Still doing work on the bridge just after the intersection. Have not seen any dirt work other than that at the moment.
Posted by doubleb
Baton Rouge
Member since Aug 2006
36187 posts
Posted on 4/29/19 at 1:32 pm to
quote:


Still doing work on the bridge just after the intersection. Have not seen any dirt work other than that at the moment.


They have been installing large box culverts and the plan appears to go to the culverts and not a traditional bridge as they’ve had before.

They have also done some major drainage work on 30 where those apartments and shuttered convenience store are. They have also doing some drainage work between 30 and the RR track.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram