- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
off/on ramp construction on I10 near Pecue
Posted on 1/4/24 at 1:37 pm
Posted on 1/4/24 at 1:37 pm
Didn't realize there was constriction going on around there but it looks like the land is cleared and close to being ready for paving. I'm guessing this will connect at Pecue? Also is this part of the I10 expansion project or something completely separate? Looks like this could be done in a relatively short amount of time.
Posted on 1/4/24 at 1:39 pm to BilbeauTBaggins
They are adding a modified divergent diamond interchange at Pecue.
Nothing DOTD touches it built in a short amount of time. They've been trying to add in HOV lanes on I-12 for 2 years now, and all it needs is paint and signage.
This is sort of what they are building at Pecue BTW, except it's an overpass instead of an underpass. Traffic on Pecue will switch sides briefly so traffic turning onto I-10 doesn't stop opposing traffic by having an arrow.
They are also going to widen Pecue and add a connection to Siegen Lane by extending Rieger Road. Should be done in 30 years.
quote:
Looks like this could be done in a relatively short amount of time.
Nothing DOTD touches it built in a short amount of time. They've been trying to add in HOV lanes on I-12 for 2 years now, and all it needs is paint and signage.
This is sort of what they are building at Pecue BTW, except it's an overpass instead of an underpass. Traffic on Pecue will switch sides briefly so traffic turning onto I-10 doesn't stop opposing traffic by having an arrow.
They are also going to widen Pecue and add a connection to Siegen Lane by extending Rieger Road. Should be done in 30 years.
This post was edited on 1/4/24 at 1:46 pm
Posted on 1/4/24 at 1:40 pm to BilbeauTBaggins
They have been working on this for a long time now.
Posted on 1/4/24 at 1:41 pm to BilbeauTBaggins
quote:
Didn't realize there was constriction going on around there
No, I actually think it's expansion
Posted on 1/4/24 at 1:56 pm to BilbeauTBaggins
Connecting to Rieger Road near Mockler Beverage also.
EDIT: I found this photo on Google image search. Is this a possible connection to backside of Topgolf complex too?
This post was edited on 1/4/24 at 2:41 pm
Posted on 1/4/24 at 1:58 pm to Shexter
quote:
Possibly connection to backside of Topgolf complex too
Wait they are doing that? That's a good idea.
Posted on 1/4/24 at 1:58 pm to Bottom9
They are in the third and final phase now. It includes widening of Pecue and adding the on and off ramps. They are doing the majority of the current work on Pecue, especially at the bridge over Ward Creek. They also have to do major work at the train crossing on Pecue. The projection is for an early 2026 completion.
Posted on 1/4/24 at 2:00 pm to frequent flyer
quote:
This is sort of what they are building at Pecue
Its called a Diverging diamond interchange, and its one of the most efficient and safest interchange designs. However, I'm sure Baton Rouge drivers will find a way to screw it up.
Posted on 1/4/24 at 2:04 pm to Shexter
quote:
Possibly connection to backside of Topgolf complex too
That's going to be a huge help. When is that happening?
Posted on 1/4/24 at 2:20 pm to Shexter
quote:
Possibly connection to backside of Topgolf complex too
First I have heard of this.
Unless it is connecting directly to the exit ramp with one way access to Pecue, it’s not happening.
Posted on 1/4/24 at 2:26 pm to BilbeauTBaggins
quote:
Looks like this could be done in a relatively short amount of time.
They've been working on this since 2018
Posted on 1/4/24 at 2:34 pm to BilbeauTBaggins
quote:
Looks like this could be done in a relatively short amount of time.
Define "short amount of time"
iirc they've been working on this for 3 years at least.
Posted on 1/4/24 at 2:51 pm to Shexter
They need to do something at Pecue/Highland as well. It’s going to be a shitshow with people exiting off I10. I know there are mixed feelings about them but a roundabout is probably the best solution there.
Posted on 1/4/24 at 2:55 pm to BilbeauTBaggins
I was there for the groundbreaking, summer of 2019.
Posted on 1/4/24 at 2:58 pm to Wiseguy
quote:
They need to do something at Pecue/Highland as well. It’s going to be a shitshow with people exiting off I10. I know there are mixed feelings about them but a roundabout is probably the best solution there.
Highland was made a Historic highway some time back during the 1980s, it is protected and thus cannot be changed. The intersection of Highland with Pecue has some deep pockets living there and they would probably fight a roundabout.
Posted on 1/4/24 at 3:06 pm to BilbeauTBaggins
So they are just preparing for when The MoL finally becomes the "black people's mall"?
Posted on 1/4/24 at 3:34 pm to frequent flyer
quote:
Nothing DOTD touches it built in a short amount of time.
Pretty sure that's being built by EBR city/parish and not DOTD. I'm sure they slow played it anyway not knowing the outcome of the St. George litigation. It's being paved by one of the MoveBR type property taxes, so they may have just built some as they got money and had to drag it out.
This post was edited on 1/4/24 at 3:38 pm
Posted on 1/4/24 at 3:39 pm to Snipe
quote:
iirc they've been working on this for 3 years at least.
There are articles in The Advocate citing design delays causing issues with breaking ground from 2018.
Posted on 1/4/24 at 4:04 pm to SantaFe
quote:
The intersection of Highland with Pecue has some deep pockets living there and they would probably fight a roundabout.
Well they better get to fighting because a roundabout is being designed in the MOVEBR program.
Posted on 1/4/24 at 5:17 pm to AscensionTiger
quote:
They have been working on this for a long time now.
We moved 2 years ago and they still aren't done? lol