off/on ramp construction on I10 near Pecue

Posted on 1/4/24 at 1:37 pm
Posted by BilbeauTBaggins
probably stuck in traffic
Member since May 2021
4320 posts
Posted on 1/4/24 at 1:37 pm
Didn't realize there was constriction going on around there but it looks like the land is cleared and close to being ready for paving. I'm guessing this will connect at Pecue? Also is this part of the I10 expansion project or something completely separate? Looks like this could be done in a relatively short amount of time.
Posted by frequent flyer
USA
Member since Jul 2021
2981 posts
Posted on 1/4/24 at 1:39 pm to
They are adding a modified divergent diamond interchange at Pecue.

quote:

Looks like this could be done in a relatively short amount of time.





Nothing DOTD touches it built in a short amount of time. They've been trying to add in HOV lanes on I-12 for 2 years now, and all it needs is paint and signage.

This is sort of what they are building at Pecue BTW, except it's an overpass instead of an underpass. Traffic on Pecue will switch sides briefly so traffic turning onto I-10 doesn't stop opposing traffic by having an arrow.



They are also going to widen Pecue and add a connection to Siegen Lane by extending Rieger Road. Should be done in 30 years.
This post was edited on 1/4/24 at 1:46 pm
Posted by AscensionTiger
Prairieville, LA
Member since Jun 2004
3686 posts
Posted on 1/4/24 at 1:40 pm to
They have been working on this for a long time now.
Posted by Bottom9
Arsenal Til I Die
Member since Jul 2010
21696 posts
Posted on 1/4/24 at 1:41 pm to
quote:

Didn't realize there was constriction going on around there


No, I actually think it's expansion
Posted by Shexter
Prairieville
Member since Feb 2014
13855 posts
Posted on 1/4/24 at 1:56 pm to


Connecting to Rieger Road near Mockler Beverage also.



EDIT: I found this photo on Google image search. Is this a possible connection to backside of Topgolf complex too?


This post was edited on 1/4/24 at 2:41 pm
Posted by frequent flyer
USA
Member since Jul 2021
2981 posts
Posted on 1/4/24 at 1:58 pm to
quote:

Possibly connection to backside of Topgolf complex too



Wait they are doing that? That's a good idea.
Posted by TheFlyingDrogbas
Baton Rouge
Member since Jul 2010
302 posts
Posted on 1/4/24 at 1:58 pm to
They are in the third and final phase now. It includes widening of Pecue and adding the on and off ramps. They are doing the majority of the current work on Pecue, especially at the bridge over Ward Creek. They also have to do major work at the train crossing on Pecue. The projection is for an early 2026 completion.
Posted by Ping Pong
LSU and UVA alum
Member since Aug 2014
5346 posts
Posted on 1/4/24 at 2:00 pm to
quote:

This is sort of what they are building at Pecue


Its called a Diverging diamond interchange, and its one of the most efficient and safest interchange designs. However, I'm sure Baton Rouge drivers will find a way to screw it up.

Posted by goofball
Member since Mar 2015
16856 posts
Posted on 1/4/24 at 2:04 pm to
quote:

Possibly connection to backside of Topgolf complex too




That's going to be a huge help. When is that happening?
Posted by PhiTiger1764
Lurker since Aug 2003
Member since Oct 2009
13848 posts
Posted on 1/4/24 at 2:20 pm to
quote:

Possibly connection to backside of Topgolf complex too

First I have heard of this.

Unless it is connecting directly to the exit ramp with one way access to Pecue, it’s not happening.
Posted by jaTigerfan
Nashville
Member since Oct 2011
2091 posts
Posted on 1/4/24 at 2:26 pm to
quote:

Looks like this could be done in a relatively short amount of time.


They've been working on this since 2018
Posted by Snipe
Member since Nov 2015
10898 posts
Posted on 1/4/24 at 2:34 pm to
quote:

Looks like this could be done in a relatively short amount of time.


Define "short amount of time"

iirc they've been working on this for 3 years at least.
Posted by Wiseguy
Member since Mar 2020
3381 posts
Posted on 1/4/24 at 2:51 pm to
They need to do something at Pecue/Highland as well. It’s going to be a shitshow with people exiting off I10. I know there are mixed feelings about them but a roundabout is probably the best solution there.
Posted by SantaFe
Baton Rouge
Member since Apr 2019
6529 posts
Posted on 1/4/24 at 2:55 pm to
I was there for the groundbreaking, summer of 2019.
Posted by SantaFe
Baton Rouge
Member since Apr 2019
6529 posts
Posted on 1/4/24 at 2:58 pm to
quote:

They need to do something at Pecue/Highland as well. It’s going to be a shitshow with people exiting off I10. I know there are mixed feelings about them but a roundabout is probably the best solution there.


Highland was made a Historic highway some time back during the 1980s, it is protected and thus cannot be changed. The intersection of Highland with Pecue has some deep pockets living there and they would probably fight a roundabout.
Posted by Amadeo
Member since Jan 2004
4810 posts
Posted on 1/4/24 at 3:06 pm to
So they are just preparing for when The MoL finally becomes the "black people's mall"?
Posted by lowhound
Effie
Member since Aug 2014
7515 posts
Posted on 1/4/24 at 3:34 pm to
quote:

Nothing DOTD touches it built in a short amount of time.


Pretty sure that's being built by EBR city/parish and not DOTD. I'm sure they slow played it anyway not knowing the outcome of the St. George litigation. It's being paved by one of the MoveBR type property taxes, so they may have just built some as they got money and had to drag it out.
This post was edited on 1/4/24 at 3:38 pm
Posted by goofball
Member since Mar 2015
16856 posts
Posted on 1/4/24 at 3:39 pm to
quote:

iirc they've been working on this for 3 years at least.



There are articles in The Advocate citing design delays causing issues with breaking ground from 2018.
Posted by PhiTiger1764
Lurker since Aug 2003
Member since Oct 2009
13848 posts
Posted on 1/4/24 at 4:04 pm to
quote:

The intersection of Highland with Pecue has some deep pockets living there and they would probably fight a roundabout.

Well they better get to fighting because a roundabout is being designed in the MOVEBR program.
Posted by Areddishfish
The Wild West
Member since Oct 2015
6277 posts
Posted on 1/4/24 at 5:17 pm to
quote:

They have been working on this for a long time now.


We moved 2 years ago and they still aren't done? lol
first pageprev pagePage 1 of 2Next pagelast page

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram