- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
re: Mobile beginning construction on new I10 bridge and Bayway
Posted on 6/5/18 at 10:01 pm to Prominentwon
Posted on 6/5/18 at 10:01 pm to Prominentwon
Prom, any idea when the work on 210 is scheduled to begin?
Posted on 6/5/18 at 10:04 pm to Traveler
Meanwhile, we have a rarely used fancy brand new bridge crossing the river via hwy10 in Pointe Coupee going into St Francisville. Hahaha
Posted on 6/5/18 at 10:05 pm to EarlyCuyler3
quote:this is the true. It's gonna be a long time before this is done
Don't worry, it won't be done for 20 years
Posted on 6/5/18 at 10:06 pm to Cosmo
Its never going to be ready in time!
Posted on 6/5/18 at 10:06 pm to Bama and Beer
quote:
this is the true. It's gonna be a long time before this is done
I-20 has been under construction between the state line with MS and Birmingham for like 15 years
Posted on 6/5/18 at 10:08 pm to jdani11
quote:
remove existing 4 lane bayway
I don’t understand removing the old stuff.
Posted on 6/5/18 at 10:13 pm to Cosmo
This is from November, any follow up news on if they picked a bidder?
This post was edited on 6/5/18 at 10:14 pm
Posted on 6/5/18 at 10:17 pm to Bob Sacamano
quote:
Alabama making Louisiana look bad with new bridges.
Watch them name the new bridge after Nick Saban just to frick with us some more
Posted on 6/5/18 at 10:20 pm to Pedro
Even in Mississippi, coming from Louisiana, I've been blown away by the pre-planning and construction before roads become major transportation issues. Always seemed like Louisiana was crawling to fix issues--and 20 years after the fact, at that.
Posted on 6/5/18 at 10:22 pm to Tiger Prawn
OP do you even read the damn article? First you post something from 2017 and then the article isn’t even about starting construction. We aren’t starting construction or even close to that. We can’t even get funding for the project right now. It will be at least 5-10 years before anything is started.
Posted on 6/5/18 at 10:23 pm to EarlyCuyler3
quote:
malfunction junction
My brother told me about this when we drove through there this past weekend on our way to Nashville. Will be really nice for that area once they finish it.
Posted on 6/5/18 at 10:25 pm to BayouBengals18
And when it's complete, we'll all be a decade older than now
Posted on 6/5/18 at 10:26 pm to UAinSOUTHAL
Wut? They were driving test piles last time i passed
Posted on 6/5/18 at 10:59 pm to Tiger Prawn
quote:
Watch them name the new bridge after Nick Saba
If I could place a bet, it would be named after Former Senator Jeff Sessions (sarcasm [on]) the best AG ever. (sarcasm [off]).
Posted on 6/5/18 at 11:03 pm to Cosmo
Wondering if they keep the tunnel viable for contingencies. Would make sense on the coast I would think
Posted on 6/6/18 at 7:38 am to Sao
quote:
Wondering if they keep the tunnel viable for contingencies.
Every source I have spoken to or read said the tunnel was remaining.
To the poster who said that funding had not been secured....I was under the impression that this was going to be a P3 project and that it had been secured with development underway. Is that not true?
Posted on 6/6/18 at 7:55 am to mdomingue
quote:
And Bama wins again
Yep, still no loop around BR.
Posted on 6/6/18 at 7:59 am to Cosmo
quote:
completed by 2030
Considering LA DoTD I think that's an optimistic date.
Posted on 6/6/18 at 8:03 am to Bard
This job is being done as P3 so it won't take forever. Investors won't allow it.
Posted on 6/6/18 at 8:08 am to UAinSOUTHAL
quote:
We can’t even get funding for the project right now.
Shelby chairs Senate Appropriations. Federal funding is in place. Turning basin is next mission. State funding, not sure, but it looks like a toll via private/public JV. Bankhead Tunnel and Cochran Bridge are the "free routes". Finish date projection is <5 years after award. Since it's a toll every day not open is losing money, therefore you can make LD's stick. GWT will possibly be abandoned. Maintenance costs. Won't need them. There's a steady leak in the west tube.
This post was edited on 6/6/18 at 8:30 am
Popular
Back to top



1










