Started By
Message

re: How long would it take to build a new basketball arena?

Posted on 1/10/22 at 5:18 pm to
Posted by Klingler7
Houston
Member since Nov 2009
12381 posts
Posted on 1/10/22 at 5:18 pm to
Play the home games at Southern University. Just watch where you park.
Posted by YeauxTigers
Sugar Land, TX
Member since Dec 2007
997 posts
Posted on 1/10/22 at 5:20 pm to
I like this idea. Could play in the current PMAC until the new "General Palace" is ready. Then we could come up with some cool Football gameday plans for the existing PMAC area when it is gone.
Posted by geauxtigers33
Baton Rouge
Member since Jan 2014
13734 posts
Posted on 1/10/22 at 5:24 pm to
The parish/city should build an arena and have LSU rent it out like Kentucky does. That way they can kill two birds with one stone. The athletic department gets a new arena and they can say they are doing a good thing by paying the local government money.
Posted by T
Member since Jan 2004
9889 posts
Posted on 1/10/22 at 5:34 pm to
quote:

The new arena has to be rectangular shaped. So if you can’t renovate the current PMAC to that it’s pointless


Wrong.
Ga Tech arena is a good example of what could be done to the PMAC. The PMAC is much bigger though so more could be done. The group LSU hired did this work.





LINK
Page 1 2 3 4 5 6
Jump to page
first pageprev pagePage 6 of 6Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on X, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookXInstagram