Page 1
Page 1
Started By
Message
locked post

Water Concrete Slab After Pouring?

Posted on 2/1/18 at 12:16 am
Posted by tenderfoot tigah
Red Stick
Member since Sep 2004
11566 posts
Posted on 2/1/18 at 12:16 am
Should I water my concrete slab after they pour it? If so, how often should I water it?

I live just outside of Baton Rouge.
Posted by BHM
Member since Jun 2012
4119 posts
Posted on 2/1/18 at 12:21 am to
Keep wet for a couple of days if possible.
Posted by stout
Porte du Lafitte
Member since Sep 2006
184635 posts
Posted on 2/1/18 at 12:24 am to
Concrete that is moist cured can be stronger and have less surface cracks. It wouldn't hurt to keep it wet for about a week.
This post was edited on 2/1/18 at 12:25 am
Posted by TigersSEC2010
Warren, Michigan
Member since Jan 2010
38535 posts
Posted on 2/1/18 at 12:36 am to
Definitely, baw. It won’t bloom without some H2O. Save the bees.
Posted by Obtuse1
Westside Bodymore Yo
Member since Sep 2016
31201 posts
Posted on 2/1/18 at 1:00 am to
Concrete will increase in hardness by water curing for up to 30 days. However, the biggest increases are in the first week. So either build berms and flood it or run a sprinkler. Most don't bother going longer than 7 days and if you are in a hurry you get about 75% of a 7 day cure in just 3 days. The full 7 day moist cure will increase the hardness by about 50%, well worth the effort and cost of the water.
Posted by tenderfoot tigah
Red Stick
Member since Sep 2004
11566 posts
Posted on 2/1/18 at 3:50 am to
How long until I can walk on it and start watering?
Posted by Tridentds
Sugar Land
Member since Aug 2011
24190 posts
Posted on 2/1/18 at 6:18 am to
Temp dependent but you should be okay to walk on it in 6-8 hours in tennis shoes with no issues whatsoever. No hard soles with heel.

You can do more damage with a hard stream of water. Use a little caution when putting the water to it.
Posted by jamiegla1
Member since Aug 2016
7986 posts
Posted on 2/1/18 at 6:21 am to
Absolutely. Concrete cures for decades after it’s been poured, constantly using moisture from the ground further the chemical reaction. This is why “green” concrete under older homes is hard as diamonds...many years of curing using ground moisture. The chemical reaction that takes place during curing releases heat, evaporating a good bit of the water away. Visqueen during the initial phase prevents the evaporated water from leaving the slab. There are probably some good guidelines on the web
Posted by jamiegla1
Member since Aug 2016
7986 posts
Posted on 2/1/18 at 6:25 am to
Also, I could be wrong but I think putting water on immediately after pouring can thin the top-most layer (“cream” I think they call it) and cause lots of surface cracking
Posted by BlackAdam
Member since Jan 2016
7274 posts
Posted on 2/1/18 at 7:00 am to
Not an expert, but doeant this depend on the concrete mix?
Posted by Agforlife
Somewhere in the Brazos Valley
Member since Nov 2012
20102 posts
Posted on 2/1/18 at 7:03 am to
Cover with cotton batt curing mats and water em down once a day. The longer you leave them on the better your top surface will be.
Posted by urinetrouble
Member since Oct 2007
20660 posts
Posted on 2/1/18 at 7:07 am to
You could alternatively spray on a curing compound. I wouldn't recommend it if is an interior slab that it is receiving floor finishes, as there could be compatibility issues.

If you water cure, keep it wet for 7 days as others have suggested.
Posted by kciDAtaE
Member since Apr 2017
17804 posts
Posted on 2/1/18 at 7:34 am to
I wouldn’t worry about it unless it’s very hot. This time of year, it would not be worth your time and could cause more harm if you set up sprinklers too early or if you have some bird baths in the slab
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on X, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookXInstagram