I-10 expansion - Construction Hell starts in Baton Rouge in March

Posted on 2/3/21 at 3:48 pm
Posted by goofball
Member since Mar 2015
16864 posts
Posted on 2/3/21 at 3:48 pm
Starting with the College Drive flyover ramp from I-10.

quote:

LINK

Construction to simplify the process of exiting to College Drive from I-10 will begin in March, according to the Louisiana Department of Transportation and Development (DOTD).

The project will include a flyover from I-10 that will allow traffic to merge into the far right lanes of the interstate before College Drive, instead of having to cut across multiple lanes after the two interstates merge.

“The idea that we’re going to have nearly a half mile exit ramp for college from I-12 and I-10 is going to make that intersection a lot smoother and eliminate some of the mainline traffic and congestion you see on i-10,” said Dr. Shawn Wilson, Secretary of DOTD.

Wilson said construction on the flyover should be completed by 2022. Work will mostly be done at night and in the median to minimize any construction traffic.

This is just the first phase of a much larger project that will take several more years to complete. That project will ultimately widen I-10 through the heart of Baton Rouge, allowing for more traffic to flow through town.

“The millions of dollars we’re going to spend on this improvement are going to be worth it,” Wilson said. “The difficulty of these times of construction will pay off in the end.”


It's worth the headache.
Posted by fallguy_1978
Best States #50
Member since Feb 2018
48556 posts
Posted on 2/3/21 at 3:49 pm to
I'm glad that I never really drive that stretch.
Posted by thermal9221
Youngsville
Member since Feb 2005
13254 posts
Posted on 2/3/21 at 3:49 pm to
Everyone is going to hate the construction companies. As if they just design closures and stuff.
Posted by fightin tigers
Downtown Prairieville
Member since Mar 2008
73681 posts
Posted on 2/3/21 at 3:49 pm to
Bookmarking.

What yall got for a completion date?

February 2024
This post was edited on 2/3/21 at 3:51 pm
Posted by goofball
Member since Mar 2015
16864 posts
Posted on 2/3/21 at 3:50 pm to
quote:

Everyone is going to hate the construction companies. As if they just design closures and stuff.



Just remember how fricked up traffic is in Baton Rouge. That's why they are doing all of this.
Posted by Cosmo
glassman's guest house
Member since Oct 2003
120274 posts
Posted on 2/3/21 at 3:50 pm to
quote:

Wilson said construction on the flyover should be completed by 2022.


Posted by BeepNode
Lafayette
Member since Feb 2014
10005 posts
Posted on 2/3/21 at 3:52 pm to
I made it a point to live somewhere that I can avoid traffic spillover from interstate backups.

Go North, my friends.
Posted by TDsngumbo
Alpha Silverfox
Member since Oct 2011
41613 posts
Posted on 2/3/21 at 3:52 pm to
Take the money and put it towards a better entrance to the bridge. Stop treating the symptoms and start treating the problem. That area wouldn't be backed up, causing some of the issues getting to the far right lanes, in the first place if people could get to the bridge using more than one lane.
Posted by Jim Rockford
Member since May 2011
98188 posts
Posted on 2/3/21 at 3:52 pm to
I guess the Bocage NIMBYS didn't have as much stroke as they thought they did.
Posted by Bard
Definitely NOT an admin
Member since Oct 2008
51628 posts
Posted on 2/3/21 at 3:53 pm to
Well, if the COVID lockdown lasts a few years longer the work won't cause that much of an issue and we won't really need it once it's done.













Posted by WillieD
Lafayette/BR
Member since Apr 2014
2016 posts
Posted on 2/3/21 at 3:55 pm to
Serious question.
When will the Washington St. exit close? The new exit has been open.
Posted by fightin tigers
Downtown Prairieville
Member since Mar 2008
73681 posts
Posted on 2/3/21 at 3:55 pm to
Just a quick look shows the estimate was 30MM in 2019 and ballooned to a 52MM 2020 estimate.

65MM when done with changeorders?
Posted by Eat Your Crow
caught beneath the landslide
Member since May 2017
9190 posts
Posted on 2/3/21 at 3:58 pm to
quote:

It's worth the headache.

Certainly.

I didn't read your entire article. Does it mention anything about a construction company doing the work?
Posted by BeepNode
Lafayette
Member since Feb 2014
10005 posts
Posted on 2/3/21 at 3:58 pm to
quote:

changeorders?


that’s where the real money is.
Posted by tommy2tone1999
St. George, LA
Member since Sep 2008
6773 posts
Posted on 2/3/21 at 4:04 pm to
Starting to think Baton Rouge means Orange Barrel in French
Posted by fightin tigers
Downtown Prairieville
Member since Mar 2008
73681 posts
Posted on 2/3/21 at 4:05 pm to
quote:

Does it mention anything about a construction company doing the work?


Had heard Boh Bros originally
Posted by beerJeep
Louisiana
Member since Nov 2016
35038 posts
Posted on 2/3/21 at 4:06 pm to
Good thing government street, one of the main arteries used to get out of downtown without getting on the interstate has been successfully dieted just in time for this to start!


/s
Posted by Ed Osteen
Member since Oct 2007
57486 posts
Posted on 2/3/21 at 4:08 pm to
quote:

Wilson said construction on the flyover should be completed by 2022


this is hilarious, just a straight up lie
Posted by gjackx
Red Stick
Member since Jan 2007
16523 posts
Posted on 2/3/21 at 4:08 pm to
quote:

Serious question.
When will the Washington St. exit close? The new exit has been open.

I've been wondering this for a while myself. The idea was there would not be both, and here we've been having to deal with both for a long while now
Posted by Armymann50
Playing with my
Member since Sep 2011
17067 posts
Posted on 2/3/21 at 4:12 pm to
quote:

What yall got for a completion date?

February 2024



phase one only
first pageprev pagePage 1 of 3Next pagelast page

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram