Started By
Message

re: New Mississippi River Bridge expected to open in 2033

Posted on 4/7/25 at 5:58 am to
Posted by Tarps99
Lafourche Parish
Member since Apr 2017
9762 posts
Posted on 4/7/25 at 5:58 am to
quote:

Definitely needs to be 4 laned with a turn lane down the middle


Those can become a death trap if development crowds the road and you keep a 50-60 MPH speed limit. See MLK in Houma.
Posted by PureBlood
The Motherland
Member since Oct 2021
4820 posts
Posted on 4/7/25 at 6:19 am to
IT's taken them 4 years to add off ramps to Pecue.... the fact that they think they can pull off a bridge in 8 years is hysterical
Posted by doubleb
Baton Rouge
Member since Aug 2006
40030 posts
Posted on 4/7/25 at 9:02 am to
quote:

IT's taken them 4 years to add off ramps to Pecue.... the fact that they think they can pull off a bridge in 8 years is hysterical


But they had to build two bridges over Wards Creek!
Posted by doubleb
Baton Rouge
Member since Aug 2006
40030 posts
Posted on 4/7/25 at 9:05 am to
quote:

Best thing the state could do is to 4 lane Gardere Lane.


Instead of that they are doing it right. The plan is to extend Staring Lane behind Traction and along the sewer plant and into Gardere and on to 30 there at the Exxon.

We approved that in the MovEBR road plan.
Posted by 3deadtrolls
lafayette
Member since Jan 2014
6333 posts
Posted on 4/7/25 at 10:10 am to
quote:

New Mississippi River Bridge expected to open in 2133


FTFY
Posted by jizzle6609
Houston
Member since Jul 2009
14215 posts
Posted on 4/7/25 at 10:12 am to
Mississippi continues good things.
Posted by Btrtigerfan
Disgruntled employee
Member since Dec 2007
22654 posts
Posted on 4/8/25 at 6:33 pm to
first pageprev pagePage 5 of 5Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on X, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookXInstagram