- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Coaching Changes
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
re: South Endzone Construction Update 12/18
Posted on 12/18/13 at 2:47 pm to BayouRat15
Posted on 12/18/13 at 2:47 pm to BayouRat15
quote:
Additional stands will be errected above the block figures
I've been hearing about a possible berm.
Posted on 12/18/13 at 2:53 pm to BayouRat15
quote:
Additional stands will be errected above the block figures
Visiting section temporary bleachers.
Posted on 12/18/13 at 2:55 pm to Lee Chatelain
He's gone to great lengths to prove otherwise.
Posted on 12/18/13 at 3:06 pm to Grit-Eating Shin
quote:
He's gone to great lengths to prove otherwise.
T posted legit info about the retarded looking upper deck that looks like a 6 year old designed and because he didn't sit on the board or sit in the room with the real engineers he gets bashed.
That's kind of sad in my opinion.
Posted on 12/18/13 at 3:36 pm to Lee Chatelain
quote:
T posted legit info
Where has anyone proved this to be legit?
I'll wait.
Posted on 12/18/13 at 3:37 pm to Lee Chatelain
No. He got bashed because he either made-up or spread a ridiculous rumor about highly-paid design professionals 'forgetting' to add bathrooms to the stadium expansion. Nothing 'legit' about it.
Posted on 12/18/13 at 3:42 pm to Grit-Eating Shin
quote:
No. He got bashed because he either made-up or spread a ridiculous rumor about highly-paid design professionals 'forgetting' to add bathrooms to the stadium expansion. Nothing 'legit' about it.
It really does look like complete shite, though.
I would argue, assuming it was some sort of afterthought is giving them more the benefit of the doubt more so than assuming they actually designed the thing to look like that.
Posted on 12/18/13 at 3:49 pm to Y.A. Tittle
Again, my scope of work on the project had little to do with the actual building itself, so I can't attest to why it looks the way it does. But I doubt there was every any chance that it would satisfy everyone on The Rant. Just know that the south side of the stadium is an extremely difficult place to put any sizeable structure, so I'm sure some comprimises had to be made regarding what may have been desired.
Posted on 12/18/13 at 6:09 pm to HowboutthemTigers
The second taller structure closer to the east upper deck is probably the huge glass structure that is likely sitting outside of the stadium. That's why it appears higher than the others than are actually sitting in the stadium. That's what I assume anyway.
Posted on 12/18/13 at 7:16 pm to HowboutthemTigers
No way that the capacity after expansion is not over 100k.
Posted on 12/18/13 at 7:29 pm to T
quote:
they forgot to include concession stands and bathrooms in the original plan so they had to make them separate structures on the top level. those are the boxes you see sticking up. this may actually top the pvc pipe mistake. pretty amazing that they did this.
Link?
This post was edited on 12/18/13 at 7:30 pm
Posted on 12/18/13 at 7:29 pm to BayouRat15
They are not saying 100,000 or more for Capacity and not saying how much more!
Posted on 12/18/13 at 7:30 pm to BayouRat15
quote:
South Endzone Construction Update 12/18
Additional stands will be errected above the block figure
I believe a future expansion of the sez upper deck, to match the height of the e/w uppers, will eventually cover the exposed housing of the restrooms/ concessions.
This post was edited on 12/18/13 at 7:51 pm
Posted on 12/18/13 at 10:31 pm to Prowler888
quote:
I believe a future expansion of the sez upper deck, to match the height of the e/w uppers, will eventually cover the exposed housing of the restrooms/ concessions.
I doubt it
Posted on 12/18/13 at 10:53 pm to Grit-Eating Shin
quote:
Just know that the south side of the stadium is an extremely difficult place to put any sizeable structure, so I'm sure some comprimises had to be made regarding what may have been desired.
Everyone knows ran-tards could design it better. Duh.
Posted on 1/7/14 at 1:11 pm to heartbreakTiger
The southeastern portion of the expansion (the part that juts out) has an all glass exterior huh? Because i see they have started putting up some kind of facade.
Posted on 1/7/14 at 2:23 pm to Grit-Eating Shin
G-ES, as an engineer (though not involved in any way this) it is astounding the idiotic statements made about construction by some on here! That a design team would inadvertantly forget bathrooms and the like is the most ridiculas thing have seen here, knowing that these plans go through a screen/check process by several agencies and contractors prior to approval to bid letting including Fire marshall. The laymen on here have no idea what the constraints were as with most projects that we deal with where so many factors can come into play (right of way, electrical and mechanical codes, width/heigth restrictions to name a few) unless you are in the nuts and bolts of it is ludacris to even comment on!
That said, the infamous PVC pipe is pretty bad design.
That said, the infamous PVC pipe is pretty bad design.
Popular
Back to top


1








