Any issues with pouring concrete for deck footings in the South in January?

Posted on 1/12/16 at 3:22 pm
Posted by GetCocky11
Calgary, AB
Member since Oct 2012
53509 posts
Posted on 1/12/16 at 3:22 pm
Highs around 50 and lows around 30. Should I expect any issues?

Should I add an accelerant to the mixture?
Posted by CarRamrod
Spurbury, VT
Member since Dec 2006
58629 posts
Posted on 1/12/16 at 3:24 pm to
read the spec.
Posted by LNCHBOX
70448
Member since Jun 2009
89397 posts
Posted on 1/12/16 at 3:25 pm to
quote:

read the spec.


What this guy said.
Posted by GetCocky11
Calgary, AB
Member since Oct 2012
53509 posts
Posted on 1/12/16 at 3:31 pm to
Yeah I know. I was just looking for some personal experiences.

Hopefully the tubes and being mostly below ground will keep the concrete above freezing long enough. I'll look at adding an accelerator too.
Posted by jose canseco
Houston via Houma via BR via NOLA
Member since Jul 2007
5667 posts
Posted on 1/12/16 at 3:32 pm to
Won't be an issue. Especially if it just for a Deck.
Posted by LNCHBOX
70448
Member since Jun 2009
89397 posts
Posted on 1/12/16 at 3:34 pm to
You really shouldn't have an issue at the temp range you're talking about.
Posted by GetCocky11
Calgary, AB
Member since Oct 2012
53509 posts
Posted on 1/12/16 at 3:36 pm to
Cool, thanks for the replies.
Posted by Breesus
Unplug
Member since Jan 2010
69549 posts
Posted on 1/12/16 at 3:36 pm to
That depends, do you know how to pour concrete?
Posted by BLM
ATL
Member since Oct 2011
786 posts
Posted on 1/12/16 at 3:36 pm to
Won't be a problem especially if you add the accelerant. Getting full sun on days like today will help as well.
Posted by tigerbutt
Deep South
Member since Jun 2006
26446 posts
Posted on 1/12/16 at 4:23 pm to
Slower it dries the more strength you have. Do not add anything.
Posted by tigerbutt
Deep South
Member since Jun 2006
26446 posts
Posted on 1/12/16 at 4:24 pm to
The ground itself will keep it warm enough to keep from freezing.
C'mon man!
Posted by CarRamrod
Spurbury, VT
Member since Dec 2006
58629 posts
Posted on 1/14/16 at 9:39 am to
concrete doesnt dry
Posted by Agforlife
Somewhere in the Brazos Valley
Member since Nov 2012
20102 posts
Posted on 1/14/16 at 9:52 am to
Shouldn't be a problem, they're going to send you a winter mix. You can have them put 2% calcium in it if you want but you really don't need it.
Posted by NYNolaguy1
Member since May 2011
21849 posts
Posted on 1/14/16 at 9:54 am to
Our standard specs instruct the contractor to heat the vicinity of recently poured concrete to above 40° F until either 28 day strength is achieved or until ambient temperature is above 40. Usually this is done with a heated enclosure.

With that said, read the spec for the concrete you are pouring. Accelerants can really weaken the pour if you don't know what you're doing.

I was once on a job where a contractor didn't heat the area, and the concrete began cracking prematurely. Contractor was responsible for the demolition and replacement of all subpar concrete. Ironically the job was in LA, and it wasn't cheap, especially because it happened toward the end of the job.
Posted by poochie
Houma, la
Member since Apr 2007
6765 posts
Posted on 1/14/16 at 9:57 am to
Jesus, this is for a deck, not a parking garage. You could pour quikrete and use a water hose in just above freezing weather and have no issues!
Posted by elprez00
Hammond, LA
Member since Sep 2011
31630 posts
Posted on 1/14/16 at 10:02 am to
Technically speaking, for most applications you shouldn't place unless the temp is 40 and rising. It's not cold enough here to worry about the ground. Main issue is going to be it's going to take forever to set up. Sunshine will help.
Posted by NYNolaguy1
Member since May 2011
21849 posts
Posted on 1/14/16 at 10:07 am to
quote:

Technically speaking, for most applications you shouldn't place unless the temp is 40 and rising. It's not cold enough here to worry about the ground. Main issue is going to be it's going to take forever to set up. Sunshine will help.


I could be wrong but I think the OP is in South Carolina...
Posted by Mmackl1
Member since May 2011
250 posts
Posted on 1/14/16 at 10:12 am to
Don't put 2% calcium in it. If you have someone who has never worked with concrete it can kick their arse by setting up too fast. Its a damn deck for crying out loud.

I will pour slabs and paving with the temp 40* and rising, like other have said, it is in the ground.
Posted by CCTider
Member since Dec 2014
25240 posts
Posted on 1/14/16 at 10:29 am to
If you're just talking about pouring some quickcrete into some post holes, it's not a big deal. Pour out, and wait a week. That should get it up acceptable strength. Don't trying adding any accelerators, you'll probably comprise the strength if you do it yourself, and I doubt you have access to quality admixtures. If you get it from ready mix company, then you can do that.


If anything, make sure it's being placed on a stable base. Clean the holes out really good to prevent any settling. Then your deck is going to be crap. I hope you don't have gumbo clay in the backyard.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on X, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookXInstagram