- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Coaching Changes
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
Robert-to-Bogalusa Power Line Project
Posted on 11/2/26 at 6:05 pm
Posted on 11/2/26 at 6:05 pm
Looking south. St. Tammany on the left, Tangipahoa on the right.
Looking north. Tangipahoa on the left, St. Tammany on the right.
Big pines going to waste.
This post was edited on 11/2/26 at 6:10 pm
Posted on 11/2/26 at 6:08 pm to Tchefuncte Tiger
I assure you if there was a single red nickel to be made, Wayerhauser would be all over that.
Posted on 11/2/26 at 7:00 pm to Tchefuncte Tiger
I have been trying to find a map of where the lines actually run do you have that?
Posted on 11/2/26 at 7:02 pm to GREENHEAD22
I am assuming this is the pull power from the solar farm they are putting west of bogalusa?
Posted on 11/2/26 at 7:06 pm to Tchefuncte Tiger
How else do you think electricity gets transmitted from the source you your light switch?
Posted on 11/2/26 at 7:08 pm to tenfoe
quote:
How else do you think electricity gets transmitted from the source you your light switch?
Am I complaining?
Posted on 11/2/26 at 7:09 pm to Tchefuncte Tiger
quote:
The project, known as the Adams Creek-Robert 230kV Project, calls for construction of a new 41-mile transmission line from the Adams Creek Substation north of Bogalusa to the Robert Substation, along with upgrades at several substations in Tangipahoa, St. Tammany and Washington parishes.
News link
Posted on 11/2/26 at 7:18 pm to GREENHEAD22
quote:
I have been trying to find a map of where the lines actually run do you have that?
I'll see if I can find one.
This post was edited on 11/2/26 at 7:22 pm
Posted on 11/2/26 at 8:40 pm to tenfoe
I get that but this is all being done for future projects that are not being disclosed. STT and the Northshore in general has staved off most heavy extraction based, or value degrading developments due to old money and just greater affluence in general in the area.
I am not sure what has/is changing but that is about to come to an end.
There are a lot of "ugly" projects about to be proposed and push through across STT, Tangi, Washington.
I hindsight we probably should have let the large corps build out the campuses that have been proposed over the past 20 years instead of some of the industrial projects that are about to pop up.
I am not sure what has/is changing but that is about to come to an end.
There are a lot of "ugly" projects about to be proposed and push through across STT, Tangi, Washington.
I hindsight we probably should have let the large corps build out the campuses that have been proposed over the past 20 years instead of some of the industrial projects that are about to pop up.
Posted on 11/3/26 at 5:44 am to Tchefuncte Tiger
All I can think about is all the deer that will be harvested off that right of way. Let’s hunt!
Posted on 11/3/26 at 1:40 pm to Koolazzkat
quote:
All I can think about is all the deer that will be harvested off that right of way. Let’s hunt!
Box stands every 400 yards for 41 miles
Posted on 11/3/26 at 4:07 pm to lowhound
Hell yeah! We’re eatin backstrap fosho!
Posted on 11/5/26 at 8:41 pm to lowhound
quote:
Box stands every 400 yards for 41 miles
My nephew's already working on it.
Posted on 11/5/26 at 8:44 pm to GREENHEAD22
quote:
Greenhead22
I'm going to be over there in the next day or two (most likely tomorrow). Let me know if you want me to show you around.

Popular
Back to top
5