nola gonna Nola. Shithole. Blah, blah, blah.

But I have to honestly admit that this is fricked up. Even for New Orleans.
Posted by MsHoghunter
Member since Oct 2017
2405 posts
Posted on 1/3/20 at 3:52 pm to
quote:

Is this McConnell's job? Honestly don't know why he is so tied in


Someone needs to hold that fricker down and shave that rat nest growing under his nose
Posted by tgrbaitn08
Member since Dec 2007
148031 posts
Posted on 1/3/20 at 3:53 pm to
Checking in

Where’s all the Hard Rock defenders.

I tried telling y’all this was going to be a shitshow
Posted by Covingtontiger77
Member since Dec 2015
12268 posts
Posted on 1/3/20 at 3:53 pm to
quote:

Had Endymion announced a route change yet?



This.


Any guesses on the change to the route?

1) either have a dead zone for those blocks on Canal - no parade goers and then make the usual return on st Charles


2) turn right after Claiborne underpass and then left at Poydras ?


This is going to be interesting.
Posted by fightin tigers
Downtown Prairieville
Member since Mar 2008
79846 posts
Posted on 1/3/20 at 3:55 pm to
Right on Elk/Loyola then left on Poydras

Seems like a tight turn for that train onto St Charles off Poydras
This post was edited on 1/3/20 at 3:58 pm
first pageprev pagePage 1 of 3Next pagelast page

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on X, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookXInstagram