- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
re: STLHF
Posted on 5/20/20 at 8:25 pm to SmackoverHawg
Posted on 5/20/20 at 8:25 pm to SmackoverHawg
quote:
Smackover Brine formation
quote:
SmackoverHawg
checks out
Interesting stuff. Will have to look deeper.
Posted on 5/20/20 at 8:32 pm to AU_RX
Well it’s not available on Robinhood
Posted on 5/20/20 at 8:37 pm to Whodatforlife21
Get a real account on E*TRADE or some place. Robinhood doesn’t have all stocks available.
Posted on 5/20/20 at 10:21 pm to SmackoverHawg
You sure the arkie brines have decent lithium concentrations? The facilities there are all bromine producers with Albemarle having their us lithium operation in Nevada.
Edit - did more research seems to have decent ppm - 400-500 ppm - but still it’s tough to see how it will be cost affective vs the south American operations which have a 1500 ppm lithium starting basis.
Know what the tail water brine lithium concentrations are?
Also the lithium market is in the shitter at moment with demand plunged off a cliff
Edit - did more research seems to have decent ppm - 400-500 ppm - but still it’s tough to see how it will be cost affective vs the south American operations which have a 1500 ppm lithium starting basis.
Know what the tail water brine lithium concentrations are?
Also the lithium market is in the shitter at moment with demand plunged off a cliff
This post was edited on 5/20/20 at 10:36 pm
Posted on 5/20/20 at 11:41 pm to eng08
Posted on 5/21/20 at 6:42 am to Whodatforlife21
quote:
Well it’s not available on Robinhood
get out of the sticks man.
TDA, etrade, etc are all free to use
Posted on 5/21/20 at 10:52 am to cgrand
Etrade still charges a fee for penny stocks. Fidelity does not.
Posted on 5/21/20 at 11:35 am to SmackoverHawg
That’s 2018 article and sponsored by the company.
I read some more recent ones last night before my edit above, seems pipe dreamish but I’ll toss some coin in there
I read some more recent ones last night before my edit above, seems pipe dreamish but I’ll toss some coin in there
Posted on 5/21/20 at 11:55 am to eng08
quote:
I read some more recent ones last night before my edit above, seems pipe dreamish but I’ll toss some coin in there
can you link the new articles? I'd love to read them
Posted on 5/21/20 at 12:52 pm to My2ndFavCivilNgineer
Same. I’d like to hear the other side. Obviously the price of lithium has tanked, but there will be a market. The stuff I’ve read sounds good, but you never know with these OTC stocks.
Posted on 5/21/20 at 3:52 pm to AU_RX
FWIW, I looked up their projects in IIR. A couple of highlights:
- Smackover El Dorado (Lanxess) project will be completed in three phases.
- Estimated completion dates:
-- Phase 1 in Q4 2021 - Q1 2022
-- Phase 2 in Q4 2024 - Q1 2025
-- Phase 3 in Q4 2026 - Q1 2027
- Total expected production of battery-grade lithium carbonate at completion of phase 3 is 20,900 tonnes/year.
- Based on the projected feed rates, the breakout (in total production at the completion of each phase) appears to be:
-- Phase 1: 4,100 T/yr
-- Phase 2: 15,000 T/yr
-- Phase 3: 20,900 T/yr
- The Lewisville (Tetra) project appears to still be in very early phases. They have estimated the reserves, but I don't see any projections of production rates.
- S&P is projecting global lithium carbonate production to rise to ~1.25MM T/yr by 2022 (completion of phase 1) with US production rising to roughly 75,000 T/yr. So this facility is considerably smaller in terms of the global market than the initial 100,000 T/yr claims would suggest. If there are plans to get to 100,000 T/yr in the Smackover Formation, it's going to take a while.
- Smackover El Dorado (Lanxess) project will be completed in three phases.
- Estimated completion dates:
-- Phase 1 in Q4 2021 - Q1 2022
-- Phase 2 in Q4 2024 - Q1 2025
-- Phase 3 in Q4 2026 - Q1 2027
- Total expected production of battery-grade lithium carbonate at completion of phase 3 is 20,900 tonnes/year.
- Based on the projected feed rates, the breakout (in total production at the completion of each phase) appears to be:
-- Phase 1: 4,100 T/yr
-- Phase 2: 15,000 T/yr
-- Phase 3: 20,900 T/yr
- The Lewisville (Tetra) project appears to still be in very early phases. They have estimated the reserves, but I don't see any projections of production rates.
- S&P is projecting global lithium carbonate production to rise to ~1.25MM T/yr by 2022 (completion of phase 1) with US production rising to roughly 75,000 T/yr. So this facility is considerably smaller in terms of the global market than the initial 100,000 T/yr claims would suggest. If there are plans to get to 100,000 T/yr in the Smackover Formation, it's going to take a while.
Posted on 5/21/20 at 4:13 pm to lostinbr
not to mention ALB could likely swallow them whole without even a burp if they wanted to
Posted on 5/27/20 at 8:03 am to eng08
quote:
That’s 2018 article and sponsored by the company.
I read some more recent ones last night before my edit above, seems pipe dreamish but I’ll toss some coin in there
can you link the articles
Posted on 6/2/20 at 4:39 pm to Playmaker7
quote:
Up as much as 15% today
Was coming to say the same thing. I bought 258 shares at .69 on 5/21/20 and this thing is slowly climbing.
Posted on 6/3/20 at 8:48 am to Playmaker7
bump.. is this thing getting pumped right now?
Posted on 6/3/20 at 9:01 am to My2ndFavCivilNgineer
Looks like someone anchored this it's not going to the front page.
Posted on 6/3/20 at 9:07 am to Playmaker7
Good last two days on this one.
Posted on 6/3/20 at 9:08 am to My2ndFavCivilNgineer
Not pumped.
There was some sort of electric car show last week where these guys were at, or something. Believe that’s where the pump is coming from. That and I think their Eldorado AR plant may be working out.
There was some sort of electric car show last week where these guys were at, or something. Believe that’s where the pump is coming from. That and I think their Eldorado AR plant may be working out.
Posted on 6/3/20 at 10:20 am to SmackoverHawg
So I threw $500 in at .60 cents. Approaching $1.00 toady. Anyone else like this company for its potential to make some money as a lottery ticket?
Popular
Back to top
