Started By
Message

re: False River Draw Down

Posted on 2/11/20 at 9:05 am to
Posted by friday1728
Member since May 2014
43 posts
Posted on 2/11/20 at 9:05 am to
They dredged at the north end until they ran out of storage area for the dredge material. They still had some money on the contract so they moved everything to the south end to clear out some material outside of Bayou Chenal and pumped it on top of the island to fill in where the other material had settled from the previous dredging on the south end.
Posted by tigerinthebueche
Member since Oct 2010
36791 posts
Posted on 2/11/20 at 9:08 am to
quote:

They dredged at the north end until they ran out of storage area for the dredge material. They still had some money on the contract so they moved everything to the south end to clear out some material outside of Bayou Chenal and pumped it on top of the island to fill in where the other material had settled from the previous dredging on the south end.



gotcha, thanks. I wondered where they were pumping the material down on the south end.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram