Started By
Message

re: I-10 Widening Project on Hold Because Another Lane has Been Added to the Proposal

Posted on 1/30/23 at 8:41 pm to
Posted by upgrayedd
Lifting at Tobin's house
Member since Mar 2013
134887 posts
Posted on 1/30/23 at 8:41 pm to
quote:

Let’s just agree to rip the bandaid off instead of a slow pull. I’m actually okay with some forward thinking.


The problem is that this is a slow pull disguised as a quick rip.

We set the bar so low for these massive projects that we always get exactly what we expect.
Posted by lostinbr
Baton Rouge, LA
Member since Oct 2017
9557 posts
Posted on 1/30/23 at 8:52 pm to
quote:

We set the bar so low for these massive projects that we always get exactly what we expect.

I mean to be fair, people have complained about the plan to reduce the bridge approach to 1 lane since it was announced. This is pretty clearly a direct response to that criticism from the public - a way to keep it at 2 lanes going to the bridge.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram