Started By
Message

re: I-10 Widening Project on Hold Because Another Lane has Been Added to the Proposal

Posted on 1/30/23 at 9:27 pm to
Posted by Giantkiller
the internet.
Member since Sep 2007
20684 posts
Posted on 1/30/23 at 9:27 pm to
How to avoid this.

1. Buy a house close to your work.

Problem solved. The end.
Posted by saint tiger225
San Diego
Member since Jan 2011
37422 posts
Posted on 1/30/23 at 9:33 pm to
quote:

How to avoid this.

1. Move from BR
Posted by TimeOutdoors
AK
Member since Sep 2014
12129 posts
Posted on 1/30/23 at 9:35 pm to
Bike lane hopefully.
Posted by NPComb
Member since Jan 2019
27570 posts
Posted on 1/30/23 at 9:40 pm to
quote:

Another lane? Up to about 5 now.


the more the better
Posted by LSUneaux
NOLA
Member since Mar 2014
4505 posts
Posted on 1/30/23 at 10:12 pm to
How much can you realistically widen the road? What happens when the project is finished and the traffic is still shite? You need to remove vehicles from the area to see relief. Lanes only help a little. I’m referring to the area around Acadian. On the other hand, yes you can’t go down to 1 lane.
Posted by lostinbr
Baton Rouge, LA
Member since Oct 2017
9762 posts
Posted on 1/30/23 at 10:57 pm to
quote:

should have stuck to the plan imo. It’s already 1 lane EB and 2 lanes Wb.

While true, the real issue is that you’ll have EB and WB traffic sharing the current WB flyover (along with the rest of the WB side of the interstate between the bridge and Acadian). So it’s already going to back up going west simply because you have:
- Reduced lanes available from Acadian to the bridge.
- Lane shifts where things will have to slow down.
- Ongoing construction work, which also slows things down even if the lanes are clear.

When you reduce the number of lanes to the bridge on top of all of this, it just exacerbates everything else. Even with the added WB lane on the flyover, traffic still won’t flow anywhere near as well as it would without the construction / EB closure. But it should be better than only having one lane.

Personally, I just want the shite to get done. But I do think there are some folks who won’t be satisfied no matter what. There are people who will bitch that the project doesn’t do enough on one hand, while bitching that it is too much at one time on the other hand. There are people who will bitch about the WB approach being 1 lane if they don’t widen the flyover, but will bitch about the added cost/duration if the do widen it. There are people who will bitch about studies if they try to develop a 20 year plan, but will bitch about not having a plan if they don’t.

It’s a microcosm of Louisiana politics. DOTD has plenty of frickups under their belt but this damned if you do, damned if you don’t mentality has a lot to do with why shite doesn’t get done.
Posted by turnpiketiger
Southeast Texas
Member since May 2020
9694 posts
Posted on 1/30/23 at 11:32 pm to
quote:

20 threads a day shitting on LA politics.


It’s just such an easy target. It’s like making fun of Vandy for being trash at football.
first pageprev pagePage 2 of 2Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram