Started By
Message
locked post

SEZ Construction Update: 12-11

Posted on 12/12/13 at 11:45 am
Posted by WITNESS23
Member since Feb 2010
13720 posts
Posted on 12/12/13 at 11:45 am











LINK

The Southwest side will never be ready.
Posted by jcole4lsu
The Kwisatz Haderach
Member since Nov 2007
30922 posts
Posted on 12/12/13 at 11:55 am to
how are they going to line up the suites between the two sideline upper decks? one side has 2 levels the other side has 3.

never understood why they didnt make each side symmetrical, then again they had a fricking pvc pipe on the outside too.
Posted by Jwodie
New Orleans
Member since Sep 2009
7195 posts
Posted on 12/12/13 at 11:59 am to
That's odd that they leave out those seat backs like that.
Posted by PurpleAndGold86
Member since Jun 2012
11036 posts
Posted on 12/12/13 at 12:02 pm to
quote:


That's odd that they leave out those seat backs like that


I would assume given that there are a fair number of sections that are 100% empty they are in the process of taking them down. Find a pic of the stadium during the season. It won't look like that.
Posted by King of New Orleans
In front of The Hungry Tiger
Member since Jul 2011
9946 posts
Posted on 12/12/13 at 12:02 pm to
quote:

how are they going to line up the suites between the two sideline upper decks? one side has 2 levels the other side has 3.

never understood why they didnt make each side symmetrical,


I was fine until...

quote:

then again they had a fricking pvc pipe on the outside too.


then I completely lost it

quote:

jcole4lsu


Posted by Draconian Sanctions
Markey's bar
Member since Oct 2008
84831 posts
Posted on 12/12/13 at 12:03 pm to
quote:

how are they going to line up the suites between the two sideline upper decks? one side has 2 levels the other side has 3.

never understood why they didnt make each side symmetrical


the west side has 3 because of the press box.....
Posted by hg
Member since Jun 2009
123593 posts
Posted on 12/12/13 at 12:06 pm to
Posted by jcole4lsu
The Kwisatz Haderach
Member since Nov 2007
30922 posts
Posted on 12/12/13 at 12:07 pm to
quote:

the west side has 3 because of the press box.....

yeah i know. they should have included a 3rd level of suites on the east side so they could match this shite up. i swear they did ZERO master planning - just piecemeal this whole thing.
Posted by Golfer
Member since Nov 2005
75052 posts
Posted on 12/12/13 at 12:12 pm to
It'll look fine because the jumbotrons will be flanking either side of the club and the suites...

Bama has three levels on one side and two on the other.
Posted by jcole4lsu
The Kwisatz Haderach
Member since Nov 2007
30922 posts
Posted on 12/12/13 at 12:15 pm to
i thought the screens were going above the suites not adjacent to them
Posted by bbap
Baton Rouge, LA
Member since Feb 2006
96006 posts
Posted on 12/12/13 at 12:22 pm to
Who knows at this point but if you look at this picture it seems likely the suites will basically touch without a screen between them. So my guess is screen above.

Posted by IIxxBREADxxII
Baton Rouge
Member since Dec 2011
9735 posts
Posted on 12/12/13 at 12:22 pm to
:itshappening:
Posted by Golfer
Member since Nov 2005
75052 posts
Posted on 12/12/13 at 12:29 pm to
quote:

i thought the screens were going above the suites not adjacent to them



Yea, you're right.
Posted by Shane4689
Wrong Way on a No Way Road
Member since Dec 2010
3150 posts
Posted on 12/12/13 at 12:40 pm to
it will never be ready
Posted by WITNESS23
Member since Feb 2010
13720 posts
Posted on 12/12/13 at 12:45 pm to
quote:

i swear they did ZERO master planning - just piecemeal this whole thing.


I tend to agree..
Posted by WITNESS23
Member since Feb 2010
13720 posts
Posted on 12/12/13 at 12:45 pm to
The southeast side will never be ready.
Posted by bbap
Baton Rouge, LA
Member since Feb 2006
96006 posts
Posted on 12/12/13 at 12:47 pm to
The SE side is the more developed side
Posted by PsychTiger
Member since Jul 2004
98740 posts
Posted on 12/12/13 at 12:51 pm to
Chances of being ready in time = chance of rain in Tiger Stadium
Posted by TN River Tiger
Knoxville
Member since Apr 2008
338 posts
Posted on 12/12/13 at 12:56 pm to
This is great, then maybe the vacant seats on the west side behind the bench can be filled with real fans who decide to ATTEND the games. So frustrating to attend numerous games with the best seats in the stadium not filled. Hopefully, this will be the last upgrades to a stadium and TAF (i'm a member) can start sending funds for classroom and academic facilities upgrade! Hopefully, there will eventually be some way to block satelite feeds on campus at the time of kickoff, and people would leave their nice tvs and tailgates and go to the game. If ya don't have a ticket stay home and watch it at the house! One hr. to get off campus after a game is not acceptable! Geez!!! Merry Christmas,
Posted by Jim Rockford
Member since May 2011
98133 posts
Posted on 12/12/13 at 12:59 pm to
They'll need barbed wire to keep the SEZ peasants out of the suites.
first pageprev pagePage 1 of 2Next pagelast page

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram