- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message

Westinghouse declares bankruptcy; what does this mean for nuclear power in the US?
Posted on 3/29/17 at 9:43 am
Posted on 3/29/17 at 9:43 am
LINK
The construction of the SC reactors is so over-budget and behind schedule that I wonder if they'll ever be complete. Construction started in 2013, and I think that they now hope to have the two units online in 2020. Electric prices have gone up ~20% in the past 7 years to help pay for this BS.
quote:
Westinghouse, one of the most storied names in the nuclear energy business, filed for bankruptcy on Wednesday, dealing a blow to the future of the nuclear power industry and leaving question marks about the future of four reactors currently under construction in the United States.
The filing also brings to an end the marriage of Westinghouse and Toshiba. When the Japanese giant - maker of everything from medical devices to home appliances - bought the Westinghouse nuclear business in October 2006, it declared “the dawn of a new era for nuclear energy.” Together the companies would make a “powerful combination,” Toshiba said.
quote:
The collapse of Westinghouse also reverberates through the global nuclear business. Westinghouse supplied the world’s first commercial pressurized water reactor 60 years ago and half the world’s 430 nuclear power reactors have Westinghouse technology.
Moreover, Westinghouse had claimed that its new AP1000 model reactor had passive technology and modular design that was safer, cheaper and faster to build. Many U.S. lawmakers and nuclear industry officials say the AP1000 could augur in a “nuclear renaissance” in the United States.
Westinghouse is currently in charge of construction of four of these new model reactors at two different sites. The first two are being built by SCANA at the Virgil C. Summer Nuclear Generating Station, a site about 20 miles northwest of Columbia, S.C. The other two, backed by Energy Department loan guarantees, are being built at the site of Southern Co.’s existing Vogtle facility.
Yet Westinghouse ran into trouble on both sites. Though the AP1000 was supposed to be a standard design, changes were made in South Carolina. Moreover, Westinghouse plans included modules built in Lake Charles, La. that were supposed to fit together “like pieces of Lego,” said a former regulator. But Nuclear Regulatory Commission files say that the Lake Charles plant was shipping faulty modules, forcing Westinghouse to reweld them at the reactor sites. An entire extra building was erected to do the welding because there was so much of it, according to one person familiar with the construction.
Angry over the delays and cost overruns, the owners of the nuclear plants filed claims against Westinghouse. A settlement was reached, but now the legal battles will begin again.
The construction of the SC reactors is so over-budget and behind schedule that I wonder if they'll ever be complete. Construction started in 2013, and I think that they now hope to have the two units online in 2020. Electric prices have gone up ~20% in the past 7 years to help pay for this BS.
This post was edited on 3/29/17 at 9:47 am
Posted on 3/29/17 at 9:44 am to GetCocky11
Maybe they'll stop billing me for CD's I ordered in the 90's finally.
Posted on 3/29/17 at 9:45 am to GetCocky11
Isn't there some suspicion that Shaw was involved in some frickery when they sold their Westinghouse stake to Toshiba?
Posted on 3/29/17 at 9:53 am to GetCocky11
quote:
what does this mean for nuclear power in the US?
Kind of confusing when Entergy is building another plant in Montz, and I hear they are looking to build one in Lake Charles/Westlake
Posted on 3/29/17 at 9:55 am to LSUweights
Did they ever convert that plant to run on pet coke? I remember they were in the process then they just stopped.
Posted on 3/29/17 at 9:57 am to LSUweights
quote:
Kind of confusing when Entergy is building another plant in Montz, and I hear they are looking to build one in Lake Charles/Westlake
How many Westinghouse components will they be using?
I'm genuinely curious to hear from anybody on the board who knows something about the subject.
Posted on 3/29/17 at 9:58 am to GetCocky11
I have a friend on the nuke side I will try to get some info
Posted on 3/29/17 at 9:59 am to upgrayedd
quote:
Did they ever convert that plant to run on pet coke?
I have no idea
I hadn't heard anything new
I keep a close ear to the ground on Entergy
I have been trying to get on at one of plants for the last 5 months
quote:
How many Westinghouse components will they be using?
Again, no clue
I made some contacts from the plants in St.Francisville and Killona in the last few months.
They are trying to help me get on board
This post was edited on 3/29/17 at 10:02 am
Posted on 3/29/17 at 10:04 am to GetCocky11
General Electric builds reactors and components as well. I think all of the reactors on submarines were built by GE except for the Seawolf class which were Westinghouse.
Looks like GE just got some more business.
Looks like GE just got some more business.
This post was edited on 3/29/17 at 10:05 am
Posted on 3/29/17 at 10:06 am to LSUweights
quote:
I hear they are looking to build one in Lake Charles/Westlake
Interesting. First I've heard of this. I have been wondering what the projected EoL is for the Nelson coal plant.
Posted on 3/29/17 at 10:07 am to terd ferguson
quote:
Looks like GE just got some more business.
Even after all these years, the spirit of Thomas Edison vs. George Westinghouse lives on.
Posted on 3/29/17 at 10:07 am to GetCocky11
I also find it odd that they picked the one place on the eastern seaboard with the highest likelihood of seismic activity to build a nuke plant.
Posted on 3/29/17 at 10:10 am to colorchangintiger
Filing bankruptcy does not mean they dont exist or finish work. Means they get some time and protection from the suit.
Posted on 3/29/17 at 10:13 am to LSUweights
quote:
nd I hear they are looking to build one in Lake Charles/Westlake
Probably will be another gas unit considering how abundant it is in SWLA now.
Posted on 3/29/17 at 10:15 am to GetCocky11
The NRC has the nuke industry so highly regulated that what's started will get finished. It might not be Westinghouse who completes the work, but it'll get done. Areva and GE will pick up the slack.
Posted on 3/29/17 at 10:16 am to GetCocky11
The Japs are a smart bunch. Crumble our capabilities by buying our resources.
Posted on 3/29/17 at 10:18 am to stout
quote:
Probably will be another gas unit considering how abundant it is in SWLA now.
That sounds right
I didn't hear any specifics that the new plants were going to be nuclear
Posted on 3/29/17 at 10:25 am to GetCocky11
It means they should stop using designs from almost 70 years ago and innovate. There are far safer systems of nuclear energy that have arrived on the scene that no one wants to touch because it involves the word "nuclear".
It'd be like asking the wright brothers to start carrying people across the Atlantic on a biplane, then telling people flying is too dangerous because a biplane can't do it safely.
It'd be like asking the wright brothers to start carrying people across the Atlantic on a biplane, then telling people flying is too dangerous because a biplane can't do it safely.
Posted on 3/29/17 at 10:29 am to NYNolaguy1
Designs haven't changed since the inception of nuclear power?
Posted on 3/29/17 at 10:37 am to upgrayedd
quote:
Designs haven't changed since the inception of nuclear power?
Nuclear power, no. The basic design hasn't changed since the 60's.
This post was edited on 3/29/17 at 10:49 am
Popular
Back to top


9











